Loading...
HomeMy WebLinkAbout1983-026 Council ResolutionRESOLUTION - #83 -26 WHEREAS, pursuant to an advertisement for bids for the improvement of Baldwin Lake Mobile Home Court, bids were received, opened and tablulated according to law, Channel AND WHEREAS, it appears that Constructionof Isle, MN is the lowest responsible bidder. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into the attached contract with Channel Const. of Isle, MN in the name of the City of Lino Lakes for the improvement of Baldwin Lake Mobile Home Court according to the Plans and Specifications therefor approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that_the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the City Council this 8th day of August ,1983. ATTEST: 4 .00 41-. AS - Edna L. Sarner, City Clerk WKDA TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS ARCHITECTS PLANNERS August 8, 1983 Honorable Mayor and City Council Lino Lakes, Minnesota Re: Results of Bid Opening Baldwin Lake Mobile Homes Sanitary Sewer Improvements Lino Lakes, Minnesota Commission No. 7864 Dear Mayor and Council Members: 2500 AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101 612/292 -4400 The purpose of this letter is to report the results of the bid opening for the Baldwin Lake Mobile Homes Sanitary Sewer Improvements held at 10 :30 AM on August 5, 1983 at the City Hall. A tabulation of the bids is attached for your information. Summary of Bid Results The following is a listing of the bids received: 1. Channel Construction 2. Orvedahl Construction, Inc. 3. American Contracting Corp. 4. White Construction Company Engineer's Estimate $46, 193.50 $73, 595. 75 $78, 952.40 $82, 492. 00 $39,158.75 Comparison with Developer's Construction Plans and Specifications dated August 5, 1982. TKDA presented a Sanitary Sewer Report, Baldwin Lake Mobile Park, dated December 13, 1982, in which it was recommended that a portion of this proposed sewer be deepened to serve additional areas in the future. Honorable Mayor and City Council Lino Lakes, Minnesota • August 8, 1983 Page Two There were some significant additional quantities in the final project which were not included in the initial proposal prepared for the developer. These items were additional service pipe and drop sections for future service connections, two manholes with some additional manhole and pipe depth, and an increase in the amount of bituminous surface removal and replacement. Following is a comparison of initial cost estimates and the additional quantities included in the project, with bid prices: Project Total TKDA Additional Initial Initial Quantities Estimate + Cost (Bid Additional Project Estimate Price) Quantities Bid Price Deepen Sanitary Sewer $ 6, 325. 00 $ 1,627. 50 $ 7,952. 50 $ 9, 842. 00 Remaining Construction Cost $24,046.00 $ 9,342.00 $33,388.00 $36,351.50 Total $30,371.00 $10,969. 50 $41,340.50 $46,193.50 Contract Completion The contractor has stated a completion date of October 15, 1983 for the project. Recommendation of Award of Contract Based on the bids received and references of the contractor's work, it is recom- mended that the City Council award the contract to Channel Construction in the amount of $46, 193. 50. JLD :j Sincerely yours, TOLTZ, KING, DUVA LL, ANDERSON AND ASSOCLA TES, _NCORPORA TED . Davidson, P. E. CHANGES FROM DEVELOPER PLAN DATED AUGUST 5, 1982 • Baldwin Lake Mobile Home Park Sanitary Sewer Improvements Lino Lakes, Minnesota Commission No. 7864 BASED ON BID PRICES: Additional Project Costs: Developer Plan TKDA Plan Services Bituminous Surfacing 4 - 4" x 8" Wye Items 9, 10, 11, 12, 13, @ $65.00 = $260.00 18, 20 = $4,945.00 4" PVC, 45 LF @ $15. 00 = $675.00 $935. 00 15 SY Item 23 $3,139. 50 410 @ $6.50 = $ 97.50 2 Extra MH's & 2' Extra MH Depth Item 14 & 15 $2, 290. 00 Total $1, 032. 50 $10,374. 50 NET ADDITIONAL COST $9, 342. 00 Deepening Costs Increase Depth Zone 10'-12' to 18' -20' 21' PVC @ $6. 