Loading...
HomeMy WebLinkAbout2007-012 Council Resolution• • Council Member carisoni introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 07 -12- RESOLUTION APPROVING PAYMENT REQUEST NO. 3 (FINAL) AND COMPENSATING CHANGE ORDER NO. 1 — 2006 BIRCH STREET TRAIL PROJECT WHEREAS, the 2006 Birch Street Trail Project has been completed by T.A. Schifsky and Sons, Inc., and WHEREAS, the one -year warranty period for this project will begin with the Final Payment. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: Compensating Change Order No. 1 and Payment Request No. 3 (Final) is approved for a final contract amount of $130,364.40. nne Bartell ity Jerk Adopted by the Lino Lakes City Council this 22nd day of January, 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member 0' Donnelland upon vote being taken thereon, the following voted in favor thereof: Carlson, O'Donnell, Reinert, Bergeson The following voted against same: Whereupon said resolution was declared duly passed and adopted. • AGENDA ITEM 1 F STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: January 22, 2007 TOPIC: Resolution No. 07 -15, Approving Payment Request No. 3 (Final) and Compensating Change Order No. 1, 2006 Birch Street Trail Project. VOTE REQUIRED: 3/5 Vote Required BACKGROUND: The contractor for the 2006 Birch Street Trail Project, T.A. Schifsky and Sons, Inc. is • requesting City approval of Payment Request No. 3 (Final) in the amount of $6,518.22. A copy of the Final Payment is attached. The contractor has satisfactorily completed all work and has provided all necessary documentation. Also included with the request for Final Payment is Compensating Change Order No. 1 in the deduct amount of $18,680.60. A copy of the Compensating Change Order is attached. With this Change Order, the final contract amount is $130,364.40, which is below the contract amount and the Engineers Estimate of $139,390.00. Approval of the Final Payment will begin the one -year warranty period. RECOMMENDATION: Staff recommends approval of Resolution 07 -15, Payment Request No. 3 (Final) and Compensating Change Order No. 1, 2006 Birch Street Trail Project. • TKDA ENGINEERS • ARCHITECTS • PLANNERS 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 -2140 (651) 292 -4400 (651) 292-0083 fax www.tkda.com Proj. No. 13633.003 Cert. No. 3 (Final) St. Paul, MN, November 30 , 2006 To City of Lino Lakes, Minnesota Owner This Certifies that T.A. Schifsky and Sons, Inc. , Contractor For 2006 Birch Street Trail Is entitled to Six Thousand Five Hundred Eighteen Dollars and 22/100 - -- - - -- ($ 6,518.22 ) (FINAL) being 3rd estimate for partial payment on contract with you dated June 26 , 2006 Received payment in full of above Certificate. TKDA T.A. Schifsky & Sons, Inc. , 20 Patrick