Loading...
HomeMy WebLinkAbout2006-092 Council Resolution• Council Member Reinert introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 06 -92 RESOLUTION APPROVING 2ND AVENUE & WILDFLOWER DRIVE STORM SEWER MAINTENANCE WHEREAS, the City is responsible for maintaining its storm sewer system. AND WHEREAS, the corrective measures are unable to be performed by City Staff. AND WHEREAS, the following quotes were received: Contractor Quote Amount Infratech (cleaning and sealing) $ 19,184.00 Infratech (lining) $ 29,980.00 Miller Pipeline Corp. $ 48,108.00 AND WHEREAS, it appears that Infratech (cleaning and sealing) provides the lowest quote amount; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF • LINO LAKES, MINNESOTA: The Mayor and Clerk are hereby authorized and directed to enter into a contract with Infratech, in the name of the City of Lino Lakes for the maintenance of the storm sewer system at the intersection of 2nd Avenue and Wildflower Drive according to the quote presented by Infratech approved by the City Council and on file in the office of the City Clerk. • Julaa'nn - Bartell, Ci C erk Adopted by the Lino Lakes City Council this 12th day of June, 2006. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Carlson and upon vote being taken thereon, the following voted in favor thereof: Reinert, Carlson O'Deonnll, Stoltz, Mayor Bergeson The following voted against same: Whereupon said resolution was declared duly passed and adopted. • • • AGENDA ITEM 6D STAFF ORIGINATOR: Jim Studenski, City Engineer COUNCIL MEETING DATE: June 12, 2006 TOPIC: Resolution No. 06 — 92, 2nd Avenue & Wildflower Drive Storm Sewer Maintenance Vote Required: Simple Majority BACKGROUND: Over the past couple of years it was discovered that the storm sewer section at the intersection of 2nd Avenue and Wildflower Drive was not functioning properly. Prior attempts to correct this have been unsuccessful. Recent investigation into the repair of this section revealed that the extent of the repair is far greater than was expected. Ultimately, three options have become available. The recommended and most economical one consists of cleaning and joint sealing the pipe at an estimated cost of $19,184.00. There are no funds budgeted or available for this extensive of a maintenance project within the Public Services Budget. In the absence of any general fund contingency, the only funding option available is the City's Surface Water Management Fund. RECOMMENDATION: Staff recommends that Resolution Number 06 — 92 be adopted. APR. 20.2006 12:17PM INFRATECH 7634286489 • April 20, 2006 Mr. Tim ilillesheim City of Lino Lakes Public Works 1189 Main Street Lino Lakes, MN 55014 NO. 906 Infratech Infrastructure Ti 21040 t Rc www Phone 763 /428 -648 ichnologies, Inc. :ommerce Boulevard gers, MN 55374-9341 irifratechcatalog. coin 3 • Fax 763 /428 -6489 RE: 54" x 36" ARCS PIPE JOINT SEALING Dear Mr. Hillesheim, Please review the following proposal and don't hesitate to call if you have any quest ons. Our proposal is as follows{ Cleaning Infratech will clean the 54" x 36" arch pipe with use of our Guzzler high volume suc lion equipment (we can also use our Jet /Vac equipment if applicable). The outfall area w 11 need to be pumped down and if applicable balled off. These service will be provided ® $210.00/hour, Plus appropriate dump charges — if applicable We estimate this cleaning to take approximately 1— 2 days. This will include the Guzzler, the suction hose trailer and appropriate personnel. Joint Sealing Infratech will provide joint sealing services with Sauereisens elastomeric fiber reinfi reed asphalt modified urethane gasket seal, NQ -F88. These services will include appropr ate surface preparation and application services. These services will be provided ® $989.00fioi t Thanks Tim. Let me know if you have any questions. Herbert Selvog President Infratech JHs.zx42ao6 An Equal Opportunity Employer APR. 20. 2006 12:18PM f -- INFRATECH 7634286489 NO. 906 P. 2 Sauerelsen Manhole ChimneySeal No. F -88 is an elastomeric lining com- posed of fiber - reinforced, asphalt -modi- fied urethane. ChimneySeal is used as a chemical- resistant membrane or gasket seal for the prevention of water Infiltra- tion. Manhole ChimneySeal has excellent adhesion to most substrates. As a high solids eiastomer, it is recommended when movement from temperature change or other causes will be encoun- tered. Manhole ChimneySeal maintains excel- lent elasticity and adhesion over a tem- perature range of -300F to 250 °F. The flexible barrier resists freeze/thaw stress- es and movement. When subjected to mechanical stress, the lining has nearly 100% recovery. Manhole ChimneySeal also resists alkalies, salts and acid ItHARACTERISTICS o Outstanding chemical resistance to acids and alkalies. a Remains flexible from -30 °F to 250 °F. o Easy to apply by hand. o Urethane -based elastomer. o Suitable for application on steel, brick or concrete substrates. o Excellent elasticity. AREA PREPARATION Temperature of Working Area Maintain an optimum temperature of 60° - 85 °F on air, substrate and material dur- ing mixing, application, and cure. Store material In the range of 65° - 80 °F for at least 48 hours before use, Surface Preparation urfaces should be made free of oil, ase. water, and other contaminants at may inhibit bond. This can be achieved by chemical deaning. ilk WI SAiJtiwIbN FN MANHOLE CHIMNEYSE1 ,L NO. F -88 PHYSICAL PROPERTIES Abrasion Elongation ASTM (0 -638) Shore A durometer Hardness ASTM (D -2240) , tensile atrengtI