50 = 8' DIP @ $9.00 = 10' -12' to 20' -22' 235' PVC @ $9. 50 35' DIP @ $14.00 10' -12' to 22'-24' 101' PVC @ $11.00 40' Excess MH Depth @ $120. 00 8" Outside Drop Connection Total Deepening Cost $ 136.50 $ 72.00 $2, 232. 50 $ 490.00 $1,111.00 $4, 800.00 $1,000.00 $9, 842.00 Additional Deepening Costs Increase Depth Zone 10'-12' to 2 0' -22' 45' PVC @ $9. 50 10 LF Ex MH Depth @ $120. 00 Additional Deepening Cost • $ 427. 50 $1,200.00 $1,627. 50 tabulation of bidi • TOLT2,KING,DUVALL, ANDERSON 8 ASSOCIATES, INC. ST. PAUL, MINNESOTA ENGINEERS ARCHITECTS BIOS RECENE S _ RECORDED BY S LA? PROJECT LOCATION OWNER COMM.NO. Baldwin Lake Mobile Home Sanitary Sewer Lino Lakes. Minnesota City of Lino Lakes. Minnesota 7864 SHEELOF ? SNEETS' ITEM NO. DESCRIPTION QUANTITY En_ineer's Estimate GflANNEL T5LE - ; ,rry ox v6.YAwo4/.C- .e, 4A�.,GCq/Y €30Yf. -- _� , , � Wf//7'4.' G G27✓f7. �, UNIT TOTAL UNIT TOTAL TOTAL TOTAL ® TOTAL UNIT TOTAL DATE OF COMPLETION eia s / » .,-- CERTIFIED CHECK BID BOND S S7.; .5-%; Sanitary Sewer Construction 1 8" PVC SDR 35 SS 0 -8' Depth 221 LF 14.00 3,094.00 - - - - 5� r ,p b7 ,� 2 8" PVC SDR 35 SS 8 -10' Depth 110 LF 1 5. 00 1,650.00 f.¢; -r 4_546),- - • z,,4z. - .0 /3. - !AP -- // .- 3 8" PVC SDR 35 SS 10 -12' Depth 162 LF 16. 00 2, 592.00 ,- .�,,015,*.o Zg4e - 2Zm 3SG¢.- 4 5 8" PVC SDR 35 SS 18 -20' De • th 8" PVC SDR 35 SS 20 -22' De •th 21 LF 235 LF 22.00 24. 00 462.00 5, 640.00... ZZ .$D . s ;i � . .. ,� r - M 6 8" PVC SDR 35 SS 22 -24 'Depth 101 LF 26.00 2,626.00 7 8" DIP IP Cl. 50 SS 18 -20' Death 8 LF 23.00 184.00 1 -- 8 8" DIP Cl. 50 SS 20 -22' Depth 35 LF 25.00 875.00 - J. Z�h c'. 6.25a Z,LZZ. - 712iin Z,�i'SO.- 9 6" PVC SDR 35 SS Service Pipe 95 LF 10.00 950.00 - ,,���- ��j - .- 10 4" PVC SDR SS Service Pi • e 40 LF 8.00 320. 00 OD�D� , �..� .` r /1!!i�/l�L1 - - s�iC�►�� -JII• 12 4" Vertical Service Cleanout 2 Ea pout 1 Ea 60.00 70.00 120.00 70.00 _o ,00 M Mi - .,,M /��-�,,�� Wi 13 6" PVC SDR 35 Vertical Service Cl e 14 Const. Std.4' Diameter MH 0 -8' 4 Ea 900.00 3,600. 00 lig i- 1,// - 6i- - -/ 1 5 Const. Std. 4" Dia. MH over Ex. SS 3 Ea 1000. 00 3, 000. 00 ,; if:), ii -/ t29 - ,: i- 16 Extra De . th of 4' Dia. MH 50.4 LF 60. 00 3, 024. 00. MrlAti! -fM i . / 17 Conn. to & Rest. Exist. MWCC LS Wet Well 1 Ea 400. 00 400.00 fA ,� *�� i,. . Lo. M �1 or fir 1 �. - - �- 18 Connect. to Existing Septic Tank 1 Ea 200.00 200.00 19 8" DIP Cl. 50 SS Drop Section 10.0 LF 75.00 750.00 ��� � _✓�' - 70, - 20 6" DIP Cl. 50 SS Dro. Section 34.0 LF 70. 00 2,380. 00 „ -. p ^ Mi �� ro i 21 Rem. & Repl. Fencing 1 LS 1000.00 1,000.00 .5- ■560, mom 4SGIOi 4550, 4s " Z,y4o,- z."q/�/ 22 Crushed Rock Foundation 150 LF 4.00 600.00 D ^ "- /,/ ` - /��-, " - O - 23 remove Le •1 :it urface 483 SY 5.00 2 415. 00f�►JEf✓.T:SL'11EII ��- /7/i�'L] 24 Class 5 Gravel MnDOT 3138 128 Ton 6.00 768. 00IIMI .yi ii/►' /. -,. 25 Soddin• MnDOT 3878 30 SY 2.00 IMMIIIIIECIIIMOIMMISIIIMINIMEIMIIIIMI 26 Roadside Seeding, MnDOT 2575 0. 55 Ac 200.00 110.00 M�� �� , i �, 'K�W /i r 27 Seed Mixture o 5 n P• 3876 2 0' 1 1 t t tt1 %S/ viii MEII 28 Commercial Fertilizer 10 -10 -10 275 Lbs 0.25 68.7' i•Z`% 343.7 e', Dill 9a7 Z, S J • tobulotion of bidi • TOLTZ,KING,DUVALL, ANDERSON a ASSOCIATES,INC. ST. PAUL, MINNESOTA ENGINEERS ARCHITECTS BIDS RECEIVED RECORDED BY PROJECT LOCATION OWNER COMM NO. Baldwin Lake Mobile Home Sanitary Sewer Lino Lakes, Minnesota City of Lino Lakes, Minnesota 7864 SHEET? OF ? SHEETS, ITEM NO. DESCRIPTION QUANTITY Engineer's Estimate C.- C. Goiy3r orVVZ7 VV. C.4%3•y4T_ ,I��U�s� _ oi- .e. ‘vs"'/r� C-g,94"7-. , UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL DATE OF COMPLETION - CERTIFIED CHECK BID BOND 29 Mulch Material, Type 1 1.1 Ton 200.00 220.00 250 — 7 -75' — -- 2 ' 3zz,' 112,2' Z Z7. 30 Borrow 295 CY 6.00 1 770.00 .� �- ' � 7 OGS o�soil Total - Sanitary Sewer Construction 39,158. 75 ¢/l /j3 SQ 5..1_,75' 701r54 O Q l/zf 474:- 1