410 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT,
2013 MILL AND OVERLAY IMPROVEMENT
•
•
WHEREAS, pursuant to an advertisement for bids for the construction of the 2013 Mill and
Overlay Improvements, bids were received, opened and tabulated according to law, and the
following bids were received complying with the advertisement:
Contractor Amount of bid
FPI Paving Contractors, Inc. $346,023.00
North Metro Asphalt & Contracting $298,805.00
North Valley, Inc. $333,606.32
Rum River Contracting $288,687.24
Engineer's Estimate $349,900.00
AND WHEREAS, it appears that Rum River Contracting is the lowest responsible bidder;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Rum
River Contracting, in the name of the City of Lino Lakes for the construction of the 2013
Mill and Overlay Improvements according to the plans and specifications approved by the
City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid
Bonds made with their bids, except that the deposits of the successful bidder and the next
two lowest bidders shall be retained until a contract has been signed.
Adopted by the Council of the City of Lino Lakes this 2 2 day of July , 2013.
The motion for the adoption of the foregoing resolution was introduced by Council Member
StopGz and was duly seconded by Council Member O' Donnell and upon
vote being taken thereon the following voted in favor thereof:
Stoesz, O'Donnell, Rafferty, Roeser, Reinert
The following voted against same:
none
ATTEST:
Jeff Reinert,
•
•
•
CITY COUNCIL
AGENDA ITEM 6Ai
STAFF ORIGINATOR: Jason C. Wedel, City Engineer
MEETING DATE: July 22, 2013
TOPIC: Resolution No. 13 -85, Accepting bids and Awarding a Construction
Contract, 2013 Mill and Overlay Improvement
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND
Sealed bids were received and publicly opened at 10:00 a.m. on July 17, 2013. The results of the
bid opening are presented below. City Council action is required to award a construction contract
to the lowest responsible bidder.
Contractor Amount of bid
FPI Paving Contractors, Inc. $346,023.00
North Metro Asphalt & Contracting $298,805.00
North Valley, Inc. $333,606.32
Rum River Contracting $288,687.24
Engineer's Estimate $349,900.00
The low bids are competitive bids for this project. A copy of the complete bid tabulation is
attached. The final completion date for this project is September 15, 2013.
RECOMMENDATION
Staff recommends adoption of Resolution 13 -85 Accepting Bids and Awarding a Construction
Contract for the 2013 Mill and Overlay Improvement.
ATTACHMENTS
1. Bid Tabulation
•
WSB
cf, Assnciares. Inc.
Project Name.
LINO 013 MIN &Overlay
Client: City of Lino Lakes
Bid Opening: 7/17/13 at 10:00 a.m.
Contract No.:
Project No.: 02029 -52
Owner: Minneaoolis
•
WSB
Project Bid Abstract
Denotes Corrected Figure
7/17/2013
Project: 02029 -52 - LINO - 2013 MM & Overlay Project
Engineers Estimate
Rum Rarer Contracting
North Metro MPh &
contracting
North Valley, Inc.
Item No.
Item
Units
Quantity
Unit Price Total Price
Unit Price Total Price
Unit Price Total Price
Unit Price Total Price
SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS
1
2021.501
MOBILIZATION
LUMP SINN
1
$16,600.00
$16,600.00
$13,300.00
$13,300.00
$14,900.00
$14,900.00
$20,657.94
$20,657.94
2
2104.501
REMOVE BITUMINOUS CURB
LIN FT
4000
$3.00
$12,000.00
$0.15
$600.00
$2.00
$8,000.00
$2.15
$8,600.00
3
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
120
$3.50
$420.00
$3.15
$378.00
$4.00
$480.00
$3.22
$386.40
4
2112.501
SUBGRADE PREPARATION (SPECIAL)
ROAD STA
31
$200.00
$6,200.00
$322.58
$9,999.98
$300.00
$9,300.00
$660.03
$20,460.93
5
2232.604
