HomeMy WebLinkAbout2013-005 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 13 -05 • APPROVING PAYMENT REQUEST NO. 3F (FINAL) AND COMPENSATING CHANGE ORDER NO. 2, OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT WHEREAS, pursuant to the resolution of the Council adopted May 23, 2012, awarding the contract for the Otter Lake Service Road Culvert Replacement to Arnt Construction, Inc.; WHEREAS, a complete breakdown is detailed in Payment No. 3F (Final) and Compensating Change Order No. 2; NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that Payment Request No. 3F (Final) and Compensating Change Order No. 2 is approved for a final contract amount of $102,300.24. Adopted by the City Council of Lino Lakes, Minnesota this 28th day of January, 2013. The motion for the adoption of the foregoing resolution was introduced by Council Member O'Donnell and was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: O'Donnell, Rafferty, Roeser, Stoesz, Reinert The following voted against same: none ATTEST: Julie : artell, City erk • • • • • STAFF ORIGINATOR: MEETING DATE: TOPIC: VOTE REQUIRED: BACKGROUND CITY COUNCIL AGENDA ITEM 6B Jason C. Wedel, City Engineer January 28, 2013 Consider Resolution No. 13 -05 Approving Pay Request 3F (Final) and Compensating Change Order No. 2, Otter Lake Service Road Culvert Replacement 3/5 On May 23, 2011, the City Council approved awarding a contract to Arnt Construction for the replacement of a failed culvert beneath the Otter Lake Service Road for an original contract amount of $98,254.00. On April 9, 2012, the City Council approved Change Order No. 1 in the amount of $5,450 to replace the existing guard rails that were deteriorated and could not be reused. The contractor is requesting City approval of Payment Request 3F (Final) in the amount of $5,118.81. A copy of the Final Payment is attached. The contractor has satisfactorily completed all work and has provided all necessary documentation. Also included with the request for Final Payment is Compensating Change Order No. 2 in the amount of ($1,407.76). A copy of both this change order is attached. With this change order, the final project amount is $102,300.24. Compensating Change Order No. 2 is a deduction to the contract due to the construction quantities coming in below the engineer's estimate. The original contract amount was $98,254.00 and the revised contract, as proposed with the change order, is $102,300.24 which equates to an increase of $4,046.24. Approval of the Final Payment will begin the two year warranty period. RECOMMENDATION Approve Resolution 13 -05, Approving Payment Request No. 3F (Final) and Compensating Change Order No. 2, Otter Lake Service Road Culvert Replacement. ATTACHMENTS 1. Resolution 13 -05 2. Pay Request No. 3 & Final 3. Change Order No. 2 • • CHANGE ORDER TKDA Engineers- Architects - Planners Compensating Saint Paul, MN January 2 20 13 Proj. No. 14817.003 Change Order No. 2 To Arnt Construction, Inc. for Otter Lake Service Road Culvert Replacement for City of Lino Lakes, Minnesota You are hereby directed to make the following change to your contract dated May 17 , 20 11 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (thsr -ease) (decrease) (net - change) the contract sum by One Thousand Four Hundred Seven Dollars and 76/100 ($ 1,407.76 ). This change order