Loading...
HomeMy WebLinkAbout1985-011 Council ResolutionRESOLUTION NO. 85 - 11 A RESOLUTION DESIGNATING THE FUNDING OF BRIDGE NO. L -8158 WHEREAS, the City of Lino Lakes has applied to the Commissioner of Transportation for a grant from the Minnesota State Trans- portation Fund for the reconstruction of City Bridge No. L -8158 over Hardwood Creek, and; WHEREAS, WHEREAS, the application for the grant has been reviewed by the Metropolitan Regional Development Commission, and; the amount of the grant has been determined to be $100,000, by reason of the lowest responsible bid. NOW, THEREFORE, BE IT RESOLVED: That the City of Lino Lakes does hereby affirm that any cost of the bridge in excess of the grant will be appropriated from funds available to the City of Lino Lakes, and that any grant monies appropriated for the bridge but not required, based on the final estimate, shall be returned to the Minnesota State Transportation Fund. Passed by the Lino Lakes City Council the twenty fourth day of June, 1985. ATTEST:, Marilyn G. Anderson, Clerk - Treasurer ) 1PKDA TOLTZ, KING, DUVALL, ANDERSON AND ASSOCIATES, INCORPORATED ENGINEERS ARCHITECTS PLANNERS • • June 13, 1985 Honorable Mayor and City Council Lino Lakes, Minnesota Re: City Bridge No. L -8158 over Hardwood Creek Lino Lakes, Minnesota Commission No. 7777 -84 Gentlemen: 2500 AMERICAN NATIONAL BANK BUILDING SAINT PAUL, MINNESOTA 55101 612/292 -4400 Enclosed you will find a resolution for City Bridge No. L -8158 over Hardwood Creek. Once this resolution is passed, we can apply for funding. Sincerely yours, John L. Davidson, P. E. JLD:J • • • BE541.lJI14N WHEREAS, the City of Lino Lakes has appl ied to the Commissioner of Transportation for a grant from the Minnesota State Transportation Fund for the reconstruction of City Bridge No. L -8158 over Hardwood Creek, and; WHEREAS, the appl !cation for the grant has been reviewed by the Metropolitan Regional Development Commission, and; WHEREAS, the amount of the grant has been determined to be $100,000, by reason of the I owest responsible bid. NOW, THEREFORE, BE IT RESOLVED: That the City of Lino Lakes does hereby affirm that any cost of the bridge in excess of the grant will be appropriated from funds available to the City of Lino Lakes, and that any grant monies appropriated for the bridge but not required, based on the final estimate, shall be returned to the Minnesota State Transportation Fund. .EEflf1 M1ON STATE OF MINNESOTA COUNTY OF ANOKA CITY OF LINO LAKES I do hereby certify that the foregoing resolution is a true and correct copy of a resolution presented to and adopted by the City of Lino Lakes at a duly authorized meeting thereof held on the day of , 19___. Seal Signature OFFICE OF STATE AID Application for Bridge Funds • NEW BRIDGE NUMBER PROJECT N0. OLD BRIDGE NUMBER L8158 OVER Hardwood Creek COUNTY OF Anoka ROAD NO. MUNICIPALITY OF Lino Lakes STREET NO. 80th Street • TOWNSHIP OF ROAD NO. FEDERAL SYSTEM FAS EAU NONE STATE SYSTEM CSAH MSAS 110 CMSAS Estimated Cost Structure (Include Slope Protection) Approaches Removal Items Guard Rail Engineering Estimated Letting Date Nov. 1985 Amount of Request • 100,000 iller;4041-d' 4/Z Engineer John L. Davidson, P.E. Total NONE $ 100,000 5,000 15,000 $ 120,000 5 -13 -85 Date RDC OR MET COUNCIL REVIEW REQUESTED STATEWIDE PRIORITY NUMBER of COUNTY PRIORITY NUMBER of RECEIVED BRIDGE APPLICANTS BRIDGES STATUS OF FUNDS PROPOSED FUNDING OF PROJECT TOWN BRIDGE $ $ STATE AID $ $ F A S $ $ F A U $ $ OFF SYSTEM $ $ LOCAL $ AMOUNT OF GRANT $ TOTAL $ DATE • • • EROEDSED_INEBDYELENI BEELACEEENI DE EXLSIING BBIDGE_ND, L -$1513 DN_BQIti IBEELIMSS 11Q1 _0YF.B_liMDJe(GDD DBEEE LING LhEEE, ANLELL4DUII Y,. LiNNESDIB BaRly_fQ.echn1Qal l mmandum_I`IQ.. -2- SS1. 3.1 The replacement of the deficient structure w i l l be the first step in the establishment of an east -west arterial County roadway. The roadway called 80th Street (MSAS 110) provides a needed 1 ink between north -south roadways within the City. 3.2 The 1980 official traffic count for the roadway is 205 vehicles per day with a projected ADT of approximately 328 for the year 2005. 3.3 It is not economically feasible to widen the bridge or renovate the existing deck when comparing the cost to a new structure. It is also necessary to construct a new structure because the roadway will be raised in that area to accommodate the hydrology and roadway geometric design requirements. 3.4 The proposed roadway construction which affects the placement of the new structure is in accordance with the Lino Lakes Comprehensive Plan. An agreement has been established between Anoka County and Lino Lakes for the construction of the roadway when Lino Lakes replaces the existing bridge. 3.5 Lino Lakes would provide the funding for all non -el igible costs pertaining to the reconstruction. 3.6 Upon completion of the bridge and roadway, Anoka County w i l l be responsible for the proper operation and maintenance of the bridge and roadway.