Loading...
HomeMy WebLinkAbout2013-088 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 13-88 RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING REQUEST FOR QUOTES - 2013 SURFACE WATER IMPROVEMENT PROJECT WHEREAS, the City Engineer has prepared plans and specifications for the 2013 Surface Water Improvement Project and has presented such plans and specifications to the City Council for approval; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino Lakes, Minnesota: Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. The City Engineer is directed to request quotes, provide construction observation, and close out the project once it is complete, and shall be paid by the hour in an amount not to exceed $19,500. Adopted by the Council of the City of Lino Lakes this 12th day of Aug , 2013. The motion for the adoption of the foregoing resolution was introduced by Council Member Roeser and was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: Roeser, Rafferty, O'Donnell, Reinert The following voted against same: none (absent - Stoesz) ATTEST: • • •, STAFF ORIGINATOR: MEETING DATE: TOPIC: VOTE REQUIRED: INTRODUCTION CITY COUNCIL AGENDA ITEM 6B Jason C. Wedel, City Engineer August 12, 2013 Consider Resolution No. 13 -88, Approve Plans and Specifications and Authorize the Request for Quotes, 2013 Surface Water Management Project 3/5 Vote Required Staff is requesting council action to approve the plans and specification and authorize the request for quotes for the 2013 Surface Water Management Project. Funding for the engineering and the maintenance contract is included in the 2013 Public Services — Streets budget. BACKGROUND The City operates a storm water conveyance system to manage water runoff and water quality from City streets and neighborhoods. To maintain the effectiveness of the system, cleaning and repair of pipe sections, catch basins, manholes, drainage ways and ponds must be completed. City staff conducts annual reviews of the system components as required by the City's National Pollutant Discharge Elimination System (NPDES) permit. Project priorities are determined following completion of the inspection process and evaluation of resident issues identified during the year. The City's budget for the 2013 Surface Water Improvement Project is $125,000. This year's projects breakdown as follows: Engineering (Surveying, Design, & Construction Observation) Construction Total Cost $19,500 $95,000 $1 14,500 • • • The schedule for this project is as follows: City Council Authorizes Plans and Specifications City Council Approves Plans and Specifications City Council Authorizes Ad for Bids City Council Awards Contract Construction RECOMMENDATION June 10, 2013 August 12, 2013 August 12, 2013 September 9,2013 September /October 2013 Staff recommends adoption of Resolution 13 -88 Approving Plans and Specifications and Authorizing Request for Quotes for the 2013 Surface Water Improvement Project. ATTACHMENTS 1. Resolution No. 13 -88 2. Location Map Sunflower Smoketree Fairmont Dr. Drainage Improvement Green BFiar Dr Sunset Dr. Drainage Improvement Gree Slier Dr Wildflower Gladstone Dr. Drainage Improvement 105th Gladstone Dr (.1[Y OF RN L KES 2013 Surface Water Management Project City of Lino Lakes MN N - WSB 1 inch = 300 feet ASS- Document Path: K:1 02 02 9- 5 7 01GtSV Aapa\Dranapalmprovemenb.mxd Date Saved: 8/5/2013 3:06:00 PM