M. Windier, P.E. • RECAPITULATION OF ACCOUNT An Employee Owned Company Promoting Affirmative Action and Equal Opportunity CONTRACT PLUS EXTRAS PAYMENTS CREDITS Contract price plus extras $ 149,045.00 All previous payments $ 123,846.18 All previous credits Extra No. Compensating Change Order No. 1 $ (18,680.60) Credit No. $ - „ „ AMOUNT OF THIS CERTIFICATE $ 6,518.22 Totals $ 130,364.40 $ 130,364.40 $ - Credit Balance $ - There will remain unpaid on contract after payment of this Certificate $ - $ 130,364.40 $ 130,364.40 I $ - I An Employee Owned Company Promoting Affirmative Action and Equal Opportunity TKDA Engineers - Architects - Planners Saint Paul, Minnesota 55101 PERIODICAL ESTIMATE FOR PARTIAL PAYMENTS Estimate No. 3 (F) Period Ending November 30 , 20 06 Page 1 of 1 Proj. No. 13633.003 Contractor T.A. Schifsky Original Contract Amount 149,045.00 Project 2006 Birch Street Trail Location City of Lino Lakes, Minnesota Total Contract Work Completed Total Approved Credits Total Approved Extra Work Completed Approved Extra Orders Amount Completed Total Amount Earned This Estimate 0.00 $ 130,364.40 $ 0.00 $ 0.00 $ 130,364.40 Less Approved Credits $ 0.00 Less 0 % Retained $ 0.00 Less Previous Payments $ 123,846.18 Total Deductions $ 123,846.18 Amount Due This Estimate Contractor aLti- >y V2L kit s ond • T.A. Schifsjy Engineer Ra�ha�.�Z . Y " \ ti ^✓°-c�"'� Patrick M. Windier, P.E. $ 6,518.22 Date 1 3" 1'OL Date November 30, 2006 ESTIMATE NO. 3 FINAL 06 BIRCH STREET TRAIL TY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13633.003 ITEM NO. DESCRIPTION PERIOD ENDING: November 30, 2006 CONTRACT QUANTITY UNIT AMOUNT UNIT QUANTITY TO DATE PRICE TO DATE 2006 BIRCH STREET TRAIL 1 MOBILIZATION LS 1.0 1.0 $ 7,000.00 $ 7,000.00 2 REMOVE (MILL) BITUMINOUS SURFACING (2' WIDTH) LF 250.0 103.0 $ 10.00 $ 1,030.00 3 REMOVE EXISTING 15" CMP CULVERT LS 1.0 1.0 $ 330.00 $ 330.00 4 REMOVE AND REINSTALL SALVAGED SIGNS EA 4.0 4.0 $ 200.00 $ 800.00 5 COMMON EXCAVATION (P) CY 720.0 720.0 $ 14.00 $ 10,080.00 6 SUBGRADE EXCAVATION CY 150.0 150.0 $ 14.00 $ 2,100.00 7 SELECT GRANULAR BORROW (CV) CY 300.0 290.0 $ 12.50 $ 3,625.00 8 IMPORTED TOPSOIL BORROW (LV) CY 665.0 572.0 $ 16.00 $ 9,152.00 9 AGGREGATE BASE, CLASS 5 FOR TRAIUDRIVEWAY (100% CRUSHED) TN 1,160.0 881.4 $ 17.00 $ 14,983.80 10 TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIUDRIVEWAY TN 260.0 230.2 $ 68.00 $ 15,653.60 11 MODULAR BLOCK RETAINING WALL SF 500.0 130.0 $ 29.00 $ 3,770.00 12 15" RC PIPE APRON EA 2.0 2.0 $ 560.00 $ 1,120.00 13 18" RC PIPE APRON EA 1.0 1.0 $ 630.00 $ 630.00 14 18" CS METAL APRON EA 1.0 1.0 $ 350.00 $ 350.00 15 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 12.0 16.0 $ 69.00 $ 1,104.00 16 18" RC PIPE SEWER, DESIGN 3006 CLASS V LF 16.0 32.0 $ 72.00 $ 2,304.00 17 18" CS PIPE SEWER