HomeMy WebLinkAbout2013-116 Council ResolutionCITY OF LINO LAKES
RESOLUTION NO. 13 -116
RESOLUTION ACCEPTING BIDS AND AWARDING
CONTRACT FOR SALT STORAGE BUILDING
WHEREAS, The City of Lino Lakes solicited bids for the construction of a Salt Shed Storage
Building located at the Lino Lakes Public Works Facility and,
WHEREAS, bids were opened on October 7th for the construction of the concrete footings and
foundation piers, 8' high concrete bunker panels, as well as the installation of a 65' x 64'
natural light fabric structure and,
WHEREAS, two bids were received as follows:
Greystone Construction
Four Winds Builders
$98,305.00
$107,886.25
WHEREAS, Anoka County has utilized Greystone Construction for several of their other salt
shed storage buildings and is very satisfied with the quality of work.
• NOW, THEREFORE BE IT RESOLVED by the City Council of The City of Lino Lakes,
Minnesota:
1. That the City Council hereby accepts the bids and awards the contract to Greystone
Construction and authorizes the Mayor and City Clerk to execute the contract on behalf
of the City.
Adopted by the Council of the City of Lino Lakes this 28 day ofoct , 2013
The motion for the adoption of the foregoing resolution was introduced by Council Member
O' Donnell and was duly seconded by Council Member Roeser
and upon vote being taken thereon, the following voted in favor thereof:
O'Donnell, Roeser, Rafferty, Stoesz,
The following voted against same:
none
ATTEST:
Jul . nne Bartell, Ci y Clerk
Jeff Reine
Whereupon said resolution was declared duly passed and adopted.
•
•
•
CITY COUNCIL
AGENDA ITEM 5B
STAFF ORIGINATOR: Rick DeGardner, Public Services Director
MEETING DATE: October 28, 2013
TOPIC: Consideration of Resolution No. 13 -116, Accepting Bids and
Awarding Contract for Salt Shed Storage Building
VOTE REQUIRED: 3/5
INTRODUCTION
The City of Lino Lakes solicited bids for the construction of a Salt Shed Storage Building
located at the Lino Lakes Public Works Facility. Bids were opened on October 7th for the
construction of the concrete footings and foundation piers, 8' high concrete bunker panels, as
well as the installation of a 65' x 64' natural light fabric structure. Two bids were received as
follows:
Greystone Construction
Four Winds Builders
$98,305.00
$107,886.25
BACKGROUND
As discussed at last month's City Council work session (as well as the previous agenda item),
this project is a joint effort between the City of Lino Lakes and Anoka County. All associated
costs related to the construction of the salt shed storage building (including 100% of this
contract as well as the bituminous work which will be done later this fall) will be funded by
Anoka County. Anoka County has also agreed to pay for 50% of the site improvements related
to wetland enhancements.
Anoka County has utilized Greystone Construction for several of their other salt shed storage
buildings and is very satisfied with the quality of work.
RECOMMENDATION
Staff recommends the City Council approve Resolution 13 -116, accept the bids and award the
Contract for Salt Shed Storage Building to Greystone Construction.
ATTACHMENTS
Resolution No. 13 -116