Loading...
HomeMy WebLinkAbout2005-195 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 05 — 195 RESOLUTION ORDERING IMPROVEMENTS AND THE PREPARATION OF PLANS AND SPECIFICATIONS — LOIS LANE UTILITY EXTENSION WHEREAS, a resolution of the City Council adopted the 25th day of July, 2005, fixed a date for a council hearing on the proposed improvement of Lois Lane from 270 feet west of Country Lane to 320 feet west of Meadow View Trail by extending utilities and replacing the bituminous surface, AND WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given, and the hearing was held thereon on the 22nd day of August, 2005, at which all persons desiring to be heard were given an opportunity to be heard thereon, AND WHEREAS, it is proposed to finance the project with special assessments and to have the deferred future lot assessments be paid with the Trunk Area and Unit Fund until those Tots are created, AND WHEREAS, it is proposed to advertise for bids to construct the proposed improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Such improvement is necessary, cost - effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the council resolution adopted the 12th day of December, 2005, pursuant to a petition of affected property owners. 3. The City Engineer, James E. Studenski, is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. 4. The City Council declares its official intent to reimburse itself for the costs of the improvements from the proceeds of the tax exempt bond. Adopted by the Lino Lakes City Council this 12th day of December, 2005. Attest: e Bartell ity Jerk Jo J. B geson, Mayor AGENDA ITEM 6Ei STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: December 12, 2005 TOPIC: Resolution No. 05 — 195, Ordering Improvements and Preparation of Plans and Specifications, Lois Lane Utility Extension VOTE REQUIRED: Simple Majority BACKGROUND: The residents along Lois Lane petitioned for the extension of sanitary sewer and water along Lois Lane. A feasibility study for this proposed project was prepared by TKDA and received at the July 25th, 2005 City Council Meeting. This study revealed a total project cost of $395,762.50. The project will be 100% assessed to the benefiting properties. It was decided at the November 22, 2005 City Council Work Session to defer all future lot assessments. Therefore, the project will be funded partially by special assessments, and all deferred lot assessments will be funded by the Trunk Area and Unit Fund. When the future lots are created, they will be assessed at that time. The schedule for this project is as follows: Authorize Plans and Specifications Approve Plans /Specifications and Authorize Ad for Bids Call for Hearing and Declare Cost to be Assessed Hold Hearing and Award Contract Construction Begins December 12, 2005 March, 2006 April, 2006 May, 2006 June, 2006 OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 05 — 195 Ordering Improvements and Preparation of Plans and Specifications for the Lois Lane Utility Extension. 3. Not adopt Resolution No. 05 — 195. RECOMMENDATION: Option No. 2 - Staff recommends that Resolution Number 05 — 195 be adopted. •