RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS
FOR THE 2013 OVERLAY PROJECT
WHEREAS, it is proposed it patch the existing street, and place a bituminous wearing course
over the entire surface on recommended segments, and
WHEREAS, it is proposed to finance the project using the 2013 budget of $467,500 Allocated
for street repair.
NOW, THEREFORE BE IT RESOLVED by The City Council of The City of Lino Lakes,
Minnesota:
The City Engineer is designated as the engineer for this improvement and he is directed to prepare
plans and specifications for the 2013 Mill & Overlay Project and shall be paid by the hour in an
amount not to exceed $42,500.00.
Adopted by the Council of the City of Lino Lakes this 2 5 day of Mar c,120 1.3
The motion for the adoption of the foregoing resolution was introduced by Council Member
Roeser and was duly seconded by Council MemberRa f f e r t y and upon vote
being taken thereon, the following voted in favor thereof:
Roeser, Rafferty, Stoesz, O'Donnell, Reinert
The following voted against same:
none
ATTEST:
Iiliax�ne Bartell, City clerk
LOCHNESS
PARK
A
Palomino La
Palomino_ Thomas St e
d a
BEHM'S ya
PARK p0
a
0.
Lilac St
115th Ave •{`
I
Sunset
Oaks Park
,`,‘pth Ave NE
National St NE
109th Ave NE
53
Leonard Ave
cLa
r
m
Lilac St
77th St W
Lilac St
G 3
MarurS
itmimmmmm �
Lever St NE
• CBre6e Rue
7 NORTH CLA
9 STAR
`0 4
National St NE
108th Ave NE
N Fairmount Dr
in
106th Ave NE
107th Ave NE
105th Ave NE
104th La NE CENTENNIAL
PARK 1
104th Ave NE
49
TRAIL
103rd La NE
North Rd
101st La
Fa
Circle or Sep
\oiler Dr
INN (Gay`,11' 0t
Lakeview Dr
0
tl!
`1
N
Sunrise
Park
Glenview Dr
Elm Sit
�wM
Ulmer +Dr
d
st
N
Glenview La
Q
� St
MARSHAN
PARK
Lake Dr
Snow Owl La
Marshan
Lake
BALDWIN
PARK
Ricc
Lake
Legend
Mill & Overlay Project Location
RN( LAK
Project Location
S2013 Mill & Overlay Project
City of Lino Lakes, Minnesota
0
Document Path: K:\ 02029- 001 \G IS \Maps \MillOveday2013,
1,500 Feet
WSB
•
•
•
CITY COUNCIL
AGENDA ITEM 6D
STAFF ORIGINATOR: Jason C. Wedel, City Engineer
MEETING DATE: March 25, 2013
TOPIC: Consider Resolution No. 13 -34 Authorizing the Preparation of
Plans and Specifications, 2013 Overlay Project
VOTE REQUIRED: 3/5 Vote Required
INTRODUCTION
Staff is requesting Council authorization to prepare plans and specifications for the 2013 Overlay
Project.
BACKGROUND
In accordance with the City's Pavement Management Policy that was adopted by the City Council
on May 10, 2005, streets are selected annually for an overlay project. Overlaying is a maintenance
activity that includes patching of the existing street, milling the pavement adjacent to the curb,
followed by the placement of a bituminous wearing course over the entire surface.
The City currently utilizes Cartegraph software to annually analyze the conditions of the City's
streets and recommend segments that meet the overlaying requirements. Streets were selected for
overlays based on pavement management criteria, input from Public Works, and feasibility of
locations. The selected streets are Marvy Street, Jon Avenue, Rice Lake Drive, Rice Lake Lane,
Rice Lake Court, and Ulmer Drive.
The engineering cost to be paid by the hour shall not exceed $39,800.
The schedule for this project is as follows:
City Council Authorizes Plans and Specifications
City Council Approves Plans and Specifications
City Council Authorizes Ad for Bids
Open Bids
City Council Awards Contract
Construction Begins
RECOMMENDATION
March 25, 2013
May 28, 2013
May 28, 2013
June 26, 2013
July 8, 2013
July 29, 2013
Staff recommends adoption of Resolution 13 -34 Authorizing the Preparation of Plans and
Specifications for the 2013 Overlay Project.
