Loading...
HomeMy WebLinkAbout2013-022 Council Resolution• • CITY OF LINO LAKES RESOLUTION NO. 13 -22 RESOLUTION REQUESTING FUNDING TO INVESTIGATE THE FEASIBILITY OF A COLLABORATION VENTURE WHEREAS, the cities of Centerville, Circle Pines, Columbus, Hugo, Lino Lakes, and Lexington have collaborated to save money and improve efficiencies in a variety of areas where all or some of the cities participate. These areas include building inspection, road salt management, equipment purchases and sharing, fuel purchasing, police services, and fire services; and WHEREAS, the six cities see a potential opportunity to collaborate in the operation and maintenance of sanitary sewer systems and water supply and distribution systems ( "Utility Systems "); and WHEREAS, the age and condition of the Utility Systems within the cities vary; and WHEREAS, some of the six cities have considerable room to grow, which will require significant investment to expand the Utility Systems while other cities are fully developed and may need earlier replacement as the Utility Systems age; and WHEREAS, the six cities have a duplication of staff and equipment to operate and maintain the Utility Systems and a joint entity may provide cost savings and efficiency; and WHEREAS, the City Council recognizes the complexity and uncertainty of this collaboration with no assurance that Lino Lakes would benefit from it; and WHEREAS, engineering studies and a financial analysis are needed to determine if this collaboration effort would be advantageous. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes that the Council supports the concept of shared Utility Systems if it benefits the City. BE IT FURTHER RESOLVED THAT: 1. The Council recognizes the potential benefit of joint operation of its Utility Systems; 2. Staff is authorized to submit applications on the City's behalf to secure grant funding for a detailed feasibility analysis of the cooperative utility concept. 3. This resolution does not commit the City to move forward with any cooperative agreements, but is intended to begin a process for determining the benefits and disadvantages of joint Utility Systems in order for the City Council to make a well informed decision after the feasibility analysis is completed. Adopted by the City Council of the City of Lino Lakes this 25th day of February 2013. • • • The motion for the adoption of the foregoing resolution was introduced by Council Member o' DoNNET.Tand was duly seconded by Council Member ROESER , and upon a vote being taken thereon, the following voted in favor thereof: O'DONNELL, ROESER, RAFFERTY, STOESZ, REINERT The following voted against same: NONE ATTEST: uia Bartell, City i lerk • s • CITY COUNCIL AGENDA ITEM 3A STAFF ORIGINATOR: Jeff Karlson MEETING DATE: February 25, 2013 TOPIC: Regional Utility System Feasibility Study VOTE REQUIRED: 3/5 INTRODUCTION The Council is being asked to approve a resolution supporting the concept of a shared water and sewer system with the cities of Centerville, Circle Pines, Columbus, Hugo, and Lexington. BACKGROUND About a year ago, the six administrators began discussing the feasibility of combining utility operations to reduce costs. Hugo's city engineer, Jay Kennedy, prepared a report and concluded that there were no technical barriers to consider. We have been in communication with State Representative Linda Runbeck about procuring a grant from the Public Facilities Authority to study the feasibility of establishing a joint sewer and water system. A legislative bill (attached) has been drafted and Representative Runbeck is waiting for each city to support this measure before introducing the bill. The other five city councils have already voted to support the funding request. Each participating city would contribute an equal amount for the cost of the study. We would like to limit the total contribution to ten percent of the cost of the study up to $75,000, which would be $1,250 for each city. RECOMMENDATION Consider approving Resolution No. 13 -22, requesting funding to investigate the feasibility of collaboration venture. ATTACHMENTS Resolution No. 13 -22 Draft of Legislative Bill • • • 01/28/13 03:05 PM HOUSE RESEARCH JV DD032 1.1 A bill for an act 1.2 relating to local government; appropriating money for a grant to the city of 1.3 Centerville to study the feasibility of a regional sewer and water system. 1.4 BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF MINNESOTA: 1.5 Section 1. CENTERVILLE; REGIONAL SEWER AND WATER SYSTEM 1.6 FEASIBILITY STUDY. 1.7 (a) $ is appropriated from the general fund to the Public Facilities Authority in 1.8 fiscal year 2014, and available until June 30, 2015, for a grant to the city of Centerville to 1.9 study the feasibility of establishing a regional sewer and water system. The appropriation 1.10 is not available until the authority determines that a joint powers agreement between 1.11 Centerville and at least four of the following five cities has been executed: Circle Pines, 1.12 Columbus, Hugo, Lino Lakes, and Lexington. The joint powers agreement must include, 1.13 at a minimum: 1.14 (1) that each participating city has committed to contributing $ [OR ... percent 1.15 of the required local match equal to the participating city's percentage of the region's 1.16 population] to the cost of the feasibility study; and 1.17 (2) how the study will be conducted, who will be responsible for oversight of the 1.18 study. 1.19 (b) The feasibility study must evaluate: 1.20 (1) the costs, benefits, sustainability, and potential for growth in the existing separate 1.21 water and sewer systems, including environmental costs and benefits; 1.22 (2) the costs, benefits, advantages, and disadvantages of operating a regional water 1.23 supply system, a regional sanitary sewer system, or both; Section 1. 1 • 01/28/13 03:05 PM HOUSE RESEARCH JV DD032 2.1 (3) the infrastructure needed to be improved, added, or replaced to establish a 2.2 regional system, the estimated capital costs, and potential financing sources; 2.3 (4) the estimated operating costs of a regional system and the fee structure needed to 2.4 pay for the regional system's operations, maintenance, and periodic capital improvements; 2.5 (5) the impact of the current separate systems versus a regional system on aquifer 2.6 management and the sustainability of water supply for the cities; and 2.7 (6) any other information determined by the joint powers entity to be necessary 2.8 or useful. 2.9 The joint powers entity must consult with state and regional agencies with expertise in 2.10 water and wastewater infrastructure funding and construction for advice on what should 2.11 be included in the feasibility study. 2.12 (c) Centerville or the joint powers entity shall report to the chair and ranking 2.13 minority members of the legislative committees with jurisdiction over water and 2.14 wastewater treatment infrastructure and funding on the results of the feasibility study and 2.15 any recommendations for evaluating and implementing a regional water and wastewater 2.16 system in other areas of the state. The report must be submitted by January 15 of the year 2.17 following completion of the feasibility study. Section 1. 2