Loading...
HomeMy WebLinkAbout2012-081 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 12-81 RESOLUTION ACCEPTING QUOTES AND AWARDING A STRIPING CONTRACT, 2012 SEAL COAT PROJECT WHEREAS, pursuant to a request for quotes for the seal coating of trails, quotes were received, and the following quotes were received complying with the request Contractor Century Fence Company AAA Striping Service Co. Engineer' s Estimate Amount of Quote $13,230.00 $15,845.75 $13,359.23 NOW, THEREFORE, BE IT RESOLVED by The City Council of The City of Lino Lakes, Minnesota: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with • Century Fence Company, in the name of the City of Lino Lakes for the Striping of the 2012 Seal Coat Project. Adoption by the Lino Lakes City Council this 13th day of August, 2012 The motion for the adoption of the foregoing resolution was introduced by Council Member Rafferty and was duly seconded by Council Member 0' Donnell and upon vote being taken thereon, the following voted in favor thereof: fert O'Donnell, Roeser, Reinert The following vt€d again st same: none (Absent - Stoesz) ATTEST: 7uli Bartell, Cit Clerk • • CITY COUNCIL AGENDA ITEM 6C STAFF ORIGINATOR: Jason C. Wedel, City Engineer MEETING DATE: June 25, 2012 TOPIC: Resolution No. 12 -81, Accepting Quotes and Awarding a Striping Contract, 2012 Seal Coat Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND As part of the seal coating project that was recently completed it is now necessary to replace the striping on several streets. These streets include Apollo Drive, Elm Street, and Lilac Street. The cost for striping these streets is included in this year's budget and is part of the total cost that was presented to the City Council on May 14, 2012 when the Council voted to authorize the advertisement of bids for this project. A comparison of actual costs to the original estimated costs presented to the City Council is shown below: Estimated Actual Seal Coating $253,783.63 $255,999.75 Crack Sealant $ 10,000.00 $ 7,852.19 Striping $ 13,359.23 $ 13,230.00 Engineering $ 12,800.00 $ 12,800.00 Total $289,942.86 $289,881.94 Several contractors were contacted to provide quotes for this project. The City received two quotes and the results are presented below. Copies of the each quote are attached for your information. Contractor Amount of bid Century Fence $13,230.00 AAA Striping $15,845.75 Engineer's Estimate $13,359.23 RECOMMENDATION • Staff recommends adoption of Resolution 12 -81 Accepting Quotes and Awarding a Striping Contract for the 2012 Seal Coat Project. City of Lino Lakes, MN 2012 Striping Project Request for Quotes Striping to be performed 10-14 days after final sealeoat sweeping. Sweeping anticipated to be completed August 24, 2012. • Item No. Item Description Unit Estimated Quanity Unit Price Total Price 1 2582.501 PAVEMENT MESSAGE (LEFT ARROW) EPDXY EACH 6 ? 2 2582.501 PAVEMENT MESSAGE RIGHT ARROW) EPDXY EACH EACH 6 4 2015 lin -0° P al- , op a o 7 . Ck . #047 * 3 2582,501 PAVEMENT MESSAGE (STOP AHEAD) EPDXY 4 2582.502 4" SOLID LINE WHITE - EPDXY LIN FT 5 2582.502 4" SOLID LINE YELLOW - EPDXY LIN FT 6200 6 2582.502 4" BROKEN LINE WHITE - EPDXY LIN FT 610 , PPI,Oto 500 .- 7 2582.502 12" SOLID LINE WHITE - EPDXY LIN FT 80 4 . #1 8 2582.502 CROSSWALK MARKING-WHITE EPDXY SQ FT 1700 TotalCost 3, 50 , 00 OttiTURY FENCE COMPANY SINCE 1917 THE NIARK UP PERMANENCE TIM Mt:CHESNEY MINNESOTA HIGHWAY tVIANAGFI PAVEMENT MAFIKIF,JG 0IVI8ION PAT PDX P77 OFFICE (851 I 4E14-7370 FOMEST LAKE, MN 500P5 TOIL FREE (9001 neS-9559 www,oenturyf6nce,orirri FAX 6361) 1B1 O77 tyllochtptruaryebertturyferte.com CELL t7 501.5100 CAUserAtmcchesney\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\CY7AN3RN \Striping Quote.xls • 8/1/2012 11:38 AM FROM: AAA 763 -428 -8557 TO: 651 -982 -2499 PAGE: 001 OF 001 u0 l.... E. efa swan j* AAA Striping Service Co. ■ 12220 43rd St NE, St Michael MN 55376 August 1, 2012 To Jason Wedel: We are quoting the following project Project Epoxy Striping Location Lino Lakes (763) 428 -4322 Fax (763) 428 -8557 Item Description Qty U/M Unit Amount 1 Pavt Mess (Left arrow) - Epoxy 6 EA $130.00 $780.00 2 Pavt Mess (Right arrow) - Epoxy 6 EA $130.00 $780.00 3 Pavt Mess (Stop Ahead) - Epoxy 4 EA $375.00 $1,500.00 4 4" Solid Line White - Epoxy 2,015 LF $0.55 $1,108.25 5 4" Solid Line Yellow - Epoxy 6,200 LF $0.56 $3,472.00 6 4" Broken Line White - Epoxy 610 LF $0.55 $335.50 7 12" Solid Line White - Epoxy 80 LF $7.00 $560.00 8 Crosswalk Marking - Epoxy 1,700 SF $4.30 $7,310.00 r Total $15,845.75 Prices do NOT include incidental markings or removal. Prices based on 1 mobilization, additional mob. charge $1,200.00 Prices based on 50 degree air & pavement temperatures at the time of marking application. Prices firm for 30 days. Tax and bond included in quote Sincerely, Dean E Erickson Estimator •