HomeMy WebLinkAbout2007-047 Council Resolution•
•
Council Member o' Donnelintroduced the following resolution and moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 07 -47
RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT
LINO LAKES REGIONAL TRAIL IMPROVEMENTS
WHEREAS, pursuant to an advertisement for bids for the construction of the Lino Lakes
Regional Trail Improvement project, bids were received March 15, 2007, opened and tabulated
according to law, and the following bids were received complying with the advertisement:
Contractor
Total Bid
1
W.B. Miller Inc.
$99,585.15
2
Rum River Contracting Co.
$102,906.98
3
North Pine Aggregate, Inc.
$103,276.00
4
Jay Bros. Inc.
$105,999.60
5
T.A. Schifsky & Sons Inc.
$106,575.00
6
Peterson Companies, Inc.
$110,999.40
7
Hard rives Inc.
$113,019.30
8
Forest Lake Contracting, Inc.
$114,317.20
9
Northwest Asphalt
$118,034.80
10
North Valley, Inc.
$124,075.90
11
Gustafason Excavating, Inc.
$130,991.00
12
Barber Const., Inc.
$142,630.00
13
Midwest Asphalt Corporation
$144,968.90
14
Sunram Construction Inc.
$155,946.00
15
American Tank Services, Inc.
$166,951.42
16
Olson's Excavating Service, Inc.
$1,196,390.45
AND WHEREAS, it appears that W.B. Miller of EIk River, Minnesota is the lowest responsible
bidder;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO
LAKES, MINNESOTA:
1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with W.B.
Miller of EIk River, Minnesota in the name of the City of Lino Lakes for the construction of
the Lino Lakes Regional Trail Improvements Project in the amount of $99,585.15, according
to the plans and specifications approved by the City Council and on file in the office of the
City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the
deposits made with their bids, except that the deposits of the successful bidder and the next
lowest bidder shall be retained until a contract has been signed.
•
Julianne Bartell, City clerk
Adopted by the Lino Lakes City Council this 26th day of March, 2007.
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member Reinert and upon vote being taken thereon, the following voted in favor
thereof:
O'Donnell, Reinert, Stoltz, Carlson, Bergeson
The following voted against same:
none
Whereupon said resolution was declared duly passed and adopted.
•
•
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
AGENDA ITEM 6A
Michael Grochala,
March 26, 2007
Consideration of Resolution No. 07 -47, Accepting
Bids and Awarding Contract, Lino Lakes Regional
Trail Improvements
VOTE REQUIRED: Simple Majority
BACKGROUND:
Sealed bids were received and publicly opened at 10:00 a.m. on March 15, 2007 for the
proposed Lino Lakes Regional Trail improvement project. A total of sixteen (16) bids
were received. The results of the bid opening are presented below.
City Council action is required to award a construction contract to the lowest
responsible bidder.
Contractor
Total Bid
1
W.B. Miller Inc.
$99,585.15
2
Rum River Contracting Co.
$102,906.98
3
North Pine Aggregate, Inc.
$103,276.00
4
Jay Bros. Inc.
$105,999.60
5
T.A. Schifsky & Sons Inc.
$106,575.00
6
Peterson Companies, Inc.
$110,999.40
7
Hardrives Inc.
$113,019.30
8
Forest Lake Contracting, Inc.
$114,317.20
9
Northwest Asphalt
$118,034.80
10
North Valley, Inc.
$124,075.90
11
Gustafason Excavating, Inc.
$130,991.00
12
Barber Const., Inc.
$142,630.00
13
Midwest Asphalt Corporation
$144,968.90
14
Sunram Construction Inc.
$155,946.00
15
American Tank Services, Inc.
$166,951.42
16
Olson's Excavating Service, Inc.
$1,196,390.45
The low bid received was submitted by W.B. Miller of Elk River, Minnesota in the
amount of $99,585.15. The engineers estimate for the project was $185,446.00. A
copy of the consulting engineer's recommendation and the complete bid tabulation are
attached.
• RECOMMENDATION:
Staff recommends adoption of Resolution No. 07 -47 awarding the contract to W.B.
Miller.
ATTACHMENTS
1. Resolution No. 07-47
2. Engineers Recommendation
3. Bid Tabulation
•
• SEH
•
•
March 15, 2207
Honorable Mayor and City Council
City of Lino Lakes
600 Town Center Parkway
Lino Lakes, MN 55014 -1182
Attn: Michael Grochala, Community Development Director
Dear Mayor and Council Members:
RE: Lino Lakes, Minnesota
Lino Lakes Regional Trail
SEH Project No. A- LINOL0305.03 6.00
On Thursday, March 15, 2007, at 10:00 a.m., sixteen bids were received for the referenced project. Please find
enclosed the bid tabulation detailing the results for the 3 lowest bids. The bid results are summarized below.
