RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS
FOR THE 2013 SEALCOAT PROJECT
WHEREAS, it is proposed it perform maintenance activities on several city streets; and
WHEREAS, it is proposed to finance the project using the 2013 budget of $321,051.39 Allocated
for street repair along with Sealcoating Funds.
NOW, THEREFORE, BE IT RESOLVED by The City Council of The City of Lino Lakes,
Minnesota:
The City Engineer is designated as the engineer for this improvement and he is directed to prepare
plans and specifications for the 2013 Sealcoat Project and shall be paid by the hour in an amount
not to exceed $9,800.00.
Adopted by the Council of the City of Lino Lakes this 2 5 day olMa. r c 11 201 3
The motion for the adoption of the foregoing resolution was introduced by Council Member
Rafferty and was duly seconded by Council Member Stoesz and upon vote
being taken thereon, the following voted in favor thereof:
Rafferty, Stoesz, O'Donnell, Roeser, Reinert
The following voted against same:
none
ATTEST:
Juliann
Bartell, City Clerr
(53
101st La 1
49
`DD
4�
South
m
A
Rice
Lake
BALDWIN
PARK
d
Egret La
RICE GREEK
CHAIN OF LAKES
Baldwin
Lake
Reshanau
Lake
�aKes Dr
Count
Birch St ei
X d
Qpewa Tr <a
Arrowhea `a)
d Dr A,�
Hawthorn Rd VG. oo0-
Qine Tr ,mot A-
< e Ft' o}
tu
oDeSO� BNOVE k
o Linder PARK
0
fP
Coyote Tr
NGlen Tr
A
-J
0
O
x
Ina/
gnoindw
4
� I
0
O
■
Lexington
Pond
Baldwin Lake Rd
Woodridge La
Ash St
Doris Ave
v in
c N
u y 2
ca
6 o Q
O N
E — c
to A .Fs
Q U to
N
Scenic Dr
•'nvieWw
Elhc Lam
tliawtw
Emil Ave
Elaine Ave
N
a
Bucher Ave o
Mackubin St
Evergreen
Ponds
Bucher Ave
J
z
00
Sherwood
w Pond
Turtle Lake Rd
Ash St
Poplar
lake
Maple ,i
Legend
Seal Coat Project Location
Project Location
KES 2013 Seal Coat Project
City of Lino Lakes, Minnesota
0
Document Path: K: \02029 - 001 \GIS \Maps \SealCoat2013 i•
1,500 Feet
WS
WSB
R 11..r.,c Engineering • Planning • Environmental • Construction 701 Xenia Avenue South
411 Suite 300
Minneapolis, MN 55416
Tel: 763 - 541 -4800
Fax: 763 -541 -1700
•
March 14, 2013
City of Lino Lakes
Mr. Michael Grochala
600 Town Center Parkway
Lino Lakes, MN 55014
Re: Request for Proposal to Complete 2013 Street Maintenance Project
Dear Mr. Grochala:
The City of Lino Lakes has an annual street maintenance plan which consists of both sealcoating
and mill and overlay work. For calendar year 2013, the City has a total of $490,000 budgeted for
the sealcoat and mill and overlay project
As requested by the City of Lino Lakes, the following proposal details tasks that reflect our
understanding of the City's needs to complete the Street Maintenance Projects which include:
2013 Street Sealcoating Project and 2013 Mill and Overlay Project.
Based on the City's existing street maintenance plan and discussions with staff, WSB would
perform the following tasks:
Prepare Final Project Plans/Maps
Final construction plans and/or maps will be prepared indicating the project
locations and any specific work to be done outside of the scheduled maintenance
activities.
WSB will contact RCWD and Anoka County to determine if any permits are
required for the proposed work.
II. Final Quantities
An Engineer's Opinion of Probable Cost will be completed on the final
construction plans and maps.
Minneapolis ■ St. Cloud
Equal Opportunity Employer
Mr. Michael Grochala
March 14, 2013
Page 2
III. Prepare Permits, Specifications and Bidding Documents
WSB will assist the City in obtaining approvals from governmental authorities
having jurisdiction over the project if it is determined that they are needed. WSB
will assist the City in preparing permit application(s) and/or approval requests and
will assist the City with submitting the applications /approval requests to the
appropriate regulatory agencies.
