HomeMy WebLinkAbout2013-028 Council Resolution• • • CITY OF LINO LAKES RESOLUTION NO. 13-28 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT, OTTER LAKE ROAD IMPROVEMENT PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of the Otter Lake Road Improvement Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Arnt Construction Company, Inc. Burschville Construction, Inc. Omann Brothers, Inc. Kuechle Underground Frattalone Companies, Inc. Douglas-Kerr Underground, LLC T.A. Schifsky & Sons, Inc. Forest Lake Contracting, Inc. Dresel Contracting, Inc. Northwest Asphalt, Inc. Midwest Civil Constructors, LLC Engineer's Estimate Amount of bid $326,366.20 $340,906.20 $369,791.89 $375,560.65 $378,650.40 $385,339.08 $386,947.15 $396,652.75 $398,836.50 $403,894.87 $429,902.75 $411,057.00 WHEREAS, it appears that Arnt Construction Company, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Arnt Construct Company Inc., in the name of the City of Lino Lakes for the construction of the Otter Lake Road Improvement Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid Bonds made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. Adopted by the Council of the City of Lino Lakes this 11th day of March, 2013. The motion for the adoption of the foregoing resolution was introduced by Council Member O'Donnell and was duly seconded by Council Member Roeser and upon vote being taken thereon, the following voted in favor thereof: O'Donnell, Roeser, Rafferty, Stoesz, Reinert The following voted against same: none ATTEST: • Jeff Rein - rt, Mayor • • STAFF ORIGINATOR: C. C. MEETING DATE: TOPIC: CITY COUNCIL AGENDA ITEM 6B Michael Grochala March 11, 2006 i. Consider Resolution No. 13 -26 Approving Final Plat, Forest View Acres 2 "d Addition ii. Consider Resolution No. 13 -27, Approving Development Agreement, Forest View Acres 2" Addition VOTE REQUIRED: 3/5 INTRODUCTION Staff is requesting City Council consideration of the Final Plat and Development Agreement for Forest View Acres 2" Addition. REVIEW DEADLINE: Application Deemed Complete - January 18, 2013 60 - Day Review Deadline - March 19, 2013 BACKGROUND The City Council approved the preliminary plat for Forest View Acres 2 "d Addition, formerly known as Rademacher Addition, on December 10, 2012 with Resolution No. 12 -129. Forest View Acres 2 "d Addition is a 2 -lot commercial subdivision on the NE corner of Lake Drive and Main Street. The final plat is consistent with the approved preliminary plat. The City Attorney has reviewed the title commitment. The City Engineer has prepared the development agreement. All other conditions of preliminary plat approval have been addressed or are otherwise provided for in the development agreement. The Development Agreement provides for the submittal of fees and securities to cover City review costs and ensure completion of the public and private improvements in accordance with the approved plans. The agreement also requires the submittal of the following documents: 1. A Declaration for Maintenance of Storm Water Facilities must be executed for the storm water treatment facilities located on the site in the form of Exhibit A, attached hereto. 2. A Quit Claim Deed in favor of the City must be prepared and recorded for the • trail easement along Lake Drive. • 3. A Reciprocal Access, Operation and Maintenance Agreement between the two newly created lots must be recorded concurrently with the plat. The Developer shall provide to the City, for its approval, a copy of the agreement. Such agreement shall at a minimum provide for; 1) ingress and egress across properties; 2) a proof of parking provision; 3) maintenance of private improvements (i.e., sanitary sewer, water main, snow removal, landscaping); 4) Provisions for maintaining surface water management features including infiltration areas in accordance with RCWD and City requirements. 4. The Rice Creek Watershed District must review and issue a permit for the project prior to building permits being issued by the city for any new construction. 5. The Anoka County Highway Department must review and issue a permit for the work within the County right -of -way prior to any construction. 6. Proof of Parking — A declaration requiring the owner to install additional parking stalls upon finding of the City that such stalls are necessary to accommodate the use must be recorded against the property. RECOMMENDATION Staff is recommending approval of the Final Plat of Forest View Acres 2nd Addition (Resolution • No. 13 -26) with the following condition: 1. The developer shall submit an executed development agreement and all documents, fees and securities required therein prior to release of the signed Final Plat. Staff is recommending approval of the Development Agreement (Resolution No. 13 -27). ATTACHMENTS 1. Resolution No. 13 -26 2. Forest View Acres 2nd Addition Final Plat 3. Resolution No. 13 -27 4. Development Agreement • NORTH 0 40 80 SCALE IN FEET O DENOTES 1/2 INCH BY 14 INCH IRON MONUMENT SET AND MARKED BY LICENSE NO. 47481. ® DENOTES ANOKA COUNTY MONUMENT • DENOTES IRON MONUMENT FOUND AND MARKED AS SHOWN. ® DENOTES ANOKA COUNTY RIGHT OF WAY MONUMENT —A— DENOTES RIGHT O5 ACCESS DEDICATED TO ANOKA COUNTY THE EAST LINE OF THE PLAT OF FOREST VIEW ACRES I5 ASSUMED TO HAVE A BEARING OF SOUTH 00 DEGREES 00 MINUTES 25 SECONDS WEST. • W 1/4 COR.. SEC. 4, l TWP. 31, RG . 22 (A RED AND WHITE r S0. STEEL TELSPAR MONUMENT) FOREST VIEW ACRES SECOND ADDITION 44. O y3 / /,'"g N. UNE, LOT 5, ` 1./4'-'''. FOREST VIEW ACRES `‘ S89•59'35.E 282.41 [ . , ,,f 3538 -Pm. 1 ''/-7;9:6',-' Y -I _/ y r F OPEN IP - ,,pp6 ' 1 // / �` /- , ' /1 / '\ r. / j O / I / „9 / /��/ /gr y =4/S4r J /ry4f /� •� b tl -_ _/ ____ 57.97 ,' 58410'08T 1/ i .5055675'W 1 ■ • \ / l 18279 �� R• r *zg �>• DRAINAGE 9 UIUTY F.A.SEYENT LOT 1 1 19472 I, 101;97 " I • /. §g % h / 'S- ,/ 4'M10k f' t� 1/ SW COR., SEC. 4, / r . 31, RGE. 22 (CAST IRON MONUMENT) / 1T•. P 4488 i• f e et q e aS L -26.20 —c: 6-T55 5r FW.IP / / b r Imo: \\ \1 V\ g� v 4 EAST 406.51 DRAINAGE: um1111Y EASEMENT-. 