HomeMy WebLinkAbout2005-165 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 05 -165 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — CONSTRUCTION OF WELL NO. 5 PUMPHOUSE. WHEREAS, pursuant to an advertisement for bids for the Construction of Well No. 5 Pumphouse project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid EnComm Midwest, Inc. $448,844.00 Meyer $456,118.00 Rice Lake Construction Group $480,000.00 Meisinger Construction, Inc. $482,000.00 Magney Construction, Inc. $495,800.00 Lund Martin Construction, Inc. $520,000.00 Engineer's Estimate $472,000.00 AND WHEREAS, it appears that Encomm Midwest, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with EnComm Midwest, Inc. in the name of the City of Lino Lakes for the Construction of Well No. 5 Pumphouse according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the Lino Lakes City Council this 24th day of October, 2005. Jea ►�• er, Deputy Clerk John,'. Ber• 'son, ayor TABULATION OF BIDS CONSTRUCTION OF WELL PUMPHOUSE NO. 5 CITY OF LINO LAKES, MINNESOTA PROJECT NO. 13089.002 BIDS OPENED: OCTOBER 18, 2005, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ENCOMM ESTIMATE MIDWEST, INC ITEM TOTAL TOTAL TKDA ENGINEERS • ARCHITECTS • PLANNERS LUND MARTIN MAGNEY CONST INC. CONST. INC TOTAL TOTAL BASE BID PROPOSAL For the complete construction of all work shown on the Contract Drawings and Specifications for Construction of Well Pumphouse No. 5, including, but not limited to, all general, mechanical, process, watermain, electrical, driveway, landscaping, and site work, for the Lump Sum Price of: $ 472,000.00 $ 448,844.00 $ 520,000.00 $ 495,800.00 BASE BID DEDUCT NO. 1 Chlorination equipment by an alternate manufacturer: $ - $ 3,650.00 $ 4,000.00 $ 4,000.00 BASE BID DEDUCT NO. 2 $ 5,000.00 Variable- Frequency Drive (VFD) by an alternate manufacturer: $ - $ 6,350.00 $ 6,500.00 BASE BID DEDUCT NO. 3 • System Integrator by an alternate System Integrator: $ - $ - $ - $ - MEISINGER MEYER RICE LAKE CONST INC. CONTRACTING CONST TOTAL TOTAL TOTAL BASE BID PROPOSAL For the complete construction of all work shown on the Contract Drawings and Specifications for Construction of Well Pumphouse No. 5, including, but not limited to, all general, mechanical, process, watermain, electrical, driveway, landscaping, and site work, for the Lump Sum Price of: $ 482,000.00 $ 456,118.00 $ 480,000.00 BASE BID DEDUCT NO . 1 Chlorination equipment by an alternate manufacturer: $ 5,500.00 $ 4,300.00 $ 5,000.00 BASE BID DEDUCT NO. 2 Variable- Frequency Drive (VFD) by an alternate manufacturer: $ 6,500.00 $ 6,500.00 — BASE BID DEDUCT NO. 3 System Integrator by an alternate System Integrator: $ - $ - $ , - Page 1 AGENDA ITEM 6E STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: October 24, 2005 TOPIC: Resolution No. 05 -165, Accepting Bids and Awarding Construction Contract, Construction of Well No. 5 Pumphouse. VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on October 18, 2005. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid EnComm Midwest, Inc. $448,844.00 Meyer $456,118.00 Rice Lake Construction Group $480,000.00 Meisinger Construction, Inc. $482,000.00 Magney Construction, Inc. $495,800.00 Lund Martin Construction, Inc. $520,000.00 Engineer's Estimate $472,000.00 The low bid is approximately 5% below the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. The final completion date for this project is June 9, 2006. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 05 -165, Accepting Bids and Awarding a Construction Contract to EnComm Midwest, Inc. for Construction of Well No. 5 Pumphouse. 3. Not adopt Resolution No. 05 -165. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 05 -165.