shows the actual quantities installed at the unit price bid amounts (see attached itemeization): NET CHANGE = (1,407.76) Amount of Original Contract $ 98,254.00 Additions approved to date (Nos. 1) $ 5,454.00 Deductions approved to date (Nos. ) Contract amount to date $ 103,708.00 Amount ofthis Change Order (Add) (Deduct)T) $ (1,407.76) Revised Contract Amount $ 102 ,300.24 Approved C -' City of Lino Lakes, Minnesota Approved By TKDA By White - Owner Pink - Contractor Blue - TKDA COMPENSATING CHANGE ORDER NO. 2 PERIOD ENDING: January 2, 2013 OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14817.003 ITEM NO. DESCRIPTION GENERAL 1 MOBILIZATION 2 TRAFFIC CONTROL 3 TOPSOIL BORROW WITH SEED 4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 5 SILT FIENCE CONTRACT QUANTITY UNIT UNIT QUANTITY TO DATE PRICE AMOUNT NET TO DATE CHANGE 1.0 1.0 $ 1,500.00 $ 1,500.00 $ 1.0 1.0 $ 300.00 $ 300.00 $ 100.0 - $ 0.50 $ - $ 400.0 560.0 $ 6.00 $ 3,360.00 $ 100.0 - $ 3.00 $ - $ - $ $ (50.00) $ 960.00 $ (300.00) $ CONTRACT AMOUNT 1,500.00 300.00 50.00 2,400.00 300.00 SUBTOTAL - GENERAL SURFACE WATER MANAGEMENT 1 REMOVE EXISTING 96" CS PIPE 2 DEWATERING / DIVERSION (SEE DETAIL B) 3 TRENCH STABILIZATION -1 1/2" CRISHED OR WASHED ROCK (SEE DETAIL A) 4 INSTALL 96" RCP 5 INSTALL 96" FES 6 RIP RAP CLASS III 7 GEOOTEXTILE FABRIC SUBTOTAL - SURFACE WATER MANAGEMENT STREET 1 REMOVE BITUMINOUS 2 SAW CUT BITUMINOUS 3 REMOVE GUARD RAIL 4 INSTALL GUARD RAIL 5 GRANULAR BORROW 6 5" CLASS 5 AGGREGATE BASE 7 BITUMINOUS BASE COURSE 2380 (LVNW 35038) 8 BITUMINOUS MATERIAL FOR TACK COAT 9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 92.0 1.0 190.0 64.0 2.0 50.0 1,000.0 92.0 $ 1.0 $ 194.0 $ 64.0 $ 2.0 $ 46.0 $ 1,000.0 $ 180.0 180.0 $ 48.0 48.0 $ 150.0 150.0 $ 150.0 75.0 $ 135.0 188.0 $ 70.0 133.1 $ 50.0 $ 15.0 15.0 $ 20.0 36.3 $ $ 5,160.00 $ 610.00 $ 4,550.00 20.00 $ 5,900.00 $ 62.00 $ 598.00 $ 10,200.00 $ 80.00 $ 0.20 $ 1.00 $ 4.00 $ 3.00 $ 6.00 $ 16.00 $ 12.00 $ 92.00 $ 10.00 $ 92.00 $ 1,840.00 $ 5,900.00 $ 12,028.00 $ 38,272,00 $ 20,400.00 $ 3,680.00 $ 200.00 $ 82,320.00 $ $ 1,840.00 $ 5,900.00 248.00 $ - $ - $ (320.00) $ - $ (72.00) $ 180.00 $ - $ 192.00 $ - $ 450.00 $ - $ 450.00 $ (450.00) $ 3,008.00 $ 848.00 $ 1,597.56 $ 757.56 $ $ (4,600.00) $ 150.00 $ - $ 3,338.68 $ 1,498.68 $ 11,780.00 38,272.00 20,400.00 4,000.00 200.00 82,392.00 180.00 192.00 450.00 900.00 2,160.00 840.00 4,600.00 150.00 1,840.00 1 TOTAL - STREET CONTRACT AMOUNT CHANGE ORDER NO. 1 1 REPLACE GUARDRAIL 2 REMOVE DETERIORATED RAILROAD POSTS TOTAL CHANGE ORDER NO. 1 1.0 $ 1.0 $ $ 9,366.24 $ (1,945.76) $ 11,312.00 $ 96,846.24 $ (1,407.76) $ 98,254.00 4,672.50 $ 781.50 $ 4,672.50 $ 781.50 $ 5,454.00 $ 4,672.50 $ 781.50 $ 5,454.00 $ 4,672.50 781.50 5,454.00 TOTAL COMPENSATING CHANGE ORDER NO. 2 $ 102,300.24 $ (1,407.76) $ 103,708.00 • • TKDA ENGINEERING • ARCEITECTURE • PLANNING The right time. The right people. The right comma 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 (651) 292-4400 (651) 292 -0083 Fax www.tkda.com Proj. No. 14817.003 Cert. No. 3F St. Paul, MN, January 2 , 2013 To City of Lino Lakes, Minnesota This Certifies that Arnt Construction, Inc. Owner , Contractor For Otter Lake Service Road Culvert Replacement Is entitled to Five Thousand One Hundred Eighteen Dollars and 81/100 ($ 5,118.81 ) FINAL being 3rd estimate for