ATTACHMENTS
1. Resolution No. 13 -34
2. Location Map
3. WSB & Associates Proposal
•
•
WSB
iNNIMMEM Engineering • Planning ■ Environmental • Construction 701 Xenia Avenue South
• Suite 300
Minneapolis, MN 55416
Tel: 763 -541 -4800
Fax: 763 -541 -1700
•
March 14, 2013
City of Lino Lakes
Mr. Michael Grochala
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Request for Proposal to Complete 2013 Street Maintenance Project
Dear Mr. Grochala:
The City of Lino Lakes has an annual street maintenance plan which consists of both sealcoating
and mill and overlay work. For calendar year 2013, the City has a total of $490,000 budgeted for
the sealcoat and mill and overlay project
As requested by the City of Lino Lakes, the following proposal details tasks that reflect our
understanding of the City's needs to complete the Street Maintenance Projects which include:
2013 Street Sealcoating Project and 2013 Mill and Overlay Project.
Based on the City's existing street maintenance plan and discussions with staff, WSB would
perform the following tasks:
Prepare Final Project Plans/Maps
Final construction plans and/or maps will be prepared indicating the project
locations and any specific work to be done outside of the scheduled maintenance
activities.
WSB will contact RCWD and Anoka County to determine if any permits are
required for the proposed work.
II. Final Quantities
An Engineer's Opinion of Probable Cost will be completed on the final
construction plans and maps.
Minneapolis • St. Cloud
Equal Opportunity Employer
Mr. Michael Grochala
March 14, 2013
Page 2
III. Prepare Permits, Specifications and Bidding Documents
WSB will assist the City in obtaining approvals from governmental authorities
having jurisdiction over the project if it is determined that they are needed. WSB
will assist the City in preparing permit application(s) and/or approval requests and
will assist the City with submitting the applications /approval requests to the
appropriate regulatory agencies.
WSB will develop the final project plans /maps and specifications based on the
agency review comments. This task will include an internal QA/QC review of the
final plans, quantities, and specifications.
Upon completion of permitting, and agency review and approval, a final set of
construction documents will be prepared for bidding.
WSB will print, assemble, and submit the final contract documents to the City and
request authorization to advertise the project for bidding. WSB will receive and
respond to bidder inquiries concerning the plans, specifications, and intent of the
project. Logs of all inquiries will be kept and maintained to document inquiries.
WSB will attend the project bid opening with the City.
WSB will review the low bidder's bid proposal, contractor's and subcontractor's
personnel proposed for the project and relative experience, quality and availability
of equipment, performance on similar projects, references, nature and extent of
other similar contracts, whether or not the contractor or subcontractors have ever
been denied contract award, and any other information that would affect the
ability of the contractor to perform the work.
IV. Construction Administration
WSB & Associates, Inc. will process the contract documents for signature by the
City and the contractor. We will also facilitate a preconstruction conference prior
to the start of the projects and prepare and distribute minutes for the meeting. We
will process all pay vouchers and change orders.
V. Construction Inspection
A construction observer will be provided during the project to monitor the work
and ensure City specifications are met.
VI. Testing Services
WSB will contract with a City approved testing firm to provide testing services as
needed for the materials supplied and placed within the projects.
•
•
•
Mr. Michael Grochala
March 14, 2013
Page 3
•
VII. Closeout Procedures
At the conclusion of the project, WSB will obtain all contractor documentation to
close out the project.
WSB & Associates would perform the previously identified tasks for each individual project:
2013 Sealcoating Project and 2013 Mill and Overlay Project.
The engineering fee to complete the 2013 Sealcoating Project is $9,800 (not to exceed).
The engineering fee to complete the 2013 Mil and Overlay Project is $42,500 (not to exceed).
This letter represents our complete understanding of the 2013 Street Maintenance Project and the
proposed scope of services. If you are in agreement with the scope of services and proposed fee,
please sign in the appropriate space below and return one copy to us.
If you have any questions about this proposal, please feel free to call me at 763- 287 -8520.
Sincerely,
WSB & Associates, Inc.
•
Jason C. Wedel, PE
Senior Project Manager
ACCEPTANCE:
The City of Lino Lakes hereby accepts the WSB proposal of $52,300 for all services outlined in
this letter.
City of Lino Lakes
Name
Title
Date
•