Contractor
Total Bid
1
W.B. Miller Inc.
$ 99,585.15
2
Rum River Contracting Co.
$ 102,906.98
3
North Pine Aggregate, Inc
$ 103,276.00
Engineer's Estimate
$ 185,446.00
The low bid received was submitted by W.B. Miller, Inc., of Elk River in the amount of $99,585.15.
In reliance on our experience with W.B. Miller and/or materials and information provided by the contractor,
we have determined that 1) they have a sufficient understanding of the project and equipment to perform the
construction for which it bid; and 2) according to their bonding agent they presently have the financial ability
to complete the project bid. SEH makes no representation or warranty as to the actual financial viability of the
contractor or its ability to complete its work.
Accordingly, we recommend the project be awarded to W.B. Miller in the amount of $99,585.15, contingent
upon the City's receipt of all permits and easements if all permits and easements have not been obtained at the
time of award.
Sincerely,
g- 7
Anthony J. Kutzke, EIT
Project Engineer
Enclosure
nm
s:AkoA1 \lino1V030503\regional trail\recawardltr.doc
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110 -5196
SEH is an equal opportunity employer 1 www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax
Bid Tabulation
Lino Lakes, Minnesota SEH
Regional Trail
SEH No. A- LINOL0305.03
Engineer's Estimate
$185,446.00
1
W.B. Miller Inc.
$99,585.15
2
Rum River Contracting Co.
$102,906.98
3
North Pine Aggregate, Inc
$103,276.00
NO. IITEM
DESCRIPTION I UNIT 1 QUANTITY
UNIT PRICE I
TOTAL COST
UNIT PRICE
I TOTAL COST
UNIT PRICE I
TOTAL COST
UNIT PRICE I
TOTAL COST
Trail Improvements
$8,000.00
$250.00
$250.00
$12.00
$15.00
$50.00
$1,500.00
$250.00
$3.00
$22.00
$30.00
$125.00
$2.00
$300.00
$20.00
1
Mobilization
LS
1
$8,000.00
$4,742.15
$4,742.15
$6,000.00
$6,000.00
$5,000.00
$5,000.00
2
Clearing
EA
10
$2,500.00
$250.00
$2,500.00
$250.00
$2,500.00
$270.00
$2,700.00
3
Grubbing
EA
55
$13,750.00
$55.00
$3,025.00
$40.00
$2,200.00
$43.50
$2,392.50
4
Common Excavation (P)
CY
1,200
$14,400.00
$5.60
$6,720.00
$1.87
$2,244.00
$9.55
$11,460.00
5
Muck Excavation
CY
250
$3,750.00
$8.00
$2,000.00
$8.54
$2,135.00
$8.65
$2,162.50
6
18" RCP Storm Sewer, Class V
LF
64
$3,200.00
$55.00
$3,520.00
$38.51
$2,464.64
$43.00
$2,752.00
7
18" RCP Apron w/Trash Guard
EA
2
$3,000.00
$1,135.00
$2,270.00
$1,130.52
$2,261.04
$1,005.00
$2,010.00
8
Subgrade Preparation
RD STA.
