HomeMy WebLinkAbout2005-046 Council Resolution•
City of Lino Lakes
Resolution No. 05 -46
Supporting Legislation Request -
North Metro I -35W Corridor Coalition
WHEREAS: Communities in the North I -35W Corridor area in Ramsey and Anoka
Counties have been working together to collaborate and coordinate public and private
investments in housing, economic development and transportation, and,
WHEREAS: This cooperation has included the Metropolitan Council and the Minnesota
Department of Transportation, and,
WHEREAS: Our communities are actively engaged in significant development and
redevelopment programs that will have significant benefits to the Region as well as our
local economies, and,
WHEREAS: These developments will provide job opportunities for residents of the
region, business opportunities for entrepreneurs, access to goods and services for citizens
and tax base for our communities, and,
WHEREAS: We recognize the importance of a healthy regional transportation
infrastructure that serves trade and tourism mobility and safety for transcontinental
travelers and businesses as well as travelers to and from the Metropolitan region to other
opportunities in Minnesota, and,
WHEREAS: We recognize the need to serve regional mobility at the same time that we
ensure that our citizens and businesses are provided safe and convenient access to and
from the regional system into local opportunity sites, and,
WHEREAS: Current traffic flow conditions on North I -35W are already congested
causing delays, accidents, air pollution and diminishing mobility, and,
WHEREAS: Forecasted growth in population and jobs within the Region and within the
Corridor will further severely congest and diminish the function and safety of the
regional system, and,
WHEREAS: It is in the interests of the Region and State to mitigate the current and
anticipated problems at this juncture of two high priority Inter Regional Corridors with
the Metro Beltway,
NOW THEREFORE BE IT RESOLVED: That the Council of the City of Lino Lakes
does request that the Legislature appropriate funds sufficient to provide for the
identification of preferred system design solutions for the I -35W/ TH 10 highway
interchange in Ramsey and Anoka County along with appropriate county and city streets,
and,
—(BA -
-
•
•
•
BE IT FURTHER RESOLVED: That these funds should be appropriated to the
Commissioner of Transportation to complete community involvement activities,
alternative concept development, concept evaluation, preliminary engineering and
environmental assessment, and,
BE IT FINALLY RESOLVED: That the City Council of the City of Lino Lakes does
hereby pledge to work with the Department of Transportation, Anoka County, Ramsey
County and the Metropolitan Council to ensure that the requested funds are used in a
cooperative and efficient manner.
Approved this, Day of March, 2005.
•
•
•
WORK SESSION STAFF REPORT
Work Session Item No. 1
Date: Council Work Session, Wednesday, March 23, 2005
To: City Council
From: Gordon Heitke, City Administrator
Re:
Supporting Legislation Request for Appropriating Money for
Engineering for the Reconstruction and Expansion of I35 Between I-
694 and I -35W.
Background:
The North I -35W communities are requesting that the Legislature appropriate $500,000
to be used for the development and evaluation of alternative concepts for the
reconstruction of I -35W north of I -694 in Arden Hills, Mounds View and New Brighton.
The requested funds will be used to identify roadway design options, evaluate the
operational characteristics of selected alternatives and to provide for community
involvement in the planning process. Mr. Robert Benke, North Metro I -35W Corridor
Coalition has requested an opportunity to appear before the City Council to request a
resolution supporting the legislation.
As you know, the City of Lino Lakes has had bills introduced, which call for the
appropriation of state bond funds for improvements to the I35W /CSAH 23 (Lake Drive)
interchange. The funding request of the North I -35W communities is also a request for
the appropriation of state bond funds. Since the amount of proposed projects will most
likely exceed the total bond amount, it is reasonable to require that the North Metro I-
35W Corridor Coalition, in turn, support Lino Lakes' legislation request for interchange
improvement funding if the City of Lino Lakes supports this funding request, in order to
not put ourselves at any disadvantage to receive funding.
The resolution has been adopted by New Brighton, Mounds View, Circle
Pines, Arden Hills, Blaine, Shoreview, Lexington and the Ramsey County
1
• Board. The Anoka County Board is expected to approve it at their Tuesday, March 22,
2005 meeting.
Requested Council Direction:
The Council needs to determine: 1) whether it is in the best interest of Lino Lakes to
support the funding request of the North I -35W communities, 2) whether to request
support from the North Metro I -35W Corridor Coalition for the legislation for funding
improvements for the I -35W /CSAH 23 interchange, and 3) whether to place this item on
the March 28, 2005 agenda as an item for formal action.
