HomeMy WebLinkAbout2006-092 Council Resolution•
Council Member Reinert introduced the following resolution and moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 06 -92
RESOLUTION APPROVING 2ND AVENUE & WILDFLOWER DRIVE STORM SEWER
MAINTENANCE
WHEREAS, the City is responsible for maintaining its storm sewer system.
AND WHEREAS, the corrective measures are unable to be performed by City Staff.
AND WHEREAS, the following quotes were received:
Contractor Quote Amount
Infratech (cleaning and sealing) $ 19,184.00
Infratech (lining) $ 29,980.00
Miller Pipeline Corp. $ 48,108.00
AND WHEREAS, it appears that Infratech (cleaning and sealing) provides the lowest
quote amount;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
• LINO LAKES, MINNESOTA:
The Mayor and Clerk are hereby authorized and directed to enter into a contract
with Infratech, in the name of the City of Lino Lakes for the maintenance of the
storm sewer system at the intersection of 2nd Avenue and Wildflower Drive
according to the quote presented by Infratech approved by the City Council and on
file in the office of the City Clerk.
•
Julaa'nn - Bartell, Ci C erk
Adopted by the Lino Lakes City Council this 12th day of June, 2006.
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member Carlson and upon vote being taken thereon, the following voted in favor
thereof:
Reinert, Carlson O'Deonnll, Stoltz, Mayor Bergeson
The following voted against same:
Whereupon said resolution was declared duly passed and adopted.
•
•
•
AGENDA ITEM 6D
STAFF ORIGINATOR: Jim Studenski, City Engineer
COUNCIL MEETING DATE: June 12, 2006
TOPIC: Resolution No. 06 — 92, 2nd Avenue & Wildflower Drive Storm
Sewer Maintenance
Vote Required: Simple Majority
BACKGROUND:
Over the past couple of years it was discovered that the storm sewer section at
the intersection of 2nd Avenue and Wildflower Drive was not functioning properly.
Prior attempts to correct this have been unsuccessful. Recent investigation into
the repair of this section revealed that the extent of the repair is far greater than
was expected. Ultimately, three options have become available. The
recommended and most economical one consists of cleaning and joint sealing
the pipe at an estimated cost of $19,184.00.
There are no funds budgeted or available for this extensive of a maintenance
project within the Public Services Budget. In the absence of any general fund
contingency, the only funding option available is the City's Surface Water
Management Fund.
RECOMMENDATION:
Staff recommends that Resolution Number 06 — 92 be adopted.
APR. 20.2006 12:17PM INFRATECH 7634286489
• April 20, 2006
Mr. Tim ilillesheim
City of Lino Lakes Public Works
1189 Main Street
Lino Lakes, MN 55014
NO. 906
Infratech
Infrastructure Ti
21040 t
Rc
www
Phone 763 /428 -648
ichnologies, Inc.
:ommerce Boulevard
gers, MN 55374-9341
irifratechcatalog. coin
3 • Fax 763 /428 -6489
RE: 54" x 36" ARCS PIPE JOINT SEALING
Dear Mr. Hillesheim,
Please review the following proposal and don't hesitate to call if you have any quest ons.
Our proposal is as follows{
Cleaning
Infratech will clean the 54" x 36" arch pipe with use of our Guzzler high volume suc lion
equipment (we can also use our Jet /Vac equipment if applicable). The outfall area w 11
need to be pumped down and if applicable balled off.
These service will be provided ® $210.00/hour,
Plus appropriate dump charges — if applicable
We estimate this cleaning to take approximately 1— 2 days. This will include the
Guzzler, the suction hose trailer and appropriate personnel.
Joint Sealing
Infratech will provide joint sealing services with Sauereisens elastomeric fiber reinfi reed
asphalt modified urethane gasket seal, NQ -F88. These services will include appropr ate
surface preparation and application services.
These services will be provided ® $989.00fioi t
Thanks Tim. Let me know if you have any questions.
