HomeMy WebLinkAbout2013-099 Council Resolution• • • CITY OF LINO LAKES RESOLUTION NO. 13-99 RESOLUTION ACCEPTING QUOTES AND AWARDING A CONTRACT FOR THE 2013 SURFACE WATER MANAGEMENT PROJECT WHEREAS, pursuant to a request for quotes for the storm water maintenance project, quotes were received, and the following quotes were received complying with the request Contractor Amount of Quote C.W. Houle Penn Contracting Minnesota Utilities & Excavating $69,988.00 $87,144.00 $103,044.00 NOW, THEREFORE, BE IT RESOLVED by The City Council of The City of Lino Lakes, Minnesota: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with C.W. Houle, in the name of the City of Lino Lakes for the 2013 Surface Water Management Project. Adoption by the Lino Lakes City Council this 9th day of September, 2013 The motion for the adoption of the foregoing resolution was introduced by Council Member 0' Donnell and was duly seconded by Council Member Rafferty and upon vote being taken thereon, the following voted in favor thereof: O'Donnell, Rafferty, Roeser, Stoesz, Reinert The following voted against same: none ATTEST: Jul e Bartell City Clerk Document Path: K: \02029- 570\GIS\Meps \Dra Fairmont Dr. Drainage Improvement eneg elea peurslu Wd 00'90,£ CIO Gladstone Dr. Drainage Improvement 2013 Surface Water Management Project City of Lino Lakes MN - WSB 1 inch = 300 feet 4 Associates, • • • CITY COUNCIL AGENDA ITEM 6D STAFF ORIGINATOR: Jason C. Wedel, City Engineer MEETING DATE: September 9, 2013 TOPIC: Consider Resolution No. 13 -99, Accepting Quotes and Awarding a Contract for the 2013 Surface Water Management Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND As part of the annual budget, the City Council approved $125,000 for surface water improvement projects in 2013. The City is required to make repairs and maintain our existing storm water infrastructure per our MS4 permit with the Minnesota Pollution Control Agency. In 2012, the City replaced a number of smaller culverts, cleaned out ditches and ponds, and replaced several storm sewer structures. In all, work was done in nine different areas throughout the City. This year we have included three high priority areas that need repairs in the same general area of the City and combined them into one project. The proposed project areas are shown on the attached map. The three different locations in this year's project include work such as culvert replacement and cleaning, the addition of catch basins and storm sewer in low areas that currently pond water, and sediment removal from existing ditches. Plans were prepared and sent out to contractors for quotes. The City received three quotes and they are as follows: Contractor C.W. Houle Penn Contracting Minnesota Utilities & Excavating Engineer's Estimate The total budget for this project breaks down as follows: Amount of bid $69,988.00 $87,144.00 $103,044.00 $81,360.00 Engineering (Approved by City Council 6 /10/13) $19,500.00 C.W. Houle Quote $69,988.00 Total $89,488.00 The completion date for the project is October 31, 2013. RECOMMENDATION • Staff recommends adoption of Resolution 13 -99 Accepting Quotes and Awarding a Contract for the 2013 Surface Water Management Project. ATTACHMENTS 1. Resolution No. 13 -99 2. Location Map • •