Loading...
HomeMy WebLinkAbout2005-099 Council Resolution• • • CITY OF LINO LAKES RESOLUTION NO. 05 -99 RESOLUTION AUTHORIZING THE PREPARATION OF PLANS AND SPECIFICATIONS - 2005 SURFACE WATER MANAGEMENT PROJECT WHEREAS, it is proposed to perform maintenance activities on several storm water facilities, and WHEREAS, it is proposed to finance the project using Stormwater Management Funds, and WHEREAS, it is proposed to advertise for bids to construct the proposed improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The City Engineer, James E. Studenski, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. Adopted by the Lino Lakes City Council this 25th day of July, 2005. Ann J. Bla'3 City Clerk • AGENDA ITEM! 6F STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: July 25, 2005 TOPIC: Resolution No. 05 -99, Authorizing Preparation of Plans and Specifications, 2005 Surface Water Management Project. VOTE REQUIRED: Simple Majority BACKGROUND: After storm water ponds and drainage ways are constructed, they require periodic maintenance to ensure their effectiveness. Trapper's Crossing, Clearwater Creek, Blackbird Lane, East Rondeau Lake Road, and Otter Lake Road have been identified as areas for maintenance in 2005. Sites for maintenance in 2005 will be further defined in the plans and specifications. The maintenance activity required at these sites is more extensive than what is typically undertaken by Public Works staff. They have been combined into one project in order to minimize mobilization costs. If, after we begin preparation of the construction documents, discover the cost of a specific maintenance activity far outweighs the benefit, we may recommend reductions in the project scope. • In addition, we will be reviewing 20% of the City's MS4 outfalls, sediment basins, storm sewers, and ponds to comply with NPDES requirements. The funding for this work is provided by the Surface Water Management Fund. This fund was established in 1992 as a revenue source in order to meet the "administrative, planning, ponding, mitigation, and water quality needs" of the City. It is reimbursed through assessments to new subdivisions and is also collected as property owners connect to City utilities. The schedule for this project is as follows: City Council Authorizes Plans and Specifications City Council Approves Plans and Specifications City Council Authorizes Ad for Bids City Council Awards Contract Construction Begins July 25, 2005 August 8, 2005 August 8, 2005 September 12, 2005 September, 2005 OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 05 -99 authorizing preparation of plans and specifications for the 2005 Surface Water Management project. 3. Not adopt Resolution No. 05 -99. RECOMMENDATION: Option No. 2 - Staff recommends that Resolution Number 05 -99 be adopted. - 108 -