Herbert Selvog
President
Infratech
JHs.zx42ao6
An Equal Opportunity Employer
APR. 20. 2006 12:18PM
f --
INFRATECH 7634286489
NO. 906 P. 2
Sauerelsen Manhole ChimneySeal
No. F -88 is an elastomeric lining com-
posed of fiber - reinforced, asphalt -modi-
fied urethane. ChimneySeal is used as a
chemical- resistant membrane or gasket
seal for the prevention of water Infiltra-
tion.
Manhole ChimneySeal has excellent
adhesion to most substrates. As a high
solids eiastomer, it is recommended
when movement from temperature
change or other causes will be encoun-
tered.
Manhole ChimneySeal maintains excel-
lent elasticity and adhesion over a tem-
perature range of -300F to 250 °F. The
flexible barrier resists freeze/thaw stress-
es and movement. When subjected to
mechanical stress, the lining has nearly
100% recovery. Manhole ChimneySeal
also resists alkalies, salts and acid
ItHARACTERISTICS
o Outstanding chemical resistance to
acids and alkalies.
a Remains flexible from -30 °F to
250 °F.
o Easy to apply by hand.
o Urethane -based elastomer.
o Suitable for application on steel,
brick or concrete substrates.
o Excellent elasticity.
AREA PREPARATION
Temperature of Working Area
Maintain an optimum temperature of 60°
- 85 °F on air, substrate and material dur-
ing mixing, application, and cure. Store
material In the range of 65° - 80 °F for at
least 48 hours before use,
Surface Preparation
urfaces should be made free of oil,
ase. water, and other contaminants
at may inhibit bond. This can be
achieved by chemical deaning.
ilk WI
SAiJtiwIbN
FN
MANHOLE CHIMNEYSE1 ,L NO. F -88
PHYSICAL PROPERTIES
Abrasion
Elongation ASTM (0 -638)
Shore A durometer Hardness ASTM (D -2240) ,
tensile atrengtI ASTM D- 8381
Water Absorption ASTM (D -570)
534 mg /1,000 cycles
126.4 %
48
54.1lb,lIn2
0.05%
Physical properties were determined on specimens prepared under 1 iboratory conditions
using applicable ASTM procedures. Actual field conditions may vs! ,' and yield different
results; therefore, data are subject to reasonable deviation.
Brick - The working substrate must be dry
and firm enough to withstand Imposed
loads during normal operation.
Mechanical methods should be utilized to
remove old paints, coatings, and deterio-
rated mortar or brick.
Abrasive blast or high - pressure water
blast brick to obtain a uniform, sound
substrate. All prepared surfaces must be
allowed to dry prior to the Manhole
ChimneySeal application.
Concrete - The working substrate must
be dry and have the necessary strength
to withstand imposed loads during normal
operation. For applications where
Manhole ChimneySeal is recommended.
All voids should be filled with Sauerelsen
Underlayment No. F -120 or Filler
Compound No. 209. The choice of under -
layment will depend on the severity of the
voids to be filled.
Abrasive blast or high - pressure water
blast concrete to remove laitance and to
obtain a uniform surface texture exposing
fine aggregate resembling coarse sand-
paper.
Regardless of preparation method used,
all surfaces must be free of any loose
deposits or contamination.
Metal - Abrasive blast or mechanically
abrade the metal surface to a nominal 2.5
mil profile employing a SSPC -SP 8
Commercial finish. All protrusions
should be ground smooth to eliminate
sharp edges.
APPLICATION
Mixing
Packaging consists a
tlzed containers of H;
Resin Part B. Comi
tents of Hardener Pa;
9. Using a slow sF
motor affixed with a
mix 3 - 5 minutes unt
ed. Thorough mixing
very Important,
Mix only complete t
which has begun to sr
ed. Do not add any a
component or mixed n
prameasured, uni-
rdener Part A and
letely empty con-
; A into Resin Part
sed 1/2 inch drill
"Jiffy" type blade,
thoroughly blend -
,ef t is material is
:Itches. Material
r, must be discard -
tulterants to either
aterlal.