papal payment on a Quote with you dated May 17 , 2011 Rereeive ' payment in% o above/Certificate. Arnt Construction, Inc. TKDA , 20 / ._3 Q James E. Studenski, P.E. RECAPITULATION OF ACCOUNT An Employee Owned Company Promoting Affirmative Action and Equal Opportunity CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extras $ 98,254.00 All previous payments $ - $ 97,181.43 All previous credits Change Order No. 1 $ 5,454.00 Compensating Change Order No. 2 $ (1,407.76) Credit No. If n If I ft AMOUNT OF THIS CERTIFICATE $ 5,118.81 Totals $ 102,300.24 $ 102,300.24 $ - Credit Balance $ - There will remain unpaid on contract after payment of this Certificate $ - - $ 102,300.24 $ 102 300.24 $ - An Employee Owned Company Promoting Affirmative Action and Equal Opportunity TKDA Engineers- Architects- Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS Estimate No. 3F Period Ending January 2 , 20 13 Page 1 of 1 Proj. No. 14817.003 Contractor Amt Construction, Inc. Original Contract Amount 98,254.00 Project Otter Lake Service Road Culvert Replacement Location City of Lino Lakes, Minnesota Total Contract Work Completed $ 96, 84624 Total Approved Credits $ 0.00 Total Approved Extra Work Completed C.O. #1 $ 5,454.00 Approved Extra Orders Amount Completed $ 5,454.00 Total Amount Earned This Estimate $ 102,30024 Less Approved Credits $ Less 0 % Retained $ 0.00 Less Previous Payments $ 97,181.43 Total Deductions $ Amount Due This Estimate 97,181.43 5,118.81 Contractor f t- --�''f \ ` Date 1 7 - Engineer Date ` ,2 — James E. Studenski, P.E. • • ESTIMATE NO. 3F PERIOD ENDING: January 2, 2013 OTTER LAKE SERVICE ROAD CULVERT REPLACEMENT CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 14817.003 0ITEM CONTRACT QUANTITY UNIT AMOUNT NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE GENERAL 1 MOBILIZATION 1.0 1.0 $ 1,500.00 $ 1,500.00 2 TRAFFIC CONTROL 1.0 1.0 $ 300.00 $ 300.00 3 TOPSOIL BORROW WITH SEED 100.0 - $ 0.50 $ 4 EROSION CONTROL BLANKET CATEGORY 3 WITH SEED 400.0 560.0 $ 6.00 $ 3,360.00 5 SILT FIENCE 100.0 - $ 3.00 $ - • SUBTOTAL - GENERAL $ 5,160.00 SURFACE WATER MANAGEMENT 1 REMOVE EXISTING 96" CS PIPE 2 DEWATERING / DIVERSION (SEE DETAIL B) 3 TRENCH STABILIZATION -1 1/2" CRISHED OR WASHED ROCK (SEE DETAIL A) 4 INSTALL 96" RCP 5 INSTALL 96" FES 6 RIP RAP CLASS III 7 GEOOTEXTILE FABRIC SUBTOTAL - SURFACE WATER MANAGEMENT 92.0 92.0 $ 20.00 $ 1,840.00 1.0 1.0 $ 5,900.00 $ 5,900.00 190.0 194.0 $ 62.00 $ 12,028.00 64.0 64.0 $ 598.00 $ 38,272.00 2.0 2.0 $ 10,200.00 $ 20,400.00 50.0 46.0 $ 80.00 $ 3,680.00 1,000.0 1,000.0 $ 0.20 $ 200.00 - $ 82,320.00 STREET 1 REMOVE BITUMINOUS 180.0 180.0 $ 1.00 $ 180.00 2 SAW CUT BITUMINOUS 48.0 48.0 $ 4.00 $ 192.00 3 REMOVE GUARD RAIL 150.0 150.0 $ 3.00 $ 450.00 4 INSTALL GUARD RAIL 150.0 75.0 $ 6.00 $ 450.00 5 GRANULAR BORROW 135.0 188.0 $ 16.00 $ 3,008.00 6 5" CLASS 5 AGGREGATE BASE 70.0 133.1 $ 12.00 $ 1,597.56 7 BITUMINOUS BASE COURSE 2380 (LVNW 35038) 50.0 $ 92.00 $ - 8 BITUMINOUS MATERIAL FOR TACK COAT 15.0 15.0 $ 10.00 $ 150.00 9 BITUMINOUS WEARING COURSE 2360 (LVWE 45030) 20.0 36.3 $ 92.00 $ 3,338.68 1 TOTAL - STREET - $ 9,366.24 CONTRACT AMOUNT $ 96,846.24 CHANGE ORDER NO. 1 1 REPLACE GUARDRAIL 2 REMOVE DETERIORATED RAILROAD POSTS TOTAL CHANGE ORDER NO. 1 1.0 $ 4,672.50 $ 4,672.50 1.0 $ 781.50 $ 781.50 $ 5,454.00 TOTAL ESTIMATE NO. 3F $ 102,300.24 •