7 l - ` FW.P • PINCH TOP O L LOT 2 27554 LOT 29 11 cc U • 5 0, z i 1 9104 P ~ , - - - - -- 1 10171 A,89.59'3514 LOT EASB1ENT FOR POTTER 519 PDIRPOSES PER Doc NO MAIN STREET Ao71M'lE` : -- IIa i'C.S.A.H. NO. 14j'` `Z _y — DRANALL d WI/1Y EASEMENT___' 15055 , 4 — — + N89•59'36'W 391.89 „ 149 /29 A10 PER PARRA( RELEASE DOG NO 544244 �. . S. UNE, SEC. 4, TWP. 31, RGE. 22 N8959:15'W 64191 -- 9235 h ATA A aN ss y 29 T - - -r —� 8 _''- - L35J3i A A A J7 A --Y , 17 FW.P $ (: • N. UNE, ANOKA CO. I N89°59'35'W 367.98 I 9235_ HWY. R/W PLAT NO. 17 _ -- -- 10.00-4f-' `245 (EXCEPTION) - - • • •• •• ^ -•- •• • N00°00'25Ey J N89°59'35'11 S. UNE, FOREST VIEW ACRES -- $ i HAIN STREET IC.S.A., ,. NO. 141 CITY OF LINO LAKES COUNTY OF ANOKA SEC. 4, T. 31, R. 22 KNOW ALL PERSONS BY THESE PRESENTS: That Rademacher Family Limited Partnership, a Minnesota Limited Partnership, owner of the following described property: All of Lots 5, 6 and 7, FOREST VIEW ACRES AND All those parts of the vacated service road, and Lot 1, FOREST VIEW ACRES, lying South of the North line of Lot 5 extended Westerly to the highway right of way, EXCEPT THEREFROM the following parcels: Parcels 60 and 61, ANOKA COUNTY HIGHWAY RIGHT -OFWAY PLAT NO. 17, according to the map or plat thereof on file and of record in the Office of the Anoka County Recorder. Parcel 51, ANOKA COUNTY HIGHWAY RIGHT -OFWAY PLAT NO. 25, according to the map or plat thereof on file and of record in the Office of the Anoka County Recorder. The Northwesterly 30 feet of Lot 1, FOREST VIEW ACRES, lying South of the Westerly extension of the North line of Lot 5, FOREST VIEW ACRES. Has caused the same to be surveyed and platted as FOREST VIEW ACRES SECOND ADDITION and does hereby dedicate to the public for public us the public way and drainage and utility easements as shown on this plat. Also dedicating to the County of Anoka the right of access onto County State Aid Highway No. 14 and County State Aid Highway No. 23 as shown on this plat. In witness whereof said Rademacher Family Limited Partnership, a Minnesota Limited Partnership, Owner, has caused these presents to be signed this —day of , 20 . SIGNED: , its STATE OF MINNESOTA COUNTY OF This instrument was acknowledged before me this —day of Notary Public, County, Minnesota My Commission Expires SURVEYOR'S CERTIFICATE , 20 by , its I Marcus F. Hampton do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this day of , 20 . Marcus F. Hampton, Licensed Land Surveyor, Minnesota License No. 47481 STATE OF MINNESOTA COUNTY OF This instrument was acknowledged before me this Notary Public, County, Minnesota My Commission Expires CITY COUNCIL UNO LAKES, MINNESOTA day of , 20 , by Marcus F. Hampton, a Licensed Land Surveyor. This plat of FOREST VIEW ACRES SECOND ADDITION was approved and accepted by the City Council of the City of Lino Lakes, Minnesota at a regular meeting thereof held this day of , 20 , and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd.2. City Council, Lino Lakes, Minnesota By ANOKA COUNTY SURVEYOR , Mayor By: , Clerk I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this day of ,20 . By Larry D. Hoium, Anoka County Surveyor MFRA, INC. ENGINEERING, PLANNING AND LAND SURVEYING CITY COUNCIL AGENDA ITEM 6C STAFF ORIGINATOR: Jason C. Wedel, City Engineer MEETING DATE: June 11, 2012 TOPIC: Resolution No. 13 -28, Accepting bids and Awarding a Construction Contract, Otter Lake Road Extension Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND Sealed bids were received and publicly opened at 10:00 a.m. on February 27, 2013. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Arnt Construction Company, Inc. Burschville Construction, Inc. Omann Brothers, Inc. Kuechle Underground Frattalone Companies, Inc. Douglas -Kerr Underground, LLC T.A. Schifsky & Sons, Inc. Forest Lake Contracting, Inc. Dresel Contracting, Inc. Northwest Asphalt, Inc. Midwest Civil Constructors, LLC Engineer's Estimate Amount of bid $326,366.20 $340,906.20 $369,791.89 $375,560.65 $378,650.40 $385,339.08 $386,947.15 $396,652.75 $398,836.50 $403,894.87 $429,902.75 $411,057.00 The low bids are competitive bids for this project. A copy of the complete bid tabulation is attached as well as a letter of recommendation. The final completion date for this project is July 31, 2013. RECOMMENDATION Staff recommends adoption of Resolution 13 -28 Accepting Bids and Awarding a Construction Contract for the Otter Lake Road Extension Project. ATTACHMENTS 1. Bid Tabulation 2. Letter of Recommendation • WSB & Assoc, Gr Project Name: LINO - Otter Lake Road Extension Client: City of Lino Lakes Bid Opening: 2/27 /2013 10:00 AM Contract No.: Project No.: 02029 -19 Owner: Minneapolis • WSB Project Bid Abstract Denotes Corrected Figure 2/27/2013 Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Arnt Construction Company Burschville Construction, Inc. Omann Brothers, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price SCHEDULE A - SURFACE IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $19,300.00 $19,300.00 $5,400.00 $5,400.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 2 2101.502 CLEARING TREE 25 $150.00 $3,750.00 $1.00 $25.00 $0.01 $0.25 $10.22 $255.50 3 2101.507 GRUBBING TREE 25 $200.00 $5,000.00 $1.00 $25.00 $0.01 $0.25 $10.22 $255.50 4 2102.501 PAVEMENT MARKING REMOVAL SQ FT 560 $3.00 $1,680.00 $2.06 $1,153.60 $1.60 $896.00 $1.84 $1,030.40 5 2102.502 PAVEMENT MARKING REMOVAL LIN FT 750 $2.00 $1,500.00 $0.52 $390.00 $0.80 $600.00 $0.61 $457.50 6 2104.501 REMOVE CURB AND GUTTER LIN FT 50 $4.00 $200.00 $2.00 $100.00 $2.20 $110.00 $13.66 $683.00 7 2104.503 REMOVE CONCRETE WALK SQ FT 200 $1.00 $200.00 $1.00 $200.00 $1.10 $220.00 $2.66 $532.00 8 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 160 $2.00 $320.00 $2.00 $320.00 $2.20 $352.00 $9.02 $1,443.20 9 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 $26.00 $26.00 $16.00 $16.00 $25.55 $25.55 10 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 10 $5.00 $50.00 $5.00 $50.00 $10.00 $100.00 $13.39 $133.90 11 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 155 $3.00 $465.00 $5.00 $775.00 $5.50 $852.50 $2.98 $461.90 12 2104.523 SALVAGE TEMPORARY BARRICADES EACH 11 $200.00 $2,200.00 $50.00 $550.00 $42.00 $462.00 $76.65 $843.15 13 2104.523 SALVAGE SIGN EACH 2 $75.00 $150.00 $26.00 $52.00 $16.00 $32.00 $25.55 $51.10 14 2105.507 SUBGRADE EXCAVATION (EV) CU YD 250 $13.00 $3,250.00 $5.90 $1,475.00 $6.90 $1,725.00 $8.37 $2,092.50 15 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1720 $15.00 $25,800.00 $13.00 $22,360.00 $14.00 $24,080.00 $18.46 $31,751.20 16 2105.525 TOPSOIL BORROW (CV) CU YD 100 $10.00 $1,000.00 $1.00 $100.00 $2.00 $200.00 $24.24 $2,424.00 17 2106.607 EXCAVATION - COMMON (P) CU YD 3225 $10.00 $32,250.00 $5.90 $19,027.50 $6.90 $22,252.50 $6.06 $19,543.50 18 2112.501 SUBGRADE PREPARATION ROAD STA 3.7 $210.00 $777.00 $100.00 $370.00 $340.00 $1,258.00 $275.50 $1,019.35 19 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $100.00 $500.00 $125.00 $625.00 $110.00 $550.00 $125.00 $625.00 20 2130.501 WATER M GALLONS 10 $30.00 $300.00 $30.00 $300.00 $32.00 $320.00 $50.00 $500.00 21 2211.501 AGGREGATE BASE CLASS 5 TON 2020 $12.00 $24,240.00 $11.70 $23,634.00 $12.25 $24,745.00 $13.66 $27,593.20 22 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 140 $5.00 $700.00 $3.14 $439.60 $3.50 $490.00 $2.75 $385.00 23 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 820 $65.00 $53,300.00 $71.00 $58,220.00 $70.82 $58,072.40 $79.40 $65,108.00 24 2521.501 6" CONCRETE WALK SQ FT 450 $6.00 $2,700.00 $4.20 $1,890.00 $5.00 $2,250.00 $4.09 $1,840.50 • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Arnt Construction