Installation
Manhole ChimneySe nl is self - priming
and applied at veri. 'us thicknesses
depending upon ape ;,ification design
parameters, Manhole ChimneySeal is
easily applied by glow d hand (neoprene
or rubber). The most I Tactical method of
applying the product x (thin small diame-
ter structures is to wit a the material on
with a gloved hand or t owel.
SETTING /CURIN Ili
Curing of the Chimne !Seal lining is by
chemical reaction. While Manhole
ChimneySeal has an E :proximate work-
ing time of 45 minutes initial set occurs
In about one hour at 70 °F. Manhole
ChimneySeal cures to 1 semi -soft, elas-
tomerlc state. Protect t le installation site
from water or chemical I prior to cure for
48 hours.
INAPR. 20. 2006 12:19P INFRATECH 7634286489
TESTING
January 2004
For specific applications, a holiday detec-
tor can be utilized to ensure a continuous,
pinhole -thee lining, Pinhole testing should
occur after 24 hours at 700F using a
Tinker & Rasor Holiday Detector or simi-
lar model. Voltage will be dependent on
coating thickness. Consult a Sauerelsen
representative for details.
COVERAGE
Following Is typical coverage of No. F -88:
1- Gaijon Unit
12.8 ft2 at 1/8 -inch (125 mils) thick
Actual coverage may vary depending on
jobsite conditions and surface Irregular -
ties.
CLEAN -UP
All equipment should be cleaned with a
general orange solvent or mineral spirits
within one (1) hour after use and after
each day's use. If removal is required
after cure, consult Sauereisen for recom-
mendations.
PACKAGING
Ilon lnit
Hardener Part A-.65 Ibs In a pint container
Resin Part B - 6.9 Ibs in a 2 -gal, pail
SHELF LIFE
Sauereisen Manhole Chlmneyseal has a
shelf life of one (1) year when stored in
unopened, tightly sealed containers in a
dry location at 70°F. If there is a doubt
as to the quality of the materials, consult
a Sauereisen representative.
NO. 906 P. 3
CAUTION
Consult Material Safell Data Sheets and
container label Cautic n Statements for
hazards in handling the ie materials.
WARRANTY
We warrant that our goc ds will conform to
the description contaii led In the order,
and that we have gooc title to all goods
sold. WE GIVE NI ) WARRANTY,
WHETHER OF MER( HANTABILITY,
FITNESS FOR PURPC SE OR OTHER.
WISE, EXPRESS OR h IIPLIED, OTHER
THAN AS EXPRESS' Y SET FORTH
HEREIN. We are glad to offer sugges-
tions or to refer you to customers using
Sauerelsen cements an 1 compounds for
a similar application. Users shall deter-
mine the suitability of the product for
intended application be Fore using, and
users assume all risk ant liability whatso-
ever in connection therev Ith regardless of
any suggestions as to aF plication or con-
struction. In no event sl all we be liable
hereunder or otherwise or incidental or
consequential damages. Our liability and
your exclusive remedy hi 'reunder or oth-
erwise, in law or in et uity, shall be
expressly limited to our 'solacement of
non - conforming goods a• our factory or,
at our sole option, to re aayment of the
purchase price of non -con brming goods.
o Distributors and agent In major
cities throughout the v orld. Consult
manufacturer for Iocat ,ins.
o Information concemInl government
safety regulations avai able upon
request.
o Sauereisen also prods as Inorganic
compounds for asseml Iing, sealing,
electrically insulating a id grouting.
SIiEREISEt1 ..since 1899
180 Gamma Drive
Pittsburgh, PA 15298 -2989 USA
Phone 412.963.0303 Fax 12.963.7620
www.sauereisen.com
2002 0 Saucrsismn Pdnlad in U.SA.