WSB will develop the final project plans /maps and specifications based on the
agency review comments. This task will include an internal QA/QC review of the
final plans, quantities, and specifications.
Upon completion of permitting, and agency review and approval, a final set of
construction documents will be prepared for bidding.
WSB will print, assemble, and submit the final contract documents to the City and
request authorization to advertise the project for bidding. WSB will receive and
respond to bidder inquiries concerning the plans, specifications, and intent of the
project. Logs of all inquiries will be kept and maintained to document inquiries.
WSB will attend the project bid opening with the City.
WSB will review the low bidder's bid proposal, contractor's and subcontractor's
personnel proposed for the project and relative experience, quality and availability
of equipment, performance on similar projects, references, nature and extent of
other similar contracts, whether or not the contractor or subcontractors have ever
been denied contract award, and any other information that would affect the
ability of the contractor to perform the work.
IV. Construction Administration
WSB & Associates, Inc. will process the contract documents for signature by the
City and the contractor. We will also facilitate a preconstruction conference prior
to the start of the projects and prepare and distribute minutes for the meeting. We
will process all pay vouchers and change orders.
V. Construction Inspection
A construction observer will be provided during the project to monitor the work
and ensure City specifications are met.
VI. Testing Services
WSB will contract with a City approved testing firm to provide testing services as
needed for the materials supplied and placed within the projects.
•
•
•
Mr. Michael Grochala
March 14, 2013
Page 3
VII. Closeout Procedures
At the conclusion of the project, WSB will obtain all contractor documentation to
close out the project.
WSB & Associates would perform the previously identified tasks for each individual project:
2013 Sealcoating Project and 2013 Mill and Overlay Project.
The engineering fee to complete the 2013 Sealcoating Project is $9,800 (not to exceed).
The engineering fee to complete the 2013 Mill and Overlay Project is $42,500 (not to exceed).
This letter represents our complete understanding of the 2013 Street Maintenance Project and the
proposed scope of services. If you are in agreement with the scope of services and proposed fee,
please sign in the appropriate space below and return one copy to us.
If you have any questions about this proposal, please feel free to call me at 763 - 287 -8520.
Sincerely,
WSB & Associates, Inc.
Jason C. Wedel, PE
Senior Project Manager
ACCEPTANCE:
The City of Lino Lakes hereby accepts the WSB proposal of $52,300 for all services outlined in
this letter.
City of Lino Lakes
Name
Title
Date
•
•
CITY COUNCIL
AGENDA ITEM 6C
STAFF ORIGINATOR: Jason C. Wedel, City Engineer
MEETING DATE: March 25, 2013
TOPIC: Consider Resolution No. 13 -35 Authorizing the Preparation of
Plans and Specifications, 2013 Sealcoat Project
VOTE REQUIRED: 3/5 Vote Required
INTRODUCTION
Staff is requesting Council authorization to prepare plans and specifications for the 2013 Sealcoat
Project.
BACKGROUND
In accordance with the City's Pavement Management Policy that was adopted by the City Council
on May 10, 2005, streets are selected annually for sealcoating. Sealcoating is a maintenance
activity that places a thin layer of oil and rock on the street to enhance the surface and prolong the
useful life of the street.
The City currently utilizes Cartegraph software to annually analyze the conditions of the City's
streets and recommend segments that meet the requirements for sealcoating. Streets were selected
based on pavement management criteria, input from Public Works, and feasibility of locations.
The City has allocated a budget for the 2013 Sealcoat Project of $321,051.39.
The engineering cost to be paid by the hour shall not exceed $9,800.
The schedule for this project is as follows:
City Council Authorizes Plans and Specifications
City Council Approves Plans and Specifications
City Council Authorizes Ad for Bids
Open Bids
City Council Awards Contract
Construction Begins
RECOMMENDATION
January 9, 2012
February 27, 2012
February 27, 2012
March 29, 2012
April 9, 2012
June, 2012
Staff recommends adoption of Resolution 13 -35 Authorizing the Preparation of Plans and
Specifications for the 2013 Sealcoat Project.
ATTACHMENTS
1. Resolution No. 13 -35
2. Location Map
3. WSB & Associates Proposal
•
•