Loading...
HomeMy WebLinkAbout2013-085 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 13-85 410 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT, 2013 MILL AND OVERLAY IMPROVEMENT • • WHEREAS, pursuant to an advertisement for bids for the construction of the 2013 Mill and Overlay Improvements, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of bid FPI Paving Contractors, Inc. $346,023.00 North Metro Asphalt & Contracting $298,805.00 North Valley, Inc. $333,606.32 Rum River Contracting $288,687.24 Engineer's Estimate $349,900.00 AND WHEREAS, it appears that Rum River Contracting is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Rum River Contracting, in the name of the City of Lino Lakes for the construction of the 2013 Mill and Overlay Improvements according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidder the Bid Bonds made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. Adopted by the Council of the City of Lino Lakes this 2 2 day of July , 2013. The motion for the adoption of the foregoing resolution was introduced by Council Member StopGz and was duly seconded by Council Member O' Donnell and upon vote being taken thereon the following voted in favor thereof: Stoesz, O'Donnell, Rafferty, Roeser, Reinert The following voted against same: none ATTEST: Jeff Reinert, • • • CITY COUNCIL AGENDA ITEM 6Ai STAFF ORIGINATOR: Jason C. Wedel, City Engineer MEETING DATE: July 22, 2013 TOPIC: Resolution No. 13 -85, Accepting bids and Awarding a Construction Contract, 2013 Mill and Overlay Improvement VOTE REQUIRED: 3/5 Vote Required BACKGROUND Sealed bids were received and publicly opened at 10:00 a.m. on July 17, 2013. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of bid FPI Paving Contractors, Inc. $346,023.00 North Metro Asphalt & Contracting $298,805.00 North Valley, Inc. $333,606.32 Rum River Contracting $288,687.24 Engineer's Estimate $349,900.00 The low bids are competitive bids for this project. A copy of the complete bid tabulation is attached. The final completion date for this project is September 15, 2013. RECOMMENDATION Staff recommends adoption of Resolution 13 -85 Accepting Bids and Awarding a Construction Contract for the 2013 Mill and Overlay Improvement. ATTACHMENTS 1. Bid Tabulation • WSB cf, Assnciares. Inc. Project Name. LINO 013 MIN &Overlay Client: City of Lino Lakes Bid Opening: 7/17/13 at 10:00 a.m. Contract No.: Project No.: 02029 -52 Owner: Minneaoolis • WSB Project Bid Abstract Denotes Corrected Figure 7/17/2013 Project: 02029 -52 - LINO - 2013 MM & Overlay Project Engineers Estimate Rum Rarer Contracting North Metro MPh & contracting North Valley, Inc. Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SINN 1 $16,600.00 $16,600.00 $13,300.00 $13,300.00 $14,900.00 $14,900.00 $20,657.94 $20,657.94 2 2104.501 REMOVE BITUMINOUS CURB LIN FT 4000 $3.00 $12,000.00 $0.15 $600.00 $2.00 $8,000.00 $2.15 $8,600.00 3 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 120 $3.50 $420.00 $3.15 $378.00 $4.00 $480.00 $3.22 $386.40 4 2112.501 SUBGRADE PREPARATION (SPECIAL) ROAD STA 31 $200.00 $6,200.00 $322.58 $9,999.98 $300.00 $9,300.00 $660.03 $20,460.93 5 2232.604 EDGE MILL BITUMINOUS SURFACE W WIDE (0.00" TO 1.01 SQ YD 9550 $2.00 $19,100.00 $1.15 $10,982.50 $1.30 $12,415.00 $1.60 $15,280.00 6 2331.604 BITUMINOUS PAVEMENT RECLAMATION SQ YD 10100 $2.00 $20,200.00 $1.09 $11,009.00 $1.85 $18,685.00 $1.27 $12,827.00 7 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1860 $3.50 $6,510.00 $3.15 $5,859.00 $3.00 $5,580.00 $3.45 $6,417.00 8 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) TON 2400 $65.00 $156,000.00 $60.72 $145,728.00 $58.50 $140,400.00 $59.97 $143,928.00 9 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) TON 1300 $63.00 $81,900.00 $63.58 $82,654.00 $58.25 $75,725.00 $61.81 $80,353.00 10 2504.602 ADJUST GATE VALVE EACH 4 $150.00 $600.00 $76.26 $305.04 $250.00 $1,000.00 $321.94 $1,287.76 11 2506.602 ADJUST FRAME & RING CASTING EACH 6 $150.00 $900.00 $188.62 $1,131.72 $500.00 $3,000.00 $536.57 $3,219.42 12 2535.501 BITUMINOUS CURB LIN FT 4000 $7.00 $28,000.00 $0.25 $1,000.00 $1.00 $4,000.00 $2.68 $10,720.00 13 2575.501 SEEDING (INCL TOPSOIL & FERTILIZER) ACRE 0.7 $1,500.00 $1,050.00 $7,000.00 $4,900.00 $6,000.00 $4,200.00 $11,686.49 $8,180.54 14 2575.502 SEED MIXTURE 260 POUND 70 $3.00 $210.00 $2.00 $140.00 $10.00 $700.00 $8.21 $574.70 15 2575.519 DISK ANCHORING ACRE 0.7 $300.00 $210.00 $1,000.00 $700.00 $600.00 $420.00 $1,019.47 $713.63 Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $288,687.24 $298,805.00 $333,606.32 Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $288,687.24 $298,805.00 $333,606.32 Totals for Project 02029 -52 $349,900.00 $288,687.24 $298,805.00 $333,606.32 % of Estimate for Project 02029 -52 - 17.49% - 14.60% -4.66% • • 1 hereby certify that this is an exact reproduction of bids received. Certified By: Date: July 17, 2013 License No. 26768 Project: 02029 -52 - LINO - 2013 Mill & Overlay Project Engineers Estimate FPI Paving Contractors Item No. Item Units Quantity Unit Price Total Price Unit Price Total Price SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS 1 2021.501 MOBILIZATION LUMP SUM 1 $16,600.00 $16,600.00 $25,000.00 $25,000.00 2 2104.501 REMOVE BITUMINOUS CURB LIN FT 4000 $3.00 $12,000.00 $5.00 $20,000.00 3 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 120 $3.50 $420.00 $2.50 $300.00 4 2112.501 SUBGRADE PREPARATION (SPECIAL) ROAD STA 31 $200.00 $6,200.00 $150.00 $4,650.00 5 2232.604 EDGE MILL BITUMINOUS SURFACE 8' WIDE (0.00" TO 1.0 ") SQ YD 9550 $2.00 $19,100.00 $1.10 $10,505.00 6 2331.604 BITUMINOUS PAVEMENT RECLAMATION SQ YD 10100 $2.00 $20,200.00 $1.80 $18,180.00 7 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1860 $3.50 $6,510.00 $3.50 $6,510.00 8 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) TON 2400 $65.00 $156,000.00 $61.00 $146,400.00 9 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) TON 1300 $63.00 $81,900.00 $61.00 $79,300.00 10 2504.602 ADJUST GATE VALVE EACH 4 $150.00 $600.00 $65.00 $260.00 11 2506.602 ADJUST FRAME & RING CASTING EACH 6 $150.00 $900.00 $275.00 $1,650.00 12 2535.501 BITUMINOUS CURB LIN FT 4000 $7.00 $28,000.00 $6.00 $24,000.00 13 2575.501 SEEDING (INCL TOPSOIL & FERTILIZER) ACRE 0.7 $1,500.00 $1,050.00 $11,435.00 $8,004.50 14 2575.502 SEED MIXTURE 260 POUND 70 $3.00 $210.00 $8.05 $563.50 15 2575.519 DISK ANCHORING ACRE 0.7 $300.00 $210.00 $1,000.00 $700.00 Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $346,023.00 Total SCHEDULE A - MILL AND OVERLAY IMPROVEMENTS: $349,900.00 $346,023.00 Totals for Project 02029 -52 $349,900.00 $346,023.00 % of Estimate for Project 02029 -52 - 1.11% 1 hereby certify that this is an exact reproduction of bids received. Certified By: Date: July 17, 2013 License No. 26768