Attachments:
1. North Metro I -35W Corridor Coalition Legislation Request and Resolution
•
•
2
NORTH METRO I -35W CORRIDOR COALITION
8525 Edinbrook Crossing, Suite #5
Brooklyn Park, MN 55443
LEGISLATION REQUEST
REQUEST: The North 1 -35W communities are requesting that the Legislature
appropriate $500,000 to be used for the development and evaluation of alternative
concepts for the reconstruction of I -35W north of 1 -694 in Arden Hills, Mounds View
and New Brighton.
BACKGROUND: The 1 -35W communities have been working with the Metropolitan
Council and Mn /DOT to identify infrastructure investments needed to accommodate
growth and redevelopment projects in the corridor. Work to date has identified
inadequacies in the regional transportation network that must be addressed to balance
area mobility with needs for local access. Additional work is needed to identify the
appropriate solutions to the identified problems. The requested funds will be used to
• identify roadway design options, evaluate the operational characteristics of selected
alternatives and to provide for community involvement in the planning process.
CURRENT STATUS: 1 -694 is part of the metropolitan area `beltway' that is in
Mn /DOT's priority plan for improvement to at least 6 lanes. Reconstruction of the
Snelling Avenue Interchange at the southerly limits of this project area was recently
delayed to after 2014 due to the lack of funding. Reconstruction of the I -694/I -35W
interchange, the second busiest in the metro area, is not scheduled until after the
Snelling project. Mn /DOT is working on the design of these projects, including a limited
portion of I -35W. These schedule dates will accelerate if the Legislature provides new
transportation funding during the 2005 Session. Both I -35W and TH 10 are Inter
Regional Corridor routes that merge together in the proposed study area that includes
three major redevelopment projects.
In addition to the rapidly growing Blaine and outer ring suburbs, Arden Hills, Mounds
View and New Brighton are working on projects that will return contaminated lands to
the tax rolls, providing new homes and jobs in the process. These projects include:
ARDEN HILLS: Redevelopment of the Twin Cities Army Ammunition Plant (TCAAP).
Where currently there are worn out munitions manufacturing facilities and
contaminated lands, the City envisions:
• 2200 new homes
•
• 3.2 Million Square Feet of commercial, retail and office space
• $875 Million in tax base compared to current taxable value of $0.
U:AI -35W \2005 LEGISLATION \LEG.REQUEST SUPPORT.DOC
MOUNDS VIEW: New Corporate Campus for Medtronic. Where currently there is a
municipal golf course, the City envisions:
• 2000 jobs
• 1.5 Million Square Feet of medical technology research and manufacturing
• $120 Million in tax base compared to current taxable value of $0.
NEW BRIGHTON: Northwest Quadrant Development. Where currently there are old,
worn out industrial buildings and contaminated lands, the city envisions:
• 750 new homes
• 750,000 Square Feet of commercial, office and retail space
• $300 Million in tax base compared to current taxable value of $13 million
DILEMMA TO BE SOLVED WITH REQUESTED FUNDS:
Providing local access will be a major problem when I -35W is rebuilt due to proximity of
existing interchanges and the interdependency of needs in the adjacent cities. Trade
offs in local access options cannot be resolved without knowing what the regional
freeway design will be and what interim measures will be needed.
Despite being an Inter Regional Corridor route and including a segment of another on
TH 10 plus connecting to the metro beltway, I -35W is designated as a "Management"
category route and not an "Expansion" route in the Metropolitan Council's 2030
Transportation Policy Plan. Due to financial constraints, critically needed capacity
expansions on I -35W are not programmed in the foreseeable future. Management
category improvements can include reconstruction of up to two contiguous
interchanges.
In order for Mn /DOT and the affected communities to proceed with design and
construction of individual interchanges needed to meet local access requirements and
to mitigate already severe congestion problems, a plan for the ultimate reconstruction
of I -35W is needed so that all of the subsequent pieces fit together. The requested
funds will provide the parameters of the future system design that will facilitate further
improvements. This will enable the communities to move forward with greater
knowledge of interim actions needed to accommodate inevitable growth.