28
$7,000.00
$150.00
$4,200.00
$105.00
$2,940.00
$85.00
$2,380.00
9
Geotextile Fabric, Type V (P)
SY
3,730
$11,190.00
$0.80
$2,984.00
$0.75
$2,797.50
$1.20
$4,476.00
10
Select Granular Borrow (CV)
CY
500
$11,000.00
$9.00
$4,500.00
$19.25
$9,625.00
$10.00
$5,000.00
11
Aggregate Base, Class 5 (CV) (P)
CY
740
$22,200.00
$24.10
$17,834.00
$29.67
$21,955.80
$17.50
$12,950.00
12
Bituminous Wear Type LV WE45030B Mixture
T
560
$70,000.00
$61.30
$34,328.00
$63.50
$35,560.00
$69.50
$38,920.00
13
Erosion Control Blanket - Category 2
SY
1,200
$2,400.00
$1.50
$1,800.00
$1.20
$1,440.00
$1.25
$1,500.00
14
Seeding
ACRE
1.4
$420.00
$500.00
$700.00
$200.00
$280.00
$335.00
$469.00
15
Seed Mixture - Type 240
LBS
110
$2,200.00
$2.20
$242.00
$2.60
$286.00
$2.40
$264.00
16
Fertilizer
LBS
560
$1.10
$2.50
$616.00
$0.50
$280.00
$0.55
$308.00
$0.25
$140.00
17
Silt Fence
LF
1,800
$4,500.00
$2.00
$3,600.00
$1.15
$2,070.00
$1.85
$3,330.00
18
Mn/DOT Type 6 Hydraulic Siol Stabilizer
T
2.8
$1,300.00
$3,640.00
$950.00
$2,660.00
$1,200.00
$3,360.00
$875.00
$2,450.00
19
Bioroll
LF
400
$3.00
$1,200.00
$2.50
$1,000.00
$3.70
$1,480.00
$5.30
$2,120.00
20
Riprap Class III
CY
8
$60.00
$480.00
$85.00
$680.00
$125.00
$1,000.00
$100.00
$800.00
TOTAL BID
$185,446.00
$99,585.15
$102,906.98
$103,276.00
\\Sp3020 -1\ projects \KO \L\Linol\030503 \Regional Trail \[bidtab Regional Trail Bid 031507.xls]bidtab
Bid Op0March 15, 2007
Engineer's Estimate
W.B. Miller Inc.
6701 Norris Lake Rd. NW
Elk River, MN 55330
Tele. 763.241.0397
Fax. 763.241.0580
SHORT ELLIO 'NDRICKSON INC.
Rum River Contracting Co.
31913 124th St.
Princeton, MN 55371
Tele. 763.389.3718
Fax. 763.389.3213
North Pine Aggregate, Inc
14551 Lake Dr.
Forest Lake, MN 55025
Tele. 651.464.6802
Fax. 651.464.8456
�E 1 OF 5
Bid Tabulation
Lino Lakes, Minnesota SEH
Regional Trail
SEH No. A- LINOL0305.03
4
Jay Bros. Inc.
$105,999.60
5
T.A. Schifsky & Sons Inc.
$106,575.00
6
Peterson Companies Inc.
$110,999.40
7
Hard rives Inc.
$113,019.30
NO. IITEM DESCRIPTION I UNIT I QUANTITY
I UNIT PRICE TOTAL COST
UNIT PRICE I TOTAL COST
UNIT PRICE I TOTAL COST
UNIT PRICE I TOTAL COST
Trail Improvements
1
Mobilization
LS
1
$2,100.00
$2,100.00
$5,075.00
$5,075.00
$4,000.00
$4,000.00
$10,000.00
$10,000.00
2
Clearing
EA
10
$188.00
$1,880.00
$255.00
$2,550.00
$275.00
$2,750.00
$110.00
$1,100.00
3
Grubbing
EA
55
$29.00
$1,595.00
$44.00
$2,420.00
$50.00
$2,750.00
$28.00
$1,540.00
4
Common Excavation (P)
CY
1,200
$4.10
$8.75
$10,500.00
$6.75
$8,100.00
$2.25
$2,700.00
5
Muck Excavation
CY
250
$6.20
$1,550.00
$8.80
$2,200.00
$8.50
$2,125.00
$9.70
$2,425.00
6
18" RCP Storm Sewer, Class V
LF
64
$32.00
$2,048.00
$49.50
$3,168.00
$40.00
$2,560.00
$42.50
$2,720.00
7
18" RCP Apron w/Trash Guard
EA
2
$802.00
$1,604.00
$1,210.00
$2,420.00
$900.00
$1,800.00
$1,245.00
$2,490.00
8
Subgrade Preparation
RD STA.
