HomeMy WebLinkAbout2013-021 Council Resolution•
CITY OF LINO LAKES
RESOLUTION NO. 13 -21
RESOLUTION APPROVING JOINT POWERS AGREEMENT
WITH COUNTY OF ANOKA
I -35W PEDESTRIAN AND BICYCLE BRIDGE
WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to
construct a Pedestrian and Bicycle Bridge along County State Aid Highway 14 (Main Street)
from Woodland Drive to Rondeau Lake Drive; and,
WHEREAS, said parties mutually agree that County State Aid Highway 14 from Woodland
Drive to Rondeau Lake Drive is in need of a pedestrian and bicycle bridge; and,
WHEREAS, the County has prepared preliminary design plans for the construction of a
pedestrian and bicycle bridge along County State Aid Highway 14 from Woodland Drive to
Rondeau Lake Drive in accordance with Anoka County and the Minnesota Department of
Transportation standards to a staff approved layout condition; and,
WHEREAS, Anoka County has jurisdiction over County State Aid Highway 14 from Woodland
Drive to Rondeau Lake Drive and,
WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint
powers agreements for the joint exercise of powers common to each.
NOW, THEREFORE BE IT RESOLVED by the City Council of The City of Lino Lakes,
Minnesota:
1. that the City Council hereby approves the Joint Powers Agreement with the County of
Anoka for construction of a Pedestrian and Bicycle Bridge along County State Aid
Highway 14 at I -35W and authorizes the Mayor and City Clerk to execute the JPA on
behalf of the City.
Adopted by the Council of the City of Lino Lakes this I 1 `day of , 2013.
The motion for the adoption of the foregoing resolution was introduced by Council Member
Roeser and was duly seconded by Council Member Stoesz
and upon vote being taken thereon, the following voted in favor thereof:
Roeser, Stoesz, Rafferty, O'Donnell, Reinert
The following voted against same:
none
ATTEST:
ul . nne Bartell, C.
•
•
CITY COUNCIL
• •
AGENDA ITEM 6B
STAFF ORIGINATOR: Michael Grochala
MEETING DATE: February 11, 2013
•
•
TOPIC: Consider Resolution No. 13 -21 Approving Joint Powers
Agreement with Anoka County, I -35W Pedestrian and
Bicycle Bridge
VOTE REQUIRED:
INTRODUCTION
3/5
Staff is requesting City Council approval of a Joint Powers Agreement with Anoka County for
the construction of the I -35W Pedestrian and Bicycle Bridge.
BACKGROUND
Anoka County in cooperation with Lino Lakes is preparing to advertise for bids for the
construction of a pedestrian and bicycle bridge along County State Aid Highway 14 (Main
Street) at Interstate 35W. The project will include the extension of trail from Woodland Drive to
Rondeau Lake Drive.
Construction of the project will begin in summer of 2013 and be completed by fall. The Joint
Powers Agreement (JPA) sets forth the responsibilities of the city and county as well as the cost
sharing for the project. The total estimated construction cost of the project (excluding
engineering and right -of -way acquisition) is $1,095,384.50. Approximately $264,000 in Federal
funds are available for the project. Anoka County will be funding the balance of the project cost.
The City has no financial share in the project.
The City will be responsible for the maintenance of the trail including, sweeping, clearing,
plowing, and trash removal as well as long term maintenance such as overlays, crack sealing and
replacement. The maintenance of the bridge structure will be the responsibility of Anoka
County.
RECOMMENDATION
Staff is recommending approval of the JPA with Anoka County.
ATTACHMENTS
1. Resolution No.13 -21
2. Joint Powers Agreement
•
•
•
•
Anoka County Contract No. 2012 -0577
JOINT POWERS AGREEMENT
FOR THE CONSTRUCTION OF A PEDESTRIAN AND BICYCLE BRIDGE ALONG
COUNTY STATE AID HIGHWAY 14 (MAIN STREET) FROM WOODLAND DRIVE TO
RONDEAU LAKE DRIVE
IN THE CITY OF LINO LAKES, MN
(SP 002 - 614 -035)
THIS AGREEMENT is made and entered into this : day of , 2013 by and
between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue,
Anoka, Minnesota 55303, hereinafter referred to as "County ", and the City of Lino Lakes, 600 Town
Center Pkwy, Lino Lakes, MN 55014, hereinafter referred to as "City ".
WITNES SETH
WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to
construct a Pedestrian and Bicycle Bridge along County State Aid Highway 14 (Main Street) from
Woodland Drive to Rondeau Lake Drive and,
WHEREAS, said parties mutually agree that County State Aid Highway 14 from Woodland
Drive to Rondeau Lake Drive is in need of a pedestrian and bicycle bridge; and,
WHEREAS, the County has prepared preliminary design plans for the construction of a
pedestrian and bicycle bridge along County State Aid Highway 14 from Woodland Drive to Rondeau
Lake Drive in accordance with Anoka County and the Minnesota Department of Transportation
standards to a staff approved layout condition; and,
WHEREAS, Anoka County has jurisdiction over County State Aid Highway 14 from Woodland
Drive to Rondeau Lake Drive and,
WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint
powers agreements for the joint exercise of powers common to each.
NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED:
I. PURPOSE
The parties have joined together for the purpose of constructing a pedestrian and bicycle trail
along County State Aid Highway 14 from Woodland Drive to Rondeau Lake as described in the
preliminary design plans. The project number for the reconstruction is SP 002 - 614 -035. Said
engineering plans are filed in the office of the Anoka County Highway Department and incorporated
herein by reference.