COMMUNITY SUPPORT: The following have approved resolutions in support of this
funding request:
Resolution Approvals (Pending)
City of New Brighton (2/8) City of Circle Pines
City of Blaine(2 /17) City of Lexington
City of Mounds View(2 /14) City of Lino Lakes
City of Arden Hills Ramsey County Board
City of Shoreview Anoka County Board
U: \I -35W \2005 LEGISLATION \LEG.REQUEST SUPPORT.DOC
Lake Dr
PRIMARY STUDY
AREA
MEDTRONIC
County Rd
Cot,nty Rd I
- UNWEAVE THE
WEAVE III"
County Rd H
County Rd 10
TCAAP
hwy yo
NW
QUADRANT
ILexington Ave
"UNWEAVE THE
WEAVE II"
• UNWEAVE
THE WEAVE T ""
IT._ *V
Data Sources:
2003 FSA Photo
New Brighton GIS
a
1 0.5 0 1 Miles
•
•
Draft
A bill for an act
Relating to capital improvements; authorizing the
issuance of state bonds; appropriating money for the
preparation and evaluation of engineering concepts and layouts for the
reconstruction and expansion of 1-35W between I -694 and
I -35 in Anoka and Ramsey County.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA:
Section 1. (APPROPRIATION)
$500,000 is appropriated from the bond proceeds fund to the commissioner of transportation
for the development and evaluation of engineering concepts and layouts for the reconstruction
of 1-35W from I -694 in Ramsey County to I -35 in Anoka County. This appropriation shall be
available for the conduct of all necessary planning and public involvement actions leading to
a scoping decision based on the preferred alternative. Plans for I -35W shall identify all
necessary improvements to appropriate segments of TH 10, I -694 and related county and city
infrastructure.
Section 2. (BOND SALE)
To provide the money appropriated in section lfrom the bond proceeds account in the trunk
highway fund, the commissioner of finance shall sell and issue bonds of the state in an
amount up to $500,000 in the manner, upon the terms. and with the effect prescribed by
Minnesota Statutes. sections 167.50 to 167.52, and by the Minnesota Constitution, article
XIV, section 11 at the times and in the amounts requested by the commissioner of
transportation. The proceeds of the bonds, except accrued interest and any premium received
from the sale of the bonds, must be deposited in the bond proceeds account in the trunk
highway fund.
Section 3. (Effective Date)
Sections 1 and 2 are effective the day following final enactment.
F:\ Users\ I- 35W\2005 Legislation\I- 35WFunds 2.07.05.doc
• February 9, 2005
•
•
RESOLUTION
WHEREAS: Communities in the North I -35W Corridor area in Ramsey and
Anoka Counties have been working together to collaborate and coordinate public
and private investments in housing, economic development and transportation,
and,
WHEREAS: This cooperation has included the Metropolitan Council and the
Minnesota Department of Transportation, and,
WHEREAS: Our communities are actively engaged in significant development
and redevelopment programs that will have significant benefits to the Region as
well as our local economies, and,
WHEREAS: These developments will provide job opportunities for residents of
the region, business opportunities for entrepreneurs, access to goods and
services for citizens and tax base for our communities, and,
WHEREAS: We recognize the importance of a healthy regional transportation
infrastructure that serves trade and tourism mobility and safety for
transcontinental travelers and businesses as well as travelers to and from the
Metropolitan region to other opportunities in Minnesota, and,
WHEREAS: We recognize the need to serve regional mobility at the same time
that we ensure that our citizens and businesses are provided safe and
convenient access to and from the regional system into local opportunity sites,
and,
WHEREAS: Current traffic flow conditions on North I -35W are already congested
causing delays, accidents, air pollution and diminishing mobility, and,
WHEREAS: Forecasted growth in population and jobs within the Region and
within the Corridor will further severely congest and diminish the function and
safety of the regional system, and,
WHEREAS: It is in the interests of the Region and State to mitigate the current
and anticipated problems at this juncture of two high priority Inter Regional
Corridors with the Metro Beltway,
NOW THEREFORE BE IT RESOLVED: That the Council of the City of does
• request that the Legislature appropriate funds sufficient to provide for the
identification of preferred system design solutions for the I -35W/ TH 10 highway
interchange in Ramsey and Anoka County along with appropriate county and city
streets, and,
BE IT FURTHER RESOLVED: That these funds should be appropriated to the
Commissioner of Transportation to complete community involvement activities,
alternative concept development, concept evaluation, preliminary engineering
and environmental assessment, and,
BE IT FINALLY RESOLVED: That the City Council of the City of does
hereby pledge to work with the Department of Transportation, Anoka County,
Ramsey County and the Metropolitan Council to ensure that the requested funds
are used in a cooperative and efficient manner.
Approved this Day of February, 2005.
Mayor
•
F: \Users \I -35W \Events \05 Action Plan \RESOLUTION draft.doc
•