Loading...
HomeMy WebLinkAbout2012-060 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 12 -60 RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS 2012 SURFACE WATER MANAGEMENT PROJECT WHEREAS, it is proposed to perform cleaning and repair activities to the City's surface water management system in accordance with the City's National Pollutant Discharge Elimination System (NPDES) permit and WHEREAS, ten days' mailed notice and two weeks' published notice of the hearing was given and the hearing was held thereon on the 13th day of February, 2012, at which time all persons desiring to be heard were given an opportunity to be heard thereon, and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. WSB & Associates is hereby declared as the engineer for this improvement. The engineer shall prepare plans and specifications for the 2012 Surface Water Management Project for the amount of $15,000. Adopted by the Council of the City of Lino Lakes this 9th day of July2012. The motion for the adoption of the foregoing resolution was introduced by Council Member Rafferty and was duly seconded by Council Member stopsz and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Stoesz, Roeser, O'Donnell, Reine The following voted against same: none ATTEST: Bartell, u e , City 1 lerk Jeff Re', e , Mayor Whereupon said resolution was declared duly passed and adopted. 2 • STAFF ORIGINATOR: MEETING DATE: TOPIC: VOTE REQUIRED: INTRODUCTION CITY COUNCIL AGENDA ITEM 6C Michael Grochala July 9, 2012 Consider Resolution No. 12 -60, Authorizing Preparation of Plans & Specifications, 2012 Surface Water Management Project Simple Majority Staff is requesting council action to authorize preparation of plans and specification for the 2012 Surface Water Management Project. WSB, city engineer, has submitted a proposal for the not to exceed amount of $15,000 to prepare the plans, provide contract administration and construction inspections. Funding for the engineering and the maintenance contract is included in the 2012 Public Services — Streets budget. BACKGROUND The City operates a storm water conveyance system to manage water runoff and water quality from City streets and neighborhoods. To maintain the effectiveness of the system, cleaning and repair of pipe sections, catch basins, manholes, drainage ways and ponds must be completed. City staff conducts's annual reviews of the system components as required by the City's National Pollutant Discharge Elimination System (NPDES) permit. Project priorities are determined following completion of the inspection process and evaluation of resident issues identified during the year. RECOMMENDATION Staff is recommending approval of Resolution No. 12 -60 Authorizing Preparation of Plans and Specifications. ATTACHMENTS 1. Resolution No. 12 -60 •