LF 85.0 146.0 $ 30.00 $ 4,380.00 18 CONSTRUCT MANHOLE, TYPE 403 EA 1.0 1.0 $ 2,200.00 $ 2,200.00 1 *ADJUST FRAME AND RING CASTING (CB OR MH) EA 1.0 $ 550.00 $ ADJUST GATE VALVE BOX EA 2.0 7.0 $ 300.00 $ 2,100.00 21 RANDOM RIPRAP CLASS III CY 10.0 10.0 $ 65.00 $ 650.00 22 4" CONCRETE WALK (PED RAMPS) SF 510.0 315.0 $ 9.00 $ 2,835.00 23 TRUNCATED DOME (PED RAMPS) SF 80.0 40.0 $ 45.00 $ 1,800.00 24 REMOVE AND REINSTALL EXISTING CHAIN LINK FENCE LS 1.0 1.0 $ 700.00 $ 700.00 25 6' CHAIN LINK FENCE LF 50.0 50.0 $ 45.00 $ 2,250.00 26 FURNISH AND INSTALL REMOVABLE BOLLARD EA 1.0 1.0 $ 800.00 $ 800.00 27 TRAFFIC CONTROL LS 1.0 1.0 $ 1,800.00 $ 1,800.00 28 ZEBRA CROSSWALK WHITE, PAINT SF 270.0 300.0 $ 3.00 $ 900.00 29 SILT FENCE, TYPE PREASSEMBLED LF 1,300.0 1,300.0 $ 2.50 $ 3,250.00 30 HAY BALE DITCH CHECK LF 150.0 150.0 $ 4.00 $ 600.00 31 SODDING TYPE SALT RESISTANT SY 6,000.0 6,480.0 $ 2.80 $ 18,144.00 32 TRENCH FRAME W/ GRATED COVER (R- 4996 -A1) LF 24.0 24.0 $ 410.00 $ 9,840.00 33 4" D.I.P. CLASS 52 (STORM SEWER) LF 40.0 34.0 $ 32.00 $ 1,088.00 34 CONNECT TO EXIST. 12" RC PIPE EA 3.0 3.0 $ 330.00 $ 990.00 35 BERM GRADING LS 1.0 1.0 $ 2,005.00 $ 2,005.00 TOTAL ESTIMATE NO. 3 FINAL $ 130,364.40 • • • • CHANGE ORDER TKDA Engineers - Architects - Planners Compensating Saint Paul, MN November 30 20 06 Proj. No. 13633.003 Change Order No. 1 To T.A. Schifsky and Sons, Inc. for 2006 Birch Street Trail for City of Lino Lakes, Minnesota You are hereby directed to make the following change to your contract dated June 26 , 20 06 . The change and the work affected thereby is subject to all contract stipulations and covenants. This Change Order will (inereace) (decrease) (age) the contract sum by Eighteen Thousand Six Hundred Eighty and 60/100 ($ 18,680.60 ). COMPENSATING CHANGE ORDER This change order shows the actual quantities installed at the unit price bid amounts (see attached itemization): NET CHANGE = $18,680.60 Amount of Original Contract $ 149,045.00 Additions approved to date (Nos. ) $ Deductions approved to date (Nos. ) $ Contract amount to date $ 149,045.00 Amount of this Change Order (Add) (Deduct) (No- Change) $ (18,680.60) Revised Contract Amount $ 130,364.40 Approved City of Lino Lakes, Minnesota TKDA Owner By Approved T.A. Schifsky and Sons, Inc. By Contractor Patrick M. Windier, P.E. White - Owner Pink - Contractor Blue - TKDA COMPENSATING CHANGE ORDER NO. 1 ar006 BIRCH STREET TRAIL TY OF LINO LAKES, MINNESOTA DA PROJECT NO. 13633.003 PERIOD ENDING: November 30, 2006 ITEM CONTRACT QUANTITY UNIT AMOUNT NET CONTRACT NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE CHANGE AMOUNT 2006 BIRCH STREET TRAIL 1 MOBILIZATION LS 1.0 1.0 $ 7,000.00 $ 7,000.00 $ - $ 7,000.00 2 REMOVE (MILL) BITUMINOUS SURFACING (2' WIDTH) LF 250.0 103.0 $ 10.00 $ 