Loading...
HomeMy WebLinkAbout2013-113 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 13 -113 APPROVING CHANGE ORDER NO. 1, 2013 SURFACE WATER MANAGEMENT PROJECT WHEREAS, pursuant to the resolution of the Council adopted September 9, 2013, the City awarded the contract for the 2013 Surface Water Management Project to C.W. Houle; and WHEREAS, it has been determined that an additional project area can be added to this project; NOW, THEREFORE, BE IT RESOLVED by the City Council of Lino Lakes, Minnesota that Change Order No. 1 in the amount of $23,950 is approved for a revised contract amount of $93,938.00. Adopted by the Lino Lakes City Council this 14th day of October, 2013. • The motion for the adoption of the foregoing resolution was introduced by Council Member Rafferty and was duly seconded by Council Member Stoesz and upon vote being taken thereon, the following voted in favor thereof: Rafferty, Stoesz, Roeser, O'Donnell, Reinert The following voted against same: none ATTEST: • u ie Bartell, C ty Cler • • se CITY COUNCIL AGENDA ITEM 6E STAFF ORIGINATOR: Jason C. Wedel, City Engineer MEETING DATE: May 13, 2012 TOPIC: Consider Resolution No. 13 -113 Approving Change Order No. 1, 2013 Surface Water Management Project VOTE REQUIRED: BACKGROUND 3/5 Vote Required At the September 9, 2013 meeting, City Council awarded the 2013 Surface Water Management Project to C.W. Houle. Construction began in September and is nearly complete. It was discussed at the City Council meeting awarding the contract that the project was projected to come in significantly under budget and that staff would identify an addition project area for City Council consideration. An additional project area has been identified as the ditch and culvert along the north side of Birch Street from Deerwood Lane to 600 feet east. The ditch in this area needs to be cleaned out and the culvert under Deerwood Lane needs to be replaced. Currently, this section of trail floods each spring to the point that the City has to close it down for public use. The proposed improvements are intended to alleviate this issue so that any flooding will be minimized in the future. The contractor for our current project has reviewed the prepared plans and presented a change order in the amount of $23,950 to complete this work. Financing for this project as originally proposed is still sufficient with the proposed change order. A breakdown of the construction cost is as follows: Original Contract Amount Engineering Costs Change Order No. 1 Total Construction Cost $ 69,988 $ 19,500 $ 23,950 $113,438 Annual Budget $125,000 RECOMMENDATION Approve Resolution 13 -113, Approving Change Order No. 1, 2013 Surface Water Management Project. ATTACHMENTS 1. Resolution No. 13 -113