The parties to this Joint Powers Agreement (JPA) agree in principle that construction of County State
Aid Project No. 002 - 614 -035 along CSAH 14 from Woodland Drive to Rondeau Lake Drive is in the
best interest of the traveling public and that the Preliminary Layout as shown in Exhibit "A" defines the
preliminary design of the Project.
1
It is agreed that the Exhibit "A" Layout dated January 25, 2013 has been reviewed and accepted by the
parties and is suitable for preparation of final construction documents. Any significant changes made
hereafter to the design as presented in the Exhibit "A" Layout will require approval by the parties as an
amendment to this JPA. These same changes will require a change in the cost share to include any
additional design engineering costs that may occur.
II. METHOD
The County shall cause the construction of Anoka County Project SP 002 - 614 -035, in
conformance with proposed engineering plans and specifications.
IMPROVEMENTS
It is agreed by the parties that in 2013 a pedestrian and bicycle trail along CSAH 14 will be constructed.
Improvements include but are not limited to: a pedestrian and bicycle bridge and bituminous trail. The
costs of these improvements have been estimated for this agreement and will be finalized after bids have
been received. These costs will be paid by the County.
RIGHT OF WAY:
No right -of -way is required for this project. Any City owned property or easements required for the
construction will be conveyed to the County at no cost.
BITUMINOUS TRAIL:
The parties agree that the construction of the bituminous trail leading up to the pedestrian and bicycle
bridge is eligible for federal funds and that the County will be responsible for the local match.
The parties understand that the cost for the trail includes: bituminous surfacing, aggregate base,
excavation (including muck excavation), borrow material (granular and topsoil), and turf establishment.
The parties agree that the County will pay for the design of the trail, and any removal items, required to
construct the trail.
PERMITS:
The parties agree that the County will secure all necessary permits for this Project. The City agrees to
coordinate with the County in securing the permits required by the Rice Creek Watershed District, city
permits, MnDOT permits as well as any other permits that may be required.
III. COSTS
The contract costs of the work, or if the work is not contracted, the cost of all labor, materials,
normal engineering costs and equipment rental required to complete the work, shall constitute the actual
"construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections of
the costs, which will be incurred for this project. Actual costs will vary and those will be the costs for
which the relevant parties will be responsible.
2
•
•
•
•
•
•
The estimated construction cost of the total project is $1,095,384.50. Federal funds available for
the Project are capped at $263,813.
The total estimated construction cost to the City is $0.
IV. TERM
This Agreement shall continue until terminated as provided hereinafter.
V. DISBURSEMENT OF FUNDS
All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each
entity pursuant to the method provided by law.
VI. CONTRACTS AND PURCHASES
All contracts let and purchases made pursuant to this Agreement shall be made by the County in
conformance to the State laws.
VII. STRICT ACCOUNTABILITY
A strict accounting shall be made of all funds and report of all receipts and shall be made upon
request by either party.
VIII. TERMINATION
This Agreement may be terminated by either party at any time, with or without cause, upon not
less than thirty (30) days written notice delivered by mail or in person to the other party. If notice is
delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not
be effective with respect to any solicitation of bids or any purchases of services or goods which occurred
prior to such notice of termination.
IX. MAINTENANCE
A. Maintenance of the bituminous trails shall be the responsibility of the City. The City shall be
responsible for general routine maintenance, such as, sweeping, clearing, plowing, trash
removal and other incidental items and shall be responsible for long -term maintenance, such as
bituminous overlays, crack sealing and replacement.
B. Maintenance of the trail over the bridge shall be the responsibility of the City. The City shall be
responsible for general routine maintenance, such as sweeping, clearing, plowing, trash
removal and other incidental items. The County shall be responsible for the long -term
maintenance of the bridge deck and structure.
X. NOTICE
For purposes of delivery of any notices herein, the notice shall be effective if delivered to the
County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the
County, and to the City Administrator of City of Lino Lakes, 600 Town Center Pkwy, Lino Lakes, MN
55014, on behalf of the City.
3
XI. INDEMNIFICATION
The City and County mutually agree to indemnify and hold harmless each other from any claims,
losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents,
or employees relating to activities conducted by either party under this Agreement.
4
•
•
•
•
•
•
XII. ENTIRE AGREEMENT REQUIREMENT OF WRITING
It is understood and agreed that the entire agreement of the parties is contained herein and that
this Agreement supersedes all oral agreements and all negotiations between the parties relating to the
subject matter thereof, as well as any previous agreement presently in effect between the parties to the
subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement
shall be valid only when they have been reduced to writing and duly signed by the parties.
IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on the
dates written below.
COUNTY OF ANOKA CITY OF LINO LAKES
By: By:
Rhonda Sivarajah, Chair
Board of Commissioners
Dated: Dated:
Jeff Reinert
Mayor
ATTEST
By: By:
Jerry Soma Jeff Karlson
County Administrator City Administrator
Dated: Dated:
RECOMMENDED FOR APPROVAL
By: By:
Douglas W. Fischer, P.E. Michael Grochala
County Engineer Community Development Director
Dated: Dated:
APPROVED AS TO FORM
By:
Dan Klint
Assistant County Attorney
Dated:
5