Company Burschville Construction, Inc. Omann Brothers, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 25 2521.511 2.5" BITUMINOUS WALK SQ FT 2200 $2.25 $4,950.00 $1.74 $3,828.00 $2.00 $4,400.00 $2.82 $6,204.00 26 2531.501 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 360 $15.00 $5,400.00 $17.26 $6,213.60 $17.50 $6,300.00 $17.12 $6,163.20 27 2531.602 PEDESTRIAN CURB RAMP EACH 2 $300.00 $600.00 $420.00 $840.00 $450.00 $900.00 $408.80 $817.60 28 2531.618 TRUNCATED DOMES SQ FT 100 $40.00 $4,000.00 $36.00 $3,600.00 $36.75 $3,675.00 $35.77 $3,577.00 29 2535.501 BITUMINOUS CURB LIN FT 365 $9.00 $3,285.00 $5.80 $2,117.00 $6.00 $2,190.00 $3.00 $1,095.00 30 2545.523 4" NON - METALLIC CONDUIT LIN FT 400 $5.00 $2,000.00 $3.00 $1,200.00 $5.00 $2,000.00 $3.07 $1,228.00 31 2554.602 TEMPORARY BARRICADES EACH 9 $500.00 $4,500.00 $150.00 $1,350.00 $105.00 $945.00 $153.30 $1,379.70 32 2563.601 TRAFFIC CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $2,000.00 $2,000.00 $1,788.50 $1,788.50 33 2564.531 SIGN PANELS TYPE C SQ FT 27 $35.00 $945.00 $36.00 $972.00 $32.60 $880.20 $35.77 $965.79 34 2565.616 REVISE SIGNAL SYSTEM SYSTEM 1 $40,000.00 $40,000.00 $30,170.00 $30,170.00 $31,000.00 $31,000.00 $32,193.00 $32,193.00 35 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1000 $3.50 $3,500.00 $1.60 $1,600.00 $1.60 $1,600.00 $1.79 $1,790.00 36 2573.530 STORM DRAIN INLET PROTECTION EACH 7 $350.00 $2,450.00 $10.00 $70.00 $100.00 $700.00 $125.00 $875.00 37 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $2,500.00 $2,500.00 $100.00 $100.00 $750.00 $750.00 $400.00 $400.00 38 2575.501 SEEDING ACRE 1.25 $10,000.00 $12,500.00 $900.00 $1,125.00 $920.00 $1,150.00 $178.85 $223.56 39 2575.502 SEED MIXTURE 260 POUND 70 $5.00 $350.00 $2.62 $183.40 $2.70 $189.00 $2.04 $142.80 40 2575.502 SEED MIXTURE 310 POUND 20 $8.00 $160.00 $17.20 $344.00 $17.60 $352.00 $20.44 $408.80 41 2575.505 SODDING TYPE SALT RESISTANT SQ YD 240 $3.00 $720.00 $4.90 $1,176.00 $5.00 $1,200.00 $3.07 $736.80 42 2575.511 MULCH MATERIAL TYPE 1 TON 2 $250.00 $500.00 $550.00 $1,100.00 $550.00 $1,100.00 $357.70 $715.40 43 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 1000 $3.00 $3,000.00 $1.40 $1,400.00 $1.40 $1,400.00 $0.92 $920.00 44 2575.532 FERTILIZER TYPE 2 POUND 200 $1.00 $200.00 $1.28y $1.30 $260.00 $0.51 $102.00 45 2582.501 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM EACH 2 $250.00 $500.00 $256.00 $512.00 $270.00 $540.00 $408.80 $817.60 46 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM EACH 4 $250.00 $1,000.00 $256.00 $1,024.00 $270.00 $1,080.00 $408.80 $1,635.20 47 2582.501 PAVEMENT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM EACH 3 $275.00 $825.00 $512.00 $1,536.00 $540.00 $1,620.00 $664.30 $1,992.90 48 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT 1000 $1.00 $1,000.00 $0.96 $960.00 $1.00 $1,000.00 $0.26 $260.00 49 2582.502 12" SOLID LINE WHITE -EPDXY LIN FT 50 $6.00 $300.00 $8.06 $403.00 $8.50 $425.00 $6.13 $306.50 50 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 240 $2.00 $480.00 $1.90 $456.00 $2.00 $480.00 $0.53 $127.20 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $217,720.10 $245,920.50 SCHEDULE B - SANITARY SEWER IMPROVEMENTS 51 2451.609 AGGREGATE FOUNDATION TON 50 $10.00 $500.00 $26.00 $1,300.00 $0.01 $0.50 $26.57 $1,328.50 52 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 $2,500.00 $11,250.00 $11,250.00 $3,000.00 $3,000.00 $7,256.20 $7,256.20 53 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 390 $38.00 $14,820.00 $42.00 $16,380.00 $60.00 $23,400.00 $42.92 $16,738.80 54 2503.603 TELEVISE SANITARY SEWER LIN FT 390 $2.00 $780.00 $2.50 $975.00 $1.50 $585.00 $2.56 $998.40 55 2506.516 CASTING ASSEMBLY (MANHOLE) EACH 2 $500.00 $1,000.00 $325.00 $650.00 $750.00 $1,500.00 $332.15 $664.30 56 2506.602 CHIMNEY SEAL EACH 2 $200.00 $400.00 $145.00 $290.00 $150.00 $300.00 $148.19 $296.38 57 2506.603 CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE LIN FT 43 $175.00 $7,525.00 $177.00 $7,611.00 $180.00 $7,740.00 $180.89 $7,778.27 • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Arnt Construction Company Burschville Construction, Inc. Omann Brothers, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $38,456.00 $36,525.50 $35,060.85 SCHEDULE C - WATER MAIN IMPROVEMENTS 58 2451.609 GRANULAR FOUNDATION AND /OR BEDDING TON 50 $10.00 $500.00 $8.00 $400.00 $10.00 $500.00 $8.18 $409.00 59 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 $1,000.00 $1,000.00 $2,800.00 $2,800.00 $1,000.00 $1,000.00 $1,890.70 $1,890.70 60 2504.602 HYDRANT EACH 1 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $3,450.00 $3,450.00 $3,066.00 $3,066.00 61 2504.602 16" BUTTERFLY VALVE AND BOX EACH 2 $8,500.00 $17,000.00 $3,050.00 $6,100.00 $5,100.00 $10,200.00 $3,117.10 $6,234.20 62 2504.602 6" GATE VALVE AND BOX EACH 1 $1,200.00 $1,200.00 $1,300.00 $1,300.00 $1,175.00 $1,175.00 $1,328.60 $1,328.60 63 2504.602 8" GATE VALVE AND BOX EACH 2 $2,000.00 $4,000.00 $1,700.00 $3,400.00 $1,750.00 $3,500.00 $1,737.40 $3,474.80 64 2504.603 HYDRANT EXTENSION LIN FT 1 $500.00 $500.00 $530.00 $530,00 $550.00 $550.00 $541.66 $541.66 65 2504.603 VALVE BOX EXTENSION LIN FT 1 $100.00 $100.00 $100.00 $100.00 $150.00 $150.00 $86.87 $86.87 66 2504.603 16" WATER MAIN -DUCT IRON CL 52 LIN FT 370 $75.00 $27,750.00 $70.00 $25,900.00 $65.13 $24,098.10 $70.52 $26,092.40 67 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 5 $35.00 $175.00 $34.00 $170.00 $65.00 $325.00 $33.73 $168.65 68 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 120 $40.00 $4,800.00 $37.00 $4,440.00 $38.00 $4,560.00 $36.79 $4,414.80 69 2504.604 4" POLYSTYRENE INSULATION SQ YD 25 $45.00 $1,125.00 $20.00 $500.00 $35.00 $875.00 $18.40 $460.00 70 2504.608 DUCTILE IRON FITTINGS POUND 1500 $4.00 $6,000.00 $4.50 $6,750.00 $3.50 $5,250.00 $4.60 $6,900.00 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $55,390.00 $55,633.10 $55,067.68 SCHEDULE D - STORM SEWER IMPROVEMENTS 71 2105.511 COMMON CHANNEL EXCAVATION CU YD 25 $15.00 $375.00 $5.90 $147.50 $6.90 $172.50 $10.22 $255.50 72 2105.607 POND EXCAVATION CU YD 850 $10.00 $8,500.00 $5.90 $5,015.00 $6.90 $5,865.00 $9.10 $7,735.00 73 2501.515 18" RC PIPE APRON EACH 1 $550.00 $550.00 $1,160.00 $1,160.00 $475.00 $475.00 $1,185.52 $1,185.52 74 2501.602 SKIMMER EACH 1 $4,000.00 $4,000.00 $3,550.00 $3,550.00 $2,500.00 $2,500.00 $3,628.10 $3,628.10 75 2501.602 TRASH GUARD FOR 18" PIPE APRON EACH 1 $300.00 $300.00 $250.00 $250.00 $280.00 $280.00 $255.50 $255.50 76 2502.541 4" PERF PE PIPE DRAIN LIN FT 100 $15.00 $1,500.00 $1.00 $100.00 $9.00 $900.00 $5.11 $511.00 77 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 360 $30.00 $10,800.00 $25.50 $9,180.00 $28.50 $10,260.00 $26.06 $9,381.60 78 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 40 $32.00 $1,280.00 $28.00 $1,120.00 $31.00 $1,240.00 $28.62 $1,144.80 79 