EDGE MILL BITUMINOUS SURFACE W WIDE (0.00" TO 1.01
SQ YD
9550
$2.00
$19,100.00
$1.15
$10,982.50
$1.30
$12,415.00
$1.60
$15,280.00
6
2331.604
BITUMINOUS PAVEMENT RECLAMATION
SQ YD
10100
$2.00
$20,200.00
$1.09
$11,009.00
$1.85
$18,685.00
$1.27
$12,827.00
7
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
1860
$3.50
$6,510.00
$3.15
$5,859.00
$3.00
$5,580.00
$3.45
$6,417.00
8
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)
TON
2400
$65.00
$156,000.00
$60.72
$145,728.00
$58.50
$140,400.00
$59.97
$143,928.00
9
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B)
TON
1300
$63.00
$81,900.00
$63.58
$82,654.00
$58.25
$75,725.00
$61.81
$80,353.00
10
2504.602
ADJUST GATE VALVE
EACH
4
$150.00
$600.00
$76.26
$305.04
$250.00
$1,000.00
$321.94
$1,287.76
11
2506.602
ADJUST FRAME & RING CASTING
EACH
6
$150.00
$900.00
$188.62
$1,131.72
$500.00
$3,000.00
$536.57
$3,219.42
12
2535.501
BITUMINOUS CURB
LIN FT
4000
$7.00
$28,000.00
$0.25
$1,000.00
$1.00
$4,000.00
$2.68
$10,720.00
13
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
0.7
$1,500.00
$1,050.00
$7,000.00
$4,900.00
$6,000.00
$4,200.00
$11,686.49
$8,180.54
14
2575.502
SEED MIXTURE 260
POUND
70
$3.00
$210.00
$2.00
$140.00
$10.00
$700.00
$8.21
$574.70
15
2575.519
DISK ANCHORING
ACRE
0.7
$300.00
$210.00
$1,000.00
$700.00
$600.00
$420.00
$1,019.47
$713.63
Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS:
$349,900.00
$288,687.24
$298,805.00
$333,606.32
Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $288,687.24 $298,805.00 $333,606.32
Totals for Project 02029 -52
$349,900.00
$288,687.24
$298,805.00
$333,606.32
% of Estimate for Project 02029 -52
- 17.49%
- 14.60%
-4.66%
•
•
1 hereby certify that this is an exact reproduction of bids received.
Certified By:
Date: July 17, 2013
License No. 26768
Project: 02029 -52 - LINO - 2013 Mill & Overlay Project
Engineers Estimate
FPI Paving Contractors
Item No.
Item
Units
Quantity
Unit Price Total Price
Unit Price Total Price
SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS
1
2021.501
MOBILIZATION
LUMP SUM
1
$16,600.00
$16,600.00
$25,000.00
$25,000.00
2
2104.501
REMOVE BITUMINOUS CURB
LIN FT
4000
$3.00
$12,000.00
$5.00
$20,000.00
3
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
120
$3.50
$420.00
$2.50
$300.00
4
2112.501
SUBGRADE PREPARATION (SPECIAL)
ROAD STA
31
$200.00
$6,200.00
$150.00
$4,650.00
5
2232.604
EDGE MILL BITUMINOUS SURFACE 8' WIDE (0.00" TO 1.0 ")
SQ YD
9550
$2.00
$19,100.00
$1.10
$10,505.00
6
2331.604
BITUMINOUS PAVEMENT RECLAMATION
SQ YD
10100
$2.00
$20,200.00
$1.80
$18,180.00
7
2357.502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
1860
$3.50
$6,510.00
$3.50
$6,510.00
8
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (2,B)
TON
2400
$65.00
$156,000.00
$61.00
$146,400.00
9
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B)
TON
1300
$63.00
$81,900.00
$61.00
$79,300.00
10
2504.602
ADJUST GATE VALVE
EACH
4
$150.00
$600.00
$65.00
$260.00
11
2506.602
ADJUST FRAME & RING CASTING
EACH
6
$150.00
$900.00
$275.00
$1,650.00
12
2535.501
BITUMINOUS CURB
LIN FT
4000
$7.00
$28,000.00
$6.00
$24,000.00
13
2575.501
SEEDING (INCL TOPSOIL & FERTILIZER)
ACRE
0.7
$1,500.00
$1,050.00
$11,435.00
$8,004.50
14
2575.502
SEED MIXTURE 260
POUND
70
$3.00
$210.00
$8.05
$563.50
15
2575.519
DISK ANCHORING
ACRE
0.7
$300.00
$210.00
$1,000.00
$700.00
Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS:
$349,900.00
$346,023.00
Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $346,023.00
Totals for Project 02029 -52
$349,900.00
$346,023.00
% of Estimate for Project 02029 -52
- 1.11%
1 hereby certify that this is an exact reproduction of bids received.
Certified By:
Date: July 17, 2013