HomeMy WebLinkAbout2013-079 Council Resolution•
CITY OF LINO LAKES
RESOLUTION NO. 13-79
RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND
AUTHORIZING ADVERSTISEMENT FOR BIDS — 2013 OVERLAY PROJECT
WHEREAS, the City Engineer has prepared plans and specifications for the 2013 Overlay Project
and has presented such plans and specifications to the City Council for approval;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes,
Minnesota:
Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. The
City Engineer is directed to advertise for bids, provide construction observation, and close out the
project once it is complete, and shall be paid by the hour in an amount not to exceed $39,800.
The City clerk shall prepare and cause to be inserted in the official paper and in Finance and
Commerce an advertisement for bids for the making of such improvement under such approved
plans and specifications. The advertisement shall be published for two weeks, shall specify the
work to be done, shall state that bids will be received by the Clerk, at which time they will be
publicly opened at the City Hall by the City Clerk and Engineer, will then be tabulated, and will be
considered by the Council at 6:30 p.m. on July 22, 2013, in the Council chambers of the City Hall.
Any bidder whose responsibility is questioned during consideration of the bid will be given an
opportunity to address the Council on the issue of responsibility. No bids will be considered unless
sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check, bid bond or
certified check payable to the Clerk for five (5) percent of the amount of such bid.
Adopted by the Council of the City of Lino Lakes this 24th day of June , 2013.
The motion for the adoption of the foregoing resolution was introduced by Council Member
0' Donnell and was duly seconded by Council Member Rafferty and upon
vote being taken thereon, the following voted in favor thereof:
O'Donnell, Rafferty, Roeser, Stoesz, Reinert
The following voted against same:
none
ATTEST:
uli. ; e Bartell, C' Clerk
•
•
•
GOVERNING SPECIFICATIONS
2013 Overlay Project THIS WORK SHALL BE DONE IN ACCORDANCE AVM THE 2005 EDITION OF THE
for the City of MINNESOTA NS FOR CON TR TRANSPORTATION
"STANDARD AMENDMENTS FOR CONSTRUCTION", SPECIAL PROVISIONS,
AND ANY AMENDMENTS THERETO AND THE "STANDARD UTIIJIIES
SAND RATION FOR INSTALLATION. SERNCE LINE INSTALLATION
Lino Lakes, Minnesota AND STORM SEWER INSTALLAT ON' REFERENCED TEAM'
DATED 1999, OR AS MODIFIED IN THE PROJECT MANUAL.
/
l/
,/ / ///
///
O
'��
Ah4TRAFFIC
ALL TRAFFIC EDITIONS DANCES AND SIGNING M SHALL CONFORM
TO THE LATESO EDITIONS OF DHT E FI LD A MANUAL ON UPOORM
IRAFFlC CONTROL RAFFIC OND OLE FIELD MANUAL FOR TEMPORARY
CONTROL ZONE LAYOUTS.
Wm..
MARVY
STREET
Z
^I
m
'`t�
INDEX
SHEET NO. DESCRIPTION
A...
_.em
2 Typicol Sections and Oetoils
3 -4 Marvy Street and Jon Avenue
5 Rice Lake Lane
8 Rice Lake Drive
7 Ul,n Lake Court
8 Ulmer Drive
THIS PLAN SET CONTAINS 8 SHEETS
ALL WILL BE IEOERA4 STATE, CON CONSTRUCTION LAWS AND ORDINANCES
. APPLICABLE BL COMPLIED RA L IS THE CU0SLOCALI L OF ANDS PROJECT.
it
�",
1 _
■■ .-
1-.1n
r
.'
7
I. .I..
-_ i-_
_—
,i��ll11�1
�`
�� 1�I.y��
gpil
.
'
—
W''uIuw _
, ,,,.
Will )—
".
- rT-r -F1Tl
X
I
1 m
M..- MI
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE DRAWINGS
CONCERNING TYPE AND LOCATION OF PRIVATE UT1L/RES HAS BEEN
DESIGNATED UTILITY DUALITY LEVEL D. THIS OUAL/TY LEVEL WAS
DETERMINED ACCORDING TO THE GUIDELINES OF CI /ASCE 38 -02, ENTITLED
"STANDARD GUIDELINES FOR ME COLLECTION AND DEPICTION OF
EXISTING SUBSURFACE DATA ". THE CONTRACTOR /5 TO DETERM /NE THE
TYPE AND LOCATION OF PR /VATS UTILITIES AS MAY BE NECESSARY TO
AVOID DAMAGE THERETO.
moo "MI' ' .'