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 LIN FT 8.5 $250.00 $2,125.00 $250.00 $2,125.00 $340.00 $2,890.00 $255.50 $2,171.75 80 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 3 $1,300.00 $3,900.00 $1,480.00 $4,440.00 $1,300.00 $3,900.00 $1,512.56 $4,537.68 81 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 2 $500.00 $1,000.00 $560.00 $1,120.00 $500.00 $1,000.00 $572.32 $1,144.64 82 2511.501 RANDOM RIPRAP CLASS III CU YD 16 $100.00 $1,600.00 $104.00 $1,664.00 $90.00 $1,440.00 $105.27 $1,684.32 83 2511.515 GEOTEXTILE FILTER TYPE IV SQ YD 35 $3.00 $105.00 $3.00 $3.00 $105.00 $3.07 $107.45 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $31,027.50 $33,742.86 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $217,720.10 $245,920.50 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $38,456.00 $36,525.50 $35,060.85 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $55,390.00 $55,633.10 $55,067.68 • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Arnt Construction Company Burschville Construction, Inc. Omann Brothers, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 � $31,027.50 $33,742.86 Totals for Project 02029 -19 $411,057.00 ygg $340,906.20 $369,791.89 of Estimate for Project 02029 -19 - 20.60% - 17.07% - 10.04% • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Kuechle Underground Frattalone Companies, Inc. Douglas -Kerr Underground, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price SCHEDULE A - SURFACE IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $19,300.00 $19,300.00 $12,000.00 $12,000.00 $18,750.00 $18,750.00 $28,967.50 $28,967.50 2 2101.502 CLEARING TREE 25 $150.00 $3,750.00 $10.00 $250.00 $18.00 $450.00 $10.00 $250.00 3 2101.507 GRUBBING TREE 25 $200.00 $5,000.00 $10.00 $250.00 $18.00 $450.00 $10.00 $250.00 4 2102.501 PAVEMENT MARKING REMOVAL SQ FT 560 $3.00 $1,680.00 $1.50 $840.00 $1.50 $840.00 $1.50 $840.00 5 2102.502 PAVEMENT MARKING REMOVAL LIN FT 750 $2.00 $1,500.00 $0.75 $562.50 $0.75 $562.50 $0.75 $562.50 6 2104.501 REMOVE CURB AND GUTTER LIN FT 50 $4.00 $200.00 $5.00 $250.00 $2.50 $125.00 $5.00 $250.00 7 2104.503 REMOVE CONCRETE WALK SQ FT 200 $1.00 $200.00 $2.00 $400.00 $0.50 $100.00 $2.00 $400.00 8 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 160 $2.00 $320.00 $4.00 $640.00 $3.00 $480.00 $4.00 $640.00 9 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 10 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 10 $5.00 $50.00 $4.00 $40.00 $20.00 $200.00 $4.00 $40.00 11 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 155 $3.00 $465.00 $3.00 $465.00 $5.00 $775.00 $3.00 $465.00 12 2104.523 SALVAGE TEMPORARY BARRICADES EACH 11 $200.00 $2,200.00 $40.00 $440.00 $40.00 $440.00 $40.00 $440.00 13 2104.523 SALVAGE SIGN EACH 2 $75.00 $150.00 $15.00 $30.00 $15.00 $30.00 $15.00 $30.00 14 2105.507 SUBGRADE EXCAVATION (EV) CU YD 250 $13.00 $3,250.00 $8.00 $2,000.00 $12.00 $3,000.00 $8.20 $2,050.00 15 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1720 $15.00 $25,800.00 $18.00 $30,960.00 $18.25 $31,390.00 $18.10 $31,132.00 16 2105.525 TOPSOIL BORROW (CV) CU YD 100 $10.00 $1,000.00 $22.00 $2,200.00 $17.00 $1,700.00 $22.00 $2,200.00 17 2106.607 EXCAVATION - COMMON (P) CU YD 3225 $10.00 $32,250.00 $5.50 $17,737.50 $8.05 $25,961.25 $5.50 $17,737.50 18 2112.501 SUBGRADE PREPARATION ROAD STA 3.7 $210.00 $777.00 $250.00 $925.00 $600.00 $2,220.00 $250.00 $925.00 19 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $100.00 $500.00 $125.00 $625.00 $150.00 $750.00 $150.00 $750.00 20 2130.501 WATER M GALLONS 10 $30.00 $300.00 $40.00 $400.00 $100.00 $1,000.00 $40.00 $400.00 21 2211.501 AGGREGATE BASE CLASS 5 TON 2020 $12.00 $24,240.00 $18.00 $36,360.00 $14.65 $29,593.00 $18.40 $37,168.00 22 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 140 $5.00 $700.00 $3.05 $427.00 $3.05 $427.00 $3.05 $427.00 23 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 820 $65.00 $53,300.00 $69.00 $56,580.00 $68.82 $56,432.40 $68.85 $56,457.00 24 2521.501 6" CONCRETE WALK SQ FT 450 $6.00 $2,700.00 $5.05 $2,272.50 $4.35 $1,957.50 $4.40 $1,980.00 25 2521.511 2.5" BITUMINOUS WALK SQ FT 2200 $2.25 $4,950.00 $2.38 $5,236.00 $1.68 $3,696.00 $2.45 $5,390.00 26 2531.501 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 360 $15.00 $5,400.00 $15.00 $5,400.00 $5.63 $2,026.80 $16.75 $6,030.00 27 2531.602 PEDESTRIAN CURB RAMP EACH 2 $300.00 $600.00 $430.00 $860.00 $425.00 $850.00 $475.00 $950.00 28 2531.618 TRUNCATED DOMES SQ FT 100 $40.00 $4,000.00 $40.00 $4,000.00 $40.00 $4,000.00 $35.00 $3,500.00 29 2535.501 BITUMINOUS CURB LIN FT 365 $9.00 $3,285.00 $5.63 $2,054.95 $7.71 $2,814.15 $5.65 $2,062.25 30 2545.523 4" NON - METALLIC CONDUIT LIN FT 400 $5.00 $2,000.00 $6.53 $2,612.00 $5.00 $2,000.00 $6.25 $2,500.00 31 2554.602 TEMPORARY BARRICADES EACH 9 $500.00 $4,500.00 $100.00 $900.00 $100.00 $900.00 $100.00 $900.00 32 2563.601 TRAFFIC CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $1,400.00 $1,400.00 $22,200.00 $22,200.00 $1,400.00 $1,400.00 33 2564.531 SIGN PANELS TYPE C SQ FT 27 $35.00 $945.00 $31.00 $837.00 $31.00 $837.00 $31.00 $837.00 34 2565.616 REVISE SIGNAL SYSTEM SYSTEM 1 $40,000.00 $40,000.00 $32,000.00 $32,000.00 $23,040.00 $23,040.00 $31,500.00 $31,500.00 • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Kuechle Underground Frattalone Companies, Inc. Douglas -Ke r Underground, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 35 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1000 $3.50 $3,500.00 $1.50 $1,500.00 $1.80 $1,800.00 $1.50 $1,500.00 36 2573.530 STORM DRAIN INLET PROTECTION EACH 7 $350.00 $2,450.00 $150.00 $1,050.00 $150.00 $1,050.00 $175.00 $1,225.00 37 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $2,500.00 $2,500.00 $750.00 $750.00 $2,000.00 $2,000.00 $1,500.00 $1,500.00 38 2575.501 SEEDING ACRE 1.25 $10,000.00 $12,500.00 $880.00 $1,100.00 $200.00 $250.00 $875.00 $1,093.75 39 2575.502 SEED MIXTURE 260 POUND 70 $5.00 $350.00 $2.55 $178.50 $3.75 $262.50 $2.55 $178.50 40 2575.502 SEED MIXTURE 310 POUND 20 $8.00 $160.00 $17.00 $340.00 $4.50 $90.00 $16.75 $335.00 41 2575.505 SODDING TYPE SALT RESISTANT SQ YD 240 $3.00 $720.00 $4.65 $1,116.00 $8.50 $2,040.00 $4.65 $1,116.00 42 2575.511 MULCH MATERIAL TYPE 1 TON 2 $250.00 $500.00 $530.00 $1,060.00 $1,200.00 $2,400.00 $525.00 $1,050.00 43 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 1000 $3.00 $3,000.00 $1.30 $1,300.00 $1.35 $1,350.00 $1.30 $1,300.00 44 2575.532 FERTILIZER TYPE 2 POUND 200 $1.00 $200.00 $1.25 $250.00 $1.30 $260.00 $1.25 $250.00 45 2582.501 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM EACH 2 $250.00 $500.00 $260.00 $520.00 $400.00 $800.00 $256.00 $512.00 46 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM EACH 4 $250.00 $1,000.00 $260.00 $1,040.00 $400.00 $1,600.00 $256.00 $1,024.00 47 2582.501 PAVEMENT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM EACH 3 $275.00 $825.00 $510.00 $1,530.00 $650.00 $1,950.00 $512.00 $1,536.00 48 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT 1000 $1.00 $1,000.00 $0.95 $950.00 $0.25 $250.00 $0.95 $950.00 49 2582.502 12" SOLID LINE WHITE -EPDXY LIN FT 50 $6.00 $300.00 $8.00 $400.00 $6.00 $300.00 $8.10 $405.00 50 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 240 $2.00 $480.00 $1.90 $456.00 $0.52 $124.80 $1.90 $456.00 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $235,509.95 $256,539.90 $253,877.00 SCHEDULE B - SANITARY SEWER IMPROVEMENTS 51 2451.609 AGGREGATE FOUNDATION TON 50 $10.00 $500.00 $15.00 $750.00 $42.14 $2,107.00 $31.25 $1,562.50 52 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 $2,500.00 $600.00 $600.00 $1,530.00 $1,530.00 $3,900.00 $3,900.00 53 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 390 $38.00 $14,820.00 $51.00 $19,890.00 $22.30 $8,697.00 $54.90 $21,411.00 54 2503.603 TELEVISE SANITARY SEWER LIN FT 390 $2.00 $780.00 $1.50 $585.00 $3.20 $1,248.00 $2.00 $780.00 55 2506.516 CASTING ASSEMBLY (MANHOLE) EACH 2 $500.00 $1,000.00 $700.00 $1,400.00 $480.00 $960.00 $696.40 $1,392.80 56 2506.602 CHIMNEY SEAL EACH 2 $200.00 $400.00 $140.00 $280.00 $744.00 $1,488.00 $233.90 $467.80 57 2506.603 CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE LIN FT 43 $175.00 $7,525.00 $150.00 $6,450.00 $152.20 $6,544.60 $234.35 $10,077.05 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $29,955.00 $22,574.60 $39,591.15 SCHEDULE C - WATER MAIN IMPROVEMENTS 58 2451.609 GRANULAR FOUNDATION AND /OR BEDDING TON 50 $10.00 $500.00 $13.00 $650.00 $11.05 $552.50 $11.20 $560.00 59 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 $1,000.00 $1,000.00 $1,200.00 $1,200.00 $2,310.00 $2,310.00 $1,560.00 $1,560.00 60 2504.602 HYDRANT EACH 1 $3,000.00 $3,000.00 $4,000.00 $4,000.00 $3,830.00 $3,830.00 $3,656.30 $3,656.30 61 2504.602 16" BUTTERFLY VALVE AND BOX EACH 2 $8,500.00 $17,000.00 $3,500.00 $7,000.00 $2,660.00 $5,320.00 $3,809.65 $7,619.30 62 2504.602 6" GATE VALVE AND BOX EACH 1 $1,200.00 $1,200.00 $1,400.00 $1,400.00 $1,110.00 $1,110.00 $1,292.15 $1,292.15 63 2504.602 8" GATE VALVE AND BOX EACH 2 $2,000.00 $4,000.00 $2,100.00 $4,200.00 $1,560.00 $3,120.00 $1,754.25 $3,508.50 64 2504.603 HYDRANT EXTENSION LIN FT 1 $500.00 $500.00 $730.00 $730.00 $570.00 $570.00 $593.30 $593.30 65 2504.603 VALVE BOX EXTENSION LIN FT 1 $100.00 $100.00 $200.00 $200.00 $90.00 $90.00 $92.00 $92.00 • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Kuechle Underground Frattalone Companies, Inc. Douglas -Kerr Underground, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 66 2504.603 16" WATER MAIN -DUCT IRON CL 52 LIN FT 370 $75.00 $27,750.00 $92.00 $34,040.00 $81.00 $29,970.00 $73.20 $27,084.00 67 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 5 $35.00 $175.00 $46.00 $230.00 $95.45 $477.25 $32.45 $162.25 68 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 120 $40.00 $4,800.00 $54.00 $6,480.00 $54.25 $6,510.00 $38.65 $4,638.00 69 2504.604 4" POLYSTYRENE INSULATION SQ YD 25 $45.00 $1,125.00 $21.00 $525.00 $18.25 $456.25 $30.60 $765.00 70 2504.608 DUCTILE IRON FITTINGS POUND 1500 $4.00 $6,000.00 $6.30 $9,450.00 $3.10 $4,650.00 $4.14 $6,210.00 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $70,105.00 $58,966.00 $57,740.80 SCHEDULE D - STORM SEWER IMPROVEMENTS 71 2105.511 COMMON CHANNEL EXCAVATION CU YD 25 $15.00 $375.00 $10.00 $250.00 $20.00 $500.00 $10.00 $250.00 72 2105.607 POND EXCAVATION CU YD 850 $10.00 $8,500.00 $9.00 $7,650.00 $10.80 $9,180.00 $8.90 $7,565.00 73 2501.515 18" RC PIPE APRON EACH 1 $550.00 $550.00 $550.00 $550.00 $650.00 $650.00 $732.25 $732.25 74 2501.602 SKIMMER EACH 1 $4,000.00 $4,000.00 $2,500.00 $2,500.00 $9,520.00 $9,520.00 $2,600.00 $2,600.00 75 2501.602 TRASH GUARD FOR 18" PIPE APRON EACH 1 $300.00 $300.00 $190.00 $190.00 $243.00 $243.00 $484.25 $484.25 76 2502.541 4" PERF PE PIPE DRAIN LIN FT 100 $15.00 $1,500.00 $5.50 $550.00 $6.40 $640.00 $9.90 $990.00 77 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 360 $30.00 $10,800.00 $41.00 $14,760.00 $26.70 $9,612.00 $26.05 $9,378.00 78 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 40 $32.00 $1,280.00 $46.00 $1,840.00 $29.25 $1,170.00 $28.20 $1,128.00 79 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 LIN FT 8.5 $250.00 $2,125.00 $450.00 $3,825.00 $232.00 $1,972.00 $376.95 $3,204.08 80 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 3 $1,300.00 $3,900.00 $1,900.00 $5,700.00 $1,155.00 $3,465.00 $1,654.30 $4,962.90 81 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 2 $500.00 $1,000.00 $410.00 $820.00 $809.40 $1,618.80 $476.00 $952.00 82 2511.501 RANDOM RIPRAP CLASS III CU YD 16 $100.00 $1,600.00 $79.00 $1,264.00 $122.10 $1,953.60 $103.40 $1,654.40 83 2511.515 GEOTEXTILE FILTER TYPE IV SQ YD 35 $3.00 $105.00 $2.62 $91.70 $1.30 $45.50 $6.55 $229.25 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $39,990.70 $40,569.90 $34,130.13 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $235,509.95 $256,539.90 $253,877.00 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $29,955.00 $22,574.60 $39,591.15 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $70,105.00 $58,966.00 $57,740.80 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $39,990.70 $40,569.90 $34,130.13 Totals for Project 02029 -19 $411,057.00 $375,560.65 $378,650.40 $385,339.08 % of Estimate for Project 02029 -19 -8.64% -7.88% -6.26% • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate T. A. Schifsky & Sons, Inc. Forest Lake Contracting, Inc. Dresel Contracting, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price SCHEDULE A - SURFACE IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $19,300.00 $19,300.00 $15,587.00 $15,587.00 $28,000.00 $28,000.00 $20,000.00 $20,000.00 2 2101.502 CLEARING TREE 25 $150.00 $3,750.00 $10.00 $250.00 $0.01 $0.25 $10.00 $250.00 3 2101.507 GRUBBING TREE 25 $200.00 $5,000.00 $10.00 $250.00 $0.01 $0.25 $10.00 $250.00 4 2102.501 PAVEMENT MARKING REMOVAL SQ FT 560 $3.00 $1,680.00 $1.89 $1,058.40 $1.50 $840.00 $1.65 $924.00 5 2102.502 PAVEMENT MARKING REMOVAL LIN FT 750 $2.00 $1,500.00 $0.63 $472.50 $0.75 $562.50 $0.80 $600.00 6 2104.501 REMOVE CURB AND GUTTER LIN FT 50 $4.00 $200.00 $5.25 $262.50 $5.00 $250.00 $3.00 $150.00 7 2104.503 REMOVE CONCRETE WALK SQ FT 200 $1.00 $200.00 $2.10 $420.00 $2.00 $400.00 $2.00 $400.00 8 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 160 $2.00 $320.00 $3.15 $504.00 $4.00 $640.00 $2.00 $320.00 9 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 $26.25 $26.25 $15.00 $15.00 $20.00 $20.00 10 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 10 $5.00 $50.00 $25.00 $250.00 $10.00 $100.00 $10.00 $100.00 11 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 155 $3.00 $465.00 $5.00 $775.00 $5.00 $775.00 $3.00 $465.00 12 2104.523 SALVAGE TEMPORARY BARRICADES EACH 11 $200.00 $2,200.00 $78.75 $866.25 $40.00 $440.00 $50.00 $550.00 13 2104.523 SALVAGE SIGN EACH 2 $75.00 $150.00 $26.25 $52.50 $15.00 $30.00 $20.00 $40.00 14 2105,507 SUBGRADE EXCAVATION (EV) CU YD 250 $13.00 $3,250.00 $15.75 $3,937.50 $13.00 $3,250.00 $25.00 $6,250.00 15 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1720 $15.00 $25,800.00 $12.60 $21,672.00 $13.00 $22,360.00 $14.00 $24,080.00 16 2105.525 TOPSOIL BORROW (CV) CU YD 100 $10.00 $1,000.00 $16.00 $1,600.00 $0.01 $1.00 $20.00 $2,000.00 17 2106.607 EXCAVATION - COMMON (P) CU YD 3225 $10.00 $32,250.00 $13.00 $41,925.00 $13.00 $41,925.00 $8.00 $25,800.00 18 2112.501 SUBGRADE PREPARATION ROAD STA 3.7 $210.00 $777.00 $300.00 $1,110.00 $650.00 $2,405.00 $325.00 $1,202.50 19 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $100.00 $500.00 $150.00 $750.00 $125.00 $625.00 $150.00 $750.00 20 2130.501 WATER M GALLONS 10 $30.00 $300.00 $1.00 $10.00 $40.00 $400.00 $50.00 $500.00 21 2211.501 AGGREGATE BASE CLASS 5 TON 2020 $12.00 $24,240.00 $13.00 $26,260.00 $16.00 $32,320.00 $13.50 $27,270.00 22 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 140 $5.00 $700.00 $3.00 $420.00 $3.05 $427.00 $4.00 $560.00 23 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 820 $65.00 $53,300.00 $74.00 $60,680.00 $72.00 $59,040.00 $70.00 $57,400.00 24 2521.501 6" CONCRETE WALK SQ FT 450 $6.00 $2,700.00 $6.92 $3,114.00 $6.00 $2,700.00 $4.50 $2,025.00 25 2521.511 2.5" BITUMINOUS WALK SQ FT 2200 $2.25 $4,950.00 $1.70 $3,740.00 $3.80 $8,360.00 $3.00 $6,600.00 26 2531.501 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 360 $15.00 $5,400.00 $18.08 $6,508.80 $17.00 $6,120.00 $18.00 $6,480.00 27 2531.602 PEDESTRIAN CURB RAMP EACH 2 $300.00 $600.00 $182.70 $365.40 $500.00 $1,000.00 $500.00 $1,000.00 28 2531.618 TRUNCATED DOMES SQ FT 100 $40.00 $4,000.00 $40.95 $4,095.00 $40.00 $4,000.00 $40.00 $4,000.00 29 2535.501 BITUMINOUS CURB LIN FT 365 $9.00 $3,285.00 $4.80 $1,752.00 $6.00 $2,190.00 $6.00 $2,190.00 30 2545.523 4" NON - METALLIC CONDUIT LIN FT 400 $5.00 $2,000.00 $5.25 $2,100.00 $10.00 $4,000.00 $5.00 $2,000.00 31 2554.602 TEMPORARY BARRICADES EACH 9 $500.00 $4,500.00 $157.50 $1,417.50 $100.00 $900.00 $125.00 $1,125.00 32 2563.601 TRAFFIC CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $2,000.00 $2,000.00 $1,600.00 $1,600.00 33 2564.531 SIGN PANELS TYPE C SQ FT 27 $35.00 $945.00 $36.75 $992.25 $31.00 $837.00 $35.00 $945.00 34 2565.616 REVISE SIGNAL SYSTEM SYSTEM 1 $40,000.00 $40,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $32,500.00 $32,500.00 • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate T. A. Schifsky & Sons, Inc. Forest Lake Contracting, Inc. Dresel Contracting, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 35 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1000 $3.50 $3,500.00 $2.00 $2,000.00 $1.50 $1,500.00 $1.85 $1,850.00 36 2573.530 STORM DRAIN INLET PROTECTION EACH 7 $350.00 $2,450.00 $110.00 $770.00 $125.00 $875.00 $165.00 $1,155.00 37 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $2,500.00 $2,500.00 $750.00 $750.00 $1,200.00 $1,200.00 $1,200.00 $1,200.00 38 2575.501 SEEDING ACRE 1.25 $10,000.00 $12,500.00 $1,000.00 $1,250.00 $875.00 $1,093.75 $900.00 $1,125.00 39 2575.502 SEED MIXTURE 260 POUND 70 $5.00 $350.00 $3.00 $210.00 $3.00 $210.00 $3.00 $210.00 40 2575.502 SEED MIXTURE 310 POUND 20 $8.00 $160.00 $18.00 $360.00 $17.00 $340.00 $18.00 $360.00 41 2575.505 SODDING TYPE SALT RESISTANT SQ YD 240 $3.00 $720.00 $6.00 $1,440.00 $5.00 $1,200.00 $5.00 $1,200.00 42 2575.511 MULCH MATERIAL TYPE 1 TON 2 $250.00 $500.00 $550.00 $1,100.00 $525.00 $1,050.00 $600.00 $1,200.00 43 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 1000 $3.00 $3,000.00 $1.50 $1,500.00 $1.30 $1,300.00 $2.00 $2,000.00 44 2575.532 FERTILIZER TYPE 2 POUND 200 $1.00 $200.00 $1.50 $300.00 $1.25 $250.00 $1.30 $260.00 45 2582.501 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM EACH 2 $250.00 $500.00 $420.00 $840.00 $256.00 $512.00 $300.00 $600.00 46 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM EACH 4 $250.00 $1,000.00 $420.00 $1,680.00 $256.00 $1,024.00 $300.00 $1,200.00 47 2582.501 PAVEMENT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM EACH 3 $275.00 $825.00 $682.50 $2,047.50 $512.00 $1,536.00 $650.00 $1,950.00 48 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT 1000 $1.00 $1,000.00 $0.26 $260.00 $0.95 $950.00 $1.00 $1,000.00 49 2582.502 12" SOLID LINE WHITE -EPDXY LIN FT 50 $6.00 $300.00 $6.30 $315.00 $8.06 $403.00 $9.00 $450.00 50 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 240 $2.00 $480.00 $0.55 $132.00 $1.90 $456.00 $2.00 $480.00 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $253,178.35 $270,812.75 $246,586.50 SCHEDULE B - SANITARY SEWER IMPROVEMENTS 51 2451.609 AGGREGATE FOUNDATION TON 50 $10.00 $500.00 $27.30 $1,365.00 $35.00 $1,750.00 $35.00 $1,750.00 52 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 $2,500.00 $7,455.00 $7,455.00 $2,000.00 $2,000.00 $2,500.00 $2,500.00 53 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 390 $38.00 $14,820.00 $44.10 $17,199.00 $43.00 $16,770.00 $40.00 $15,600.00 54 2503.603 TELEVISE SANITARY SEWER LIN FT 390 $2.00 $780.00 $2.63 $1,025.70 $3.00 $1,170.00 $2.00 $780.00 55 2506.516 CASTING ASSEMBLY (MANHOLE) EACH 2 $500.00 $1,000.00 $341.25 $682.50 $350.00 $700.00 $650.00 $1,300.00 56 2506.602 CHIMNEY SEAL EACH 2 $200.00 $400.00 $152.25 $304.50 $200.00 $400.00 $350.00 $700.00 57 2506.603 CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE LIN FT 43 $175.00 $7,525.00 $185.85 $7,991.55 $180.00 $7,740.00 $285.00 $12,255.00 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $36,023.25 $30,530.00 $34,885.00 SCHEDULE C - WATER MAIN IMPROVEMENTS 58 2451.609 GRANULAR FOUNDATION AND /OR BEDDING TON 50 $10.00 $500.00 $8.40 $420.00 $35.00 $1,750.00 $22.00 $1,100.00 59 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 $1,000.00 $1,000.00 $1,942.50 $1,942.50 $750.00 $750.00 $1,500.00 $1,500.00 60 2504.602 HYDRANT EACH 1 $3,000.00 $3,000.00 $3,150.00 $3,150.00 $3,900.00 $3,900.00 $3,850.00 $3,850.00 61 2504.602 16" BUTTERFLY VALVE AND BOX EACH 2 $8,500.00 $17,000.00 $3,202.50 $6,405.00 $2,700.00 $5,400.00 $3,850.00 $7,700.00 62 2504.602 6" GATE VALVE AND BOX EACH 1 $1,200.00 $1,200.00 $1,365.00 $1,365.00 $1,200.00 $1,200.00 $1,500.00 $1,500.00 63 2504.602 8" GATE VALVE AND BOX EACH 2 $2,000.00 $4,000.00 $1,785.00 $3,570.00 $1,600.00 $3,200.00 $3,250.00 $6,500.00 64 2504.603 HYDRANT EXTENSION LIN FT 1 $500.00 $500.00 $566.50 $566.50 $650.00 $650.00 $850.00 $850.00 65 2504.603 VALVE BOX EXTENSION LIN FT 1 $100.00 $100.00 $89.25 $89.25 $50.00 $50.00 $100.00 $100.00 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $36,023.25 $30,530.00 $34,885.00 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 5 $35.00 $175.00 $34.65 $173.25 $46.00 $230.00 $200.00 $1,000.00 • • Project: 02029 -19 - LINO - Otter Lake Road Extension Item No. Item Engineers Estimate T. A. Schifsky & Sons, Inc. Forest Lake Contracting, Inc. Dresel Contracting, Inc. Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 66 67 2504.603 16" WATER MAIN -DUCT IRON CL 52 LIN FT 370 $75.00 $27,750.00 $72.45 $26,806.50 $82.00 $30,340.00 $85.00 $31,450.00 68 69 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 120 $40.00 $4,800.00 $37.80 $4,536.00 $46.00 $5,520.00 $55.00 $6,600.00 2504.604 4" POLYSTYRENE INSULATION SQ YD 25 $45.00 $1,125.00 $18.90 $472.50 $29.00 $725.00 $20.00 $500.00 70 2504.608 DUCTILE IRON FITTINGS POUND 1500 $4.00 $6,000.00 $4.73 $7,095.00 $2.50 $3,750.00 $3.00 $4,500.00 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: SCHEDULE D - STORM SEWER IMPROVEMENTS $67,150.00 $56,591.50 $57,465.00 $67,150.00 71 72 2105.511 COMMON CHANNEL EXCAVATION CU YD 25 $15.00 $375.00 $40.00 $1,000.00 $25.00 $625.00 $85.00 $2,125.00 73 2105.607 POND EXCAVATION CU YD 850 $10.00 $8,500.00 $16.00 $13,600.00 $13.00 $11,050.00 $15.00 $12,750.00 2501.515 18" RC PIPE APRON EACH 1 $550.00 $550.00 $1,218.00 $1,218.00 $725.00 $725.00 $650.00 $650.00 74 75 2501.602 SKIMMER EACH 1 $4,000.00 $4,000.00 $3,727.50 $3,727.50 $3,200.00 $3,200.00 $3,500.00 $3,500.00 2501.602 TRASH GUARD FOR 18" PIPE APRON EACH 1 $300.00 $300.00 $262.50 $262.50 $400.00 $400.00 $450.00 $450.00 76 2502.541 4" PERF PE PIPE DRAIN LIN FT 100 $15.00 $1,500.00 $5.25 $525.00 $12.00 $1,200.00 $5.00 $500.00 77 78 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 360 $30.00 $10,800.00 $26.78 $9,640.80 $31.00 $11,160.00 $45.00 $16,200.00 79 2503.541 2506.501 18" RC PIPE SEWER DESIGN 3006 CLASS V CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 LIN FT 40 $32.00 $1,280.00 $29.40 $1,176.00 $32.00 $1,280.00 $65.00 $2,600.00 80 LIN FT 8.5 $250.00 $2,125.00 $262.50 $2,231.25 $330.00 $2,805.00 $350.00 $2,975.00 81 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 3 $1,300.00 $3,900.00 $1,554.00 $4,662.00 $800.00 $2,400.00 $1,450.00 $4,350.00 82 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 2 $500.00 $1,000.00 $588.00 $1,176.00 $625.00 $1,250.00 $650.00 $1,300.00 83 2511.501 RANDOM RIPRAP CLASS III CU YD 16 $100.00 $1,600.00 $110.00 $1,760.00 $105.00 $1,680.00 $165.00 $2,640.00 2511.515 GEOTEXTILE FILTER TYPE IV SQ YD 35 $3.00 $105.00 $5.00 $175.00 $2.00 $70.00 $5.00 $175.00 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $41,154.05 $37,845.00 $50,215.00 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $253,178.35 $270,812.75 $246,586.50 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $67,150.00 $56,591.50 $57,465.00 $67,150.00 $36,035.00 $41,154.05 $37,845.00 $50,215.00 Totals for Project 02029 -19 $411,057.00 $386,947.15 $396,652.75 $398,836.50 % of Estimate for Project 02029 -19 -5.87% -3.50% -2.97% • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Northwest Asphalt, Inc. Midwest Civil Constructors, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price SCHEDULE A - SURFACE IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $19,300.00 $19,300.00 $14,435.00 $14,435.00 $20,000.00 $20,000.00 2 2101.502 CLEARING TREE 25 $150.00 $3,750.00 $73.50 $1,837.50 $10.00 $250.00 3 2101.507 GRUBBING TREE 25 $200.00 $5,000.00 $73.50 $1,837.50 $10.00 $250.00 4 2102.501 PAVEMENT MARKING REMOVAL SQ FT 560 $3.00 $1,680.00 $1.50 $840.00 $1.50 $840.00 5 2102.502 PAVEMENT MARKING REMOVAL UN FT 750 $2.00 $1,500.00 $0.75 $562.50 $0.75 $562.50 6 2104.501 REMOVE CURB AND GUTTER UN FT 50 $4.00 $200.00 $4.00 $200.00 $2.00 $100.00 7 2104.503 REMOVE CONCRETE WALK SQ FT 200 $1.00 $200.00 $1.00 $200.00 $0.75 $150.00 8 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 160 $2.00 $320.00 $2.50 $400.00 $2.00 $320.00 9 2104.509 REMOVE SIGN EACH 1 $50.00 $50.00 $15.00 $15.00 $15.00 $15.00 10 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 10 $5.00 $50.00 $4.00 $40.00 $10.00 $100.00 11 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 155 $3.00 $465.00 $3.00 $465.00 $3.00 $465.00 12 2104.523 SALVAGE TEMPORARY BARRICADES EACH 11 $200.00 $2,200.00 $40.00 $440.00 $40.00 $440.00 13 2104.523 SALVAGE SIGN EACH 2 $75.00 $150.00 $15.00 $30.00 $15.00 $30.00 14 2105.507 SUBGRADE EXCAVATION (EV) CU YD 250 $13.00 $3,250.00 $12.70 $3,175.00 $8.50 $2,125.00 15 2105.522 SELECT GRANULAR BORROW (CV) CU YD 1720 $15.00 $25,800.00 $17.70 $30,444.00 $16.50 $28,380.00 16 2105.525 TOPSOIL BORROW (CV) CU YD 100 $10.00 $1,000.00 $30.00 $3,000.00 $10.00 $1,000.00 17 2106.607 EXCAVATION - COMMON (P) CU YD 3225 $10.00 $32,250.00 $12.70 $40,957.50 $11.70 $37,732.50 18 2112.501 SUBGRADE PREPARATION ROAD STA 3.7 $210.00 $777.00 $445.00 $1,646.50 $150.00 $555.00 19 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 5 $100.00 $500.00 $125.00 $625.00 $125.00 $625.00 20 2130.501 WATER M GALLONS 10 $30.00 $300.00 $50.00 $500.00 $40.00 $400.00 21 2211.501 AGGREGATE BASE CLASS 5 TON 2020 $12.00 $24,240.00 $13.12 $26,502.40 $13.00 $26,260.00 22 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 140 $5.00 $700.00 $3.00 $420.00 $3.05 $427.00 23 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 820 $65.00 $53,300.00 $71.75 $58,835.00 $69.00 $56,580.00 24 2521.501 6" CONCRETE WALK SQ FT 450 $6.00 $2,700.00 $7.20 $3,240.00 $6.50 $2,925.00 25 2521.511 2.5" BITUMINOUS WALK SQ FT 2200 $2.25 $4,950.00 $2.62 $5,764.00 $1.70 $3,740.00 26 2531.501 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 360 $15.00 $5,400.00 $17.91 $6,447.60 $13.75 $4,950.00 27 2531.602 PEDESTRIAN CURB RAMP EACH 2 $300.00 $600.00 $224.01 $448.02 $400.00 $800.00 28 2531.618 TRUNCATED DOMES SQ FT 100 $40.00 $4,000.00 $39.00 $3,900.00 $37.00 $3,700.00 29 2535.501 BITUMINOUS CURB LIN FT 365 $9.00 $3,285.00 $7.00 $2,555.00 $5.70 $2,080.50 30 2545.523 4" NON - METALLIC CONDUIT LIN FT 400 $5.00 $2,000.00 $5.00 $2,000.00 $5.00 $2,000.00 31 2554.602 TEMPORARY BARRICADES EACH 9 $500.00 $4,500.00 $100.00 $900.00 $100.00 $900.00 32 2563.601 TRAFFIC CONTROL LUMP SUM 1 $5,000.00 $5,000.00 $1,400.00 $1,400.00 $3,000.00 $3,000.00 33 2564.531 SIGN PANELS TYPE C SQ FT 27 $35.00 $945.00 $31.00 $837.00 $31.00 $837.00 34 2565.616 REVISE SIGNAL SYSTEM SYSTEM 1 $40,000.00 $40,000.00 $32,500.00 $32,500.00 $31,500.00 $31,500.00 • • • Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Northwest Asphalt, Inc. Midwest Civil Constructors, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 35 2573.502 SILT FENCE, TYPE PREASSEMBLED LIN FT 1000 $3.50 $3,500.00 $1.50 $1,500.00 $1.50 $1,500.00 36 2573.530 STORM DRAIN INLET PROTECTION EACH 7 $350.00 $2,450.00 $100.00 $700.00 $125.00 $875.00 37 2573.