ASTM D- 8381 Water Absorption ASTM (D -570) 534 mg /1,000 cycles 126.4 % 48 54.1lb,lIn2 0.05% Physical properties were determined on specimens prepared under 1 iboratory conditions using applicable ASTM procedures. Actual field conditions may vs! ,' and yield different results; therefore, data are subject to reasonable deviation. Brick - The working substrate must be dry and firm enough to withstand Imposed loads during normal operation. Mechanical methods should be utilized to remove old paints, coatings, and deterio- rated mortar or brick. Abrasive blast or high - pressure water blast brick to obtain a uniform, sound substrate. All prepared surfaces must be allowed to dry prior to the Manhole ChimneySeal application. Concrete - The working substrate must be dry and have the necessary strength to withstand imposed loads during normal operation. For applications where Manhole ChimneySeal is recommended. All voids should be filled with Sauerelsen Underlayment No. F -120 or Filler Compound No. 209. The choice of under - layment will depend on the severity of the voids to be filled. Abrasive blast or high - pressure water blast concrete to remove laitance and to obtain a uniform surface texture exposing fine aggregate resembling coarse sand- paper. Regardless of preparation method used, all surfaces must be free of any loose deposits or contamination. Metal - Abrasive blast or mechanically abrade the metal surface to a nominal 2.5 mil profile employing a SSPC -SP 8 Commercial finish. All protrusions should be ground smooth to eliminate sharp edges. APPLICATION Mixing Packaging consists a tlzed containers of H; Resin Part B. Comi tents of Hardener Pa; 9. Using a slow sF motor affixed with a mix 3 - 5 minutes unt ed. Thorough mixing very Important, Mix only complete t which has begun to sr ed. Do not add any a component or mixed n prameasured, uni- rdener Part A and letely empty con- ; A into Resin Part sed 1/2 inch drill "Jiffy" type blade, thoroughly blend - ,ef t is material is :Itches. Material r, must be discard - tulterants to either aterlal. Installation Manhole ChimneySe nl is self - priming and applied at veri. 'us thicknesses depending upon ape ;,ification design parameters, Manhole ChimneySeal is easily applied by glow d hand (neoprene or rubber). The most I Tactical method of applying the product x (thin small diame- ter structures is to wit a the material on with a gloved hand or t owel. SETTING /CURIN Ili Curing of the Chimne !Seal lining is by chemical reaction. While Manhole ChimneySeal has an E :proximate work- ing time of 45 minutes initial set occurs In about one hour at 70 °F. Manhole ChimneySeal cures to 1 semi -soft, elas- tomerlc state. Protect t le installation site from water or chemical I prior to cure for 48 hours. INAPR. 20. 2006 12:19P INFRATECH 7634286489 TESTING January 2004 For specific applications, a holiday detec- tor can be utilized to ensure a continuous, pinhole -thee lining, Pinhole testing should occur after 24 hours at 700F using a Tinker & Rasor Holiday Detector or simi- lar model. Voltage will be dependent on coating thickness. Consult a Sauerelsen representative for details. COVERAGE Following Is typical coverage of No. F -88: 1- Gaijon Unit 12.8 ft2 at 1/8 -inch (125 mils) thick Actual coverage may vary depending on jobsite conditions and surface Irregular - ties. CLEAN -UP All equipment should be cleaned with a general orange solvent or mineral spirits within one (1) hour after use and after each day's use. If removal is required after cure, consult Sauereisen for recom- mendations. PACKAGING Ilon lnit Hardener Part A-.65 Ibs In a pint container Resin Part B - 6.9 Ibs in a 2 -gal, pail SHELF LIFE Sauereisen Manhole Chlmneyseal has a shelf life of one (1) year when stored in unopened, tightly sealed containers in a dry location at 70°F. If there is a doubt as to the quality of the materials, consult a Sauereisen representative. NO. 906 P. 3 CAUTION Consult Material Safell Data Sheets and container label Cautic n Statements for hazards in handling the ie materials. WARRANTY We warrant that our goc ds will conform to the description contaii led In the order, and that we have gooc title to all goods sold. WE GIVE NI ) WARRANTY, WHETHER OF MER( HANTABILITY, FITNESS FOR PURPC SE OR OTHER. WISE, EXPRESS OR h IIPLIED, OTHER THAN AS EXPRESS' Y SET FORTH HEREIN. We are glad to offer sugges- tions or to refer you to customers using Sauerelsen cements an 1 compounds for a similar application. Users shall deter- mine the suitability of the product for intended application be Fore using, and users assume all risk ant liability whatso- ever in connection therev Ith regardless of any suggestions as to aF plication or con- struction. In no event sl all we be liable hereunder or otherwise or incidental or consequential damages. Our liability and your exclusive remedy hi 'reunder or oth- erwise, in law or in et uity, shall be expressly limited to our 'solacement of non - conforming goods a• our factory or, at our sole option, to re aayment of the purchase price of non -con brming goods. o Distributors and agent In major cities throughout the v orld. Consult manufacturer for Iocat ,ins. o Information concemInl government safety regulations avai able upon request. o Sauereisen also prods as Inorganic compounds for asseml Iing, sealing, electrically insulating a id grouting. SIiEREISEt1 ..since 1899 180 Gamma Drive Pittsburgh, PA 15298 -2989 USA Phone 412.963.0303 Fax 12.963.7620 www.sauereisen.com 2002 0 Saucrsismn Pdnlad in U.SA.