1,030.00 $ (1,470.00) $ 2,500.00 3 REMOVE EXISTING 15" CMP CULVERT LS 1.0 1.0 $ 330.00 $ 330.00 $ - $ 330.00 4 REMOVE AND REINSTALL SALVAGED SIGNS EA 4.0 4.0 $ 200.00 $ 800.00 $ $ 800.00 5 COMMON EXCAVATION (P) CY 720.0 720.0 $ 14.00 $ 10,080.00 $ $ 10,080.00 6 SUBGRADE EXCAVATION CY 150.0 150.0 $ 14.00 $ 2,100.00 $ $ 2,100.00 7 SELECT GRANULAR BORROW (CV) CY 300.0 290.0 $ 12.50 $ 3,625.00 $ (125.00) $ 3,750.00 8 IMPORTED TOPSOIL BORROW (LV) CY 665.0 572.0 $ 16.00 $ 9,152.00 $ (1,488.00) $ 10,640.00 9 AGGREGATE BASE, CLASS 5 FOR TRAIL/DRIVEWAY (100% CRUSHED) TN 1,160.0 881.4 $ 17.00 $ 14,983.80 $ (4,736.20) $ 19,720.00 10 TYPE LV 4 WEARING COURSE MIXTURE FOR TRAIUDRIVEWAY TN 260.0 230.2 $ 68.00 $ 15,653.60 $ (2,026.40) $ 17,680.00 11 MODULAR BLOCK RETAINING WALL SF 500.0 130.0 $ 29.00 $ 3,770.00 $ (10,730.00) $ 14,500.00 12 15" RC PIPE APRON EA 2.0 2.0 $ 560.00 $ 1,120.00 $ $ 1,120.00 13 18" RC PIPE APRON EA 1.0 1.0 $ 630.00 $ 630.00 $ $ 630.00 14 18" CS METAL APRON EA 1.0 1.0 $ 350.00 $ 350.00 $ $ 350.00 15 15" RC PIPE SEWER, DESIGN 3006 CLASS V LF 12.0 16.0 $ 69.00 $ 1,104.00 $ 276.00 $ 828.00 16 18" RC PIPE SEWER, DESIGN 3006 CLASS V LF 16.0 32.0 $ 72.00 $ 2,304.00 $ 1,152.00 $ 1,152.00 17 18" CS PIPE SEWER LF 85.0 146.0 $ 30.00 $ 4,380.00 $ 1,830.00 $ 2,550.00 18 CONSTRUCT MANHOLE, TYPE 403 EA 1.0 1.0 $ 2,200.00 $ 2,200.00 $ $ 2,200.00 19 ADJUST FRAME AND RING CASTING (CB OR MH) EA 1.0 $ 550.00 $ $ (550.00) $ 550.00 20 ADJUST GATE VALVE BOX EA 2.0 7.0 $ 300.00 $ 2,100.00 $ 1,500.00 $ 600.00 21 RANDOM RIPRAP CLASS III CY 10.0 10.0 $ 65.00 $ 650.00 $ $ 650.00 22 4" CONCRETE WALK (PED RAMPS) SF 510.0 315.0 $ 9.00 $ 2,835.00 $ (1,755.00) $ 4,590.00 23 TRUNCATED DOME (PED RAMPS) SF 80.0 40.0 $ 45.00 $ 1,800.00 $ (1,800.00) $ 3,600.00 24 REMOVE AND REINSTALL EXISTING CHAIN LINK FENCE LS 1.0 1.0 $ 700.00 $ 700.00 $ - $ 700.00 25 6' CHAIN LINK FENCE LF 50.0 50.0 $ 45.00 $ 2,250.00 $ $ 2,250.00 26 FURNISH AND INSTALL REMOVABLE BOLLARD EA 1.0 1.0 $ 800.00 $ 800.00 $ $ 800.00 • 27 TRAFFIC CONTROL LS 1.0 1.0 $ 1,800.00 $ 1,800.00 $ - $ 1,800.00 8 ZEBRA CROSSWALK WHITE, PAINT SF 270.0 300.0 $ 3.00 $ 900.00 $ 90.00 00 $ 810.00 9 SILT FENCE, TYPE PREASSEMBLED LF 1,300.0 1,300.0 $ 2.50 $ 3,250.00 $ $ 3,250.00 30 HAY BALE DITCH CHECK LF 150.0 150.0 $ 4.00 $ 600.00 $ - $ 600.00 31 SODDING TYPE SALT RESISTANT SY 6,000.0 6,480.0 $ 2.80 $ 18,144.00 $ 1,344.00 $ 16,800.00 32 TRENCH FRAME W/ GRATED COVER (R- 4996 -A1) LF 24.0 24.0 $ 410.00 $ 9,840.00 $ $ 9,840.00 33 4" D.I.P. CLASS 52 (STORM SEWER) LF 40.0 34.0 $ 32.00 $ 1,088.00 $ (192.00) $ 1,280.00 34 CONNECT TO EXIST. 12" RC PIPE EA 3.0 3.0 $ 330.00 $ 990.00 $ - $ 990.00 35 BERM GRADING LS 1.0 1.0 $ 2,005.00 $ 2,005.00 $ - $ 2,005.00 TOTAL COMPENSATING CHANGE ORDER NO. 1 $ 130,364.40 $ (18,680.60) $ 149,045.00 •