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 1 $2,500.00 $2,500.00 $1,000.00 $1,000.00 $2,500.00 $2,500.00 38 2575.501 SEEDING ACRE 1.25 $10,000.00 $12,500.00 $875.00 $1,093.75 $875.00 $1,093.75 39 2575.502 SEED MIXTURE 260 POUND 70 $5.00 $350.00 $2.55 $178.50 $2.55 $178.50 40 2575.502 SEED MIXTURE 310 POUND 20 $8.00 $160.00 $16.75 $335.00 $16.75 $335.00 41 2575.505 SODDING TYPE SALT RESISTANT SQ YD 240 $3.00 $720.00 $4.65 $1,116.00 $8.00 $1,920.00 42 2575.511 MULCH MATERIAL TYPE 1 TON 2 $250.00 $500.00 $525.00 $1,050.00 $525.00 $1,050.00 43 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD 1000 $3.00 $3,000.00 $1.30 $1,300.00 $1.30 $1,300.00 44 2575.532 FERTILIZER TYPE 2 POUND 200 $1.00 $200.00 $1.25 $250.00 $1.25 $250.00 45 2582.501 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM EACH 2 $250.00 $500.00 $256.00 $512.00 $256.00 $512.00 46 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM EACH 4 $250.00 $1,000.00 $256.00 $1,024.00 $256.00 $1,024.00 47 2582.501 PAVEMENT MESSAGE (RIGHT -THRU ARROW) POLY PREFORM EACH 3 $275.00 $825.00 $512.00 $1,536.00 $512.00 $1,536.00 48 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT 1000 $1.00 $1,000.00 $0.95 $950.00 $1.00 $1,000.00 49 2582.502 12" SOLID LINE WHITE -EPDXY LIN FT 50 $6.00 $300.00 $8.06 $403.00 $9.00 $450.00 50 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT 240 $2.00 $480.00 $1.90 $456.00 $2.00 $480.00 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $260,803.77 $250,043.75 SCHEDULE B - SANITARY SEWER IMPROVEMENTS 51 2451.609 AGGREGATE FOUNDATION TON 50 $10.00 $500.00 $25.00 $1,250.00 $35.00 $1,750.00 52 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1 $2,500.00 $2,500.00 $4,000.00 $4,000.00 $1,500.00 $1,500.00 53 2503.603 8" PVC PIPE SEWER - SDR 26 LIN FT 390 $38.00 $14,820.00 $83.71 $32,646.90 $110.00 $42,900.00 54 2503.603 TELEVISE SANITARY SEWER LIN FT 390 $2.00 $780.00 $2.00 $780.00 $1.85 $721.50 55 2506.516 CASTING ASSEMBLY (MANHOLE) EACH 2 $500.00 $1,000.00 $600.00 $1,200.00 $400.00 $800.00 56 2506.602 CHIMNEY SEAL EACH 2 $200.00 $400.00 $200.00 $400.00 $200.00 $400.00 57 2506.603 CONSTRUCT 48" DIAMETER SANITARY SEWER MANHOLE LIN FT 43 $175.00 $7,525.00 $133.00 $5,719.00 $170.00 $7,310.00 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 $55,381.50 SCHEDULE C - WATER MAIN IMPROVEMENTS 58 2451.609 GRANULAR FOUNDATION AND /OR BEDDING TON 50 $10.00 $500.00 $25.00 $1,250.00 $35.00 $1,750.00 59 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 60 2504.602 HYDRANT EACH 1 $3,000.00 $3,000.00 $2,915.00 $2,915.00 $4,750.00 $4,750.00 61 2504.602 16" BUTTERFLY VALVE AND BOX EACH 2 $8,500.00 $17,000.00 $3,035.00 $6,070.00 $4,700.00 $9,400.00 62 2504.602 6" GATE VALVE AND BOX EACH 1 $1,200.00 $1,200.00 $1,168.00 $1,168.00 $2,050.00 $2,050.00 63 2504.602 8" GATE VALVE AND BOX EACH 2 $2,000.00 $4,000.00 $1,552.00 $3,104.00 $2,850.00 $5,700.00 64 2504.603 HYDRANT EXTENSION LIN FT 1 $500.00 $500.00 $540.00 $540.00 $1,170.00 $1,170.00 65 2504.603 VALVE BOX EXTENSION LIN FT 1 $100.00 $100.00 $100.00 $100.00 $355.00 $355.00 • • • I hereby certify that this is an exact reproduction of bids received. Certifi Date: February 27, 2013 License No. 26768 Project: 02029 -19 - LINO - Otter Lake Road Extension Engineers Estimate Northwest Asphalt, Inc. Midwest Civil Constructors, LLC Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price 66 2504.603 16" WATER MAIN -DUCT IRON CL 52 LIN FT 370 $75.00 $27,750.00 $71.70 $26,529.00 $97.00 $35,890.00 67 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT 5 $35.00 $175.00 $49.58 $247.90 $123.00 $615.00 68 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT 120 $40.00 $4,800.00 $39.04 $4,684.80 $65.00 $7,800.00 69 2504.604 4" POLYSTYRENE INSULATION SQ YD 25 $45.00 $1,125.00 $26.00 $650.00 $33.00 $825.00 70 2504.608 DUCTILE IRON FITTINGS POUND 1500 $4.00 $6,000.00 $3.53 $5,295.00 $4.50 $6,750.00 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $54,053.70 $78,555.00 SCHEDULE D - STORM SEWER IMPROVEMENTS 71 2105.511 COMMON CHANNEL EXCAVATION CU YD 25 $15.00 $375.00 $20.00 $500.00 $18.00 $450.00 72 2105.607 POND EXCAVATION CU YD 850 $10.00 $8,500.00 $12.70 $10,795.00 $11.70 $9,945.00 73 2501.515 18" RC PIPE APRON EACH 1 $550.00 $550.00 $570.00 $570.00 $709.00 $709.00 74 2501.602 SKIMMER EACH 1 $4,000.00 $4,000.00 $6,500.00 $6,500.00 $7,000.00 $7,000.00 75 2501.602 TRASH GUARD FOR 18" PIPE APRON EACH 1 $300.00 $300.00 $281.00 $281.00 $263.00 $263.00 76 2502.541 4" PERF PE PIPE DRAIN LIN FT 100 $15.00 $1,500.00 $14.95 $1,495.00 $9.00 $900.00 77 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 360 $30.00 $10,800.00 $32.60 $11,736.00 $46.00 $16,560.00 78 2503.541 18" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 40 $32.00 $1,280.00 $36.05 $1,442.00 $49.00 $1,960.00 79 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 LIN FT 8.5 $250.00 $2,125.00 $255.00 $2,167.50 $335.00 $2,847.50 80 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 3 $1,300.00 $3,900.00 $1,600.00 $4,800.00 $941.00 $2,823.00 81 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 2 $500.00 $1,000.00 $525.00 $1,050.00 $500.00 $1,000.00 82 2511.501 RANDOM RIPRAP CLASS III CU YD 16 $100.00 $1,600.00 $100.00 $1,600.00 $85.00 $1,360.00 83 2511.515 GEOTEXTILE FILTER TYPE IV SQ YD 35 $3.00 $105.00 $3.00 $105.00 $3.00 $105.00 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $43,041.50 $45,922.50 Total SCHEDULE A - SURFACE IMPROVEMENTS: $280,347.00 $260,803.77 $250,043.75 Total SCHEDULE B - SANITARY SEWER IMPROVEMENTS: $27,525.00 4 r9 D $55,381.50 Total SCHEDULE C - WATER MAIN IMPROVEMENTS: $67,150.00 $54,053.70 $78,555.00 Total SCHEDULE D - STORM SEWER IMPROVEMENTS: $36,035.00 $43,041.50 $45,922.50 Totals for Project 02029 -19 $411,057.00 $429,902.75 % of Estimate for Project 02029 -19 -1.74% 4.58% I hereby certify that this is an exact reproduction of bids received. Certifi Date: February 27, 2013 License No. 26768 A WSB & Assoc- engineering• planning. environmental • construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 - 541 -4800 Fax: 763 -541 -1700 February 27, 2013 Honorable Mayor and City Council City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 Re: Otter Lake Road Extension City of Lino Lakes S.A.P. 210 - 114 -001 WSB Project No. 2029 -19 Dear Mayor and Council Members: Bids were received for the above - referenced project on Wednesday, February 27, 2013, and were opened and read aloud. Eleven bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bid as submitted by Arnt Construction Company, Inc., Hugo, Minnesota, in the amount of $326,366.20. The Engineer's Estimate for the project was $411,057.00. We recommend that the City Council consider these bids and award a contract in the amount of $326,366.20 to Arnt Construction Company, Inc. based on the results of the bids received. Sincerely, WSB & Associates, Inc. ason C. Wedel, PE City Engineer Enclosures cc: Nicholas Arnt, Arnt Construction Company, Inc. all St. Cloud • Minneapolis • St. Paul Equal Opportunity Employer wsbeng.com S: \CITY COUNCIL\STAFF REPORTS\2013 Staff Reports \03 March 2013\March 11Utem 6C Attachment 2.doc