E� X11111.
NI
■
m
ism
m
m
z
I
-r,
IN= MI
S
MM
UQ
111111 ej
��
��
I
/
//
/ { /_�
/
— nu
�_ mm
ODICO
J
�:: Fl
u ,i
MEM
MIME
1.�
iiiii=
Mir
Ilar�r11111I
��w111111111�
—�
aim
1
m
;��
-:
ill
.,
-
DRIVE
I
rap
lULMER
i
jr
l 1
111.
C
I
—
'
I
D 1000 2000
lik
0 50 100
NMI
HORIZ. ririfir
0 50 100
_
1 1 I
VERT.
I
—
0 5 10
i—
1
xa
OA •E
Br
pW
MMO
Dee, BY
—
■IMEW CM 0.8,180810 =ECM IC RR .81104.031109
""" .��x..n em
WSB rot Xenia Annus Tomes l s=
w ;8
2013 Overlay Project
for the City of
Lino Lakes, Minnesota
VVSB PROD. NO 02029 -520 CITY PROD. NO 12 -02
SHEET
1
OF
8
r
Title Sheet
ahxd d BP
KAK
0
®
MexLM.R.1411.
Jeem a WON PE
ws 00/1•/19 •c WOE
4.141%,
JCW
MMWWIeR1Ir •DMINEI M•RWIIAn•mIMIWAT31
•
CITY COUNCIL
AGENDA ITEM 6C
STAFF ORIGINATOR: Jason C. Wedel, City Engineer
MEETING DATE.: June 24, 2013
TOPIC: Consider Resolution No. 13 -79, Approve Plans and Specifications
and Authorize Advertisement for Bids, 2013 Overlay Project
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND
In accordance with the City's Pavement Management Policy that was adopted by the City Council
on May 10, 2005, streets are selected annually for milling and overlaying. On March 25, 2013 the
City Council authorized the preparation of plans and specifications for the 2013 Overlay Project.
Candidate streets were selected based on recommendations from the Pavement Management
Report, Public Works input, and feasibility of locations.
• The original project scope presented to the City Council on March 25, 2013 included Marvy Street,
Jon Avenue, Rice Lake Lane, Rice Lake Drive, Rice Lake Court, and Ulmer Drive.
•
Overlaying is typically a maintenance activity that includes patching of the existing street, followed
by the placement of a bituminous wearing course of the entire surface. As part of the design of the
improvements, pavement corings were performed on the existing streets. It was discovered that
there is an inadequate amount of existing pavement to perform a traditional mill and overlay on
some of the streets. This project will therefore require the complete reclamation of the existing
bituminous in place and 3 -1/2 inches of new bituminous on Rice Lake Lane, Rice Lake Court and
Jon Avenue. The remaining streets, Rice Lake Drive, Ulmer Drive, and Marvy Street will be edge
milled and 1 -1/2 inches of new bituminous will be installed.
The City's budget for 2013 Pavement Management Projects is $490,000. This year's projects
breakdown as follows:
2013 Mill & Overlay Project (including engineering) $166,500
2013 Reclamation Project (including engineering) $270,800
2013 Sealcoating (including engineering & striping) $ 65,000
Total Cost $502,300
Due to the fact that this year's sealcoating project is smaller than previous years and is well below
the $100,000 threshold required for public bidding, we will be requesting quotes for the sealcoating
and bring them back to the City Council for approval. We will also bring back separate quotes for
the striping.
•
Similar to last year, we have purposely exceeded our budget with this year's project knowing that
actually project costs typically come in a little lower than estimated. However, we want to utilize as
much of the budget as possible each year to maximize the amount of street maintenance we are
completing.
The schedule for this project is as follows:
City Council Authorizes Plans and Specifications
City Council Approves Plans and Specifications
City Council Authorizes Ad for Bids
Open Bids
City Council Awards Contract
Construction Begins
RECOMMENDATION
March 25, 2013
June 24, 2013
June 24, 2013
July 17, 2013
July 22, 2013
August, 2013
Staff recommends adoption of Resolution 13 -79 Approving Plans and Specifications and
Authorizing Advertisement for Bids for the 2013 Overlay Project.
ATTACHMENTS
• 1. Location Map
•