28
$305.00
$8,540.00
$115.00
$3,220.00
$150.00
$4,200.00
$115.00
$3,220.00
9
Geotextile Fabric, Type V (P)
SY
3,730
$1.00
$3,730.00
$2.20
$8,206.00
$1.50
$5,595.00
$0.85
$3,170.50
10
Select Granular Borrow (CV)
CY
500
$4.40
$2,200.00
$9.80
$4,900.00
$17.00
$8,500.00
$21.25
$10,625.00
11
Aggregate Base, Class 5 (CV) (P)
CY
740
$30.50
$22,570.00
$19.00
$14,060.00
$27.36
$20,246.40
$32.00
$23,680.00
12
Bituminous Wear Type LV WE45030B Mixture
T
560
$77.29
$43,282.40
$62.60
$35,056.00
$61.70
$34,552.00
$66.00
$36,960.00
13
Erosion Control Blanket - Category 2
SY
1,200
$1.60
$1,920.00
$1.80
$2,160.00
$1.15
$1,380.00
$1.65
$1,980.00
14
Seeding
ACRE
1.4
$321.00
$449.40
$1,350.00
$1,890.00
$2,000.00
$2,800.00
$330.00
$462.00
15
Seed Mixture - Type 240
LBS
110
$2.50
$275.00
$4.00
$440.00
$2.10
$231.00
$2.60
$286.00
16
Fertilizer
LBS
560
$0.37
$207.20
$0.75
$420.00
$0.50
$280.00
$0.40
$224.00
17
Silt Fence
LF
1,800
$1.35
$2,430.00
$2.25
$4,050.00
$2.25
$4,050.00
$2.20
$3,960.00
18
Mn/DOT Type 6 Hydraulic Siol Stabilizer
T
2.8
$909.50
$2,546.60
$400.00
$1,120.00
$1,100.00
$3,080.00
$936.00
$2,620.80
19
Bioroll
LF
400
$4.28
$1,712.00
$5.00
$2,000.00
$3.00
$1,200.00
$4.40
$1,760.00
20
Riprap Class III
CY
8
$55.00
$440.00
$90.00
$720.00
$100.00
$800.00
$137.00
$1,096.00
TOTAL BID
® °-
Sil�
$106,575.00
$110,999.40
$113,019.30
\\Sp3020- \1\projects \KO\L\Linol \030503 \Regional Trail\tbidtab Regional Trail Bid 031507.xls]bidtab
Bid Op.March 15, 2007
Jay Bros. Inc.
P.O. Box 700 (9218 Lake Dr.)
Forest Lake, MN 55025
Tele. 651.464.6400
Fax. 651.464.1704
T.A. Schifsky & Sons Inc.
2370 E. Highway 36
No. St. Paul, MN 55109
Tele. 651.777.1313
Fax. 651.777.7843
SHORT ELLIO'IDRICKSON INC.
Peterson Companies Inc.
8326 Woming Trail
Chisago City, MN 55013
Tele. 651.257.6864
Fax. 651.257.3393
Hardrives Inc.
14475 quiram Drive
Rogers, MN 55374 -9461
Tele. 763.428.8886
Fax. 763.428.8868
3E 2 OF 5
Bid Tabulation
Lino Lakes, Minnesota
Regional Trail
SEH No. A- LINOL0305.03
SEH
8 9
Forest Lake Contracting, Inc. Northwest Asphalt
$114,317.20 $118,034.80
10
North Valley, Inc.
$124,075.90
11
Olson's Excavating Service, Inc
$1,196,390.45
NO. ITEM DESCRIPTION I UNIT I
QUANTITY I
UNIT PRICE I TOTAL COST)
UNIT PRICE TOTAL COST
UNIT PRICE I TOTAL COST
UNIT PRICE I TOTAL COST
Trail Improvements
1
Mobilization
LS
1
$7,500.00
$7,500.00
$4,920.00
$4,920.00
$8,500.00
$8,500.00
$4,559.75
$4,559.75
2
Clearing
EA
10
$50.00
$500.00
$265.00
$2,650.00
$262.50
$2,625.00
$235.30
$2,353.00
3
Grubbing
EA
55
$50.00
$2,750.00
$45.00
$2,475.00
$42.00
$2,310.00
$35.30
$1,941.50
4
Common Excavation (P)
CY
1,200
$11.00
$13,200.00
$9.75
$11,700.00
$11.03
$13,236.00
$705.00
�fo
5
Muck Excavation
CY
250
$14.00
$3,500.00
$14.40
$3,600.00
$11.03
$2,757.50
$5.67
$1,417.50
6
18" RCP Storm Sewer, Class V
LF
64
$35.00
$2,240.00
$38.00
$2,432.00
$42.00
$2,688.00
$51.25
$3,280.00
7
18" RCP Apron w/Trash Guard
EA
2
$1,100.00
$2,200.00
$950.00
$1,900.00
$1,312.00
$2,624.00
$1,250.00
$2,500.00
8
Subgrade Preparation
RD STA.
28
$100.00
$2,800.00
$80.00
$2,240.00
$89.25
$2,499.00
$292.01
$8,176.28
9
Geotextile Fabric, Type V (P)
SY
3,730
$2.00
$7,460.00
$1.10
$1.84
$6,863.20
$1.15
$4,289.50
10
Select Granular Borrow (CV)
CY
500
$11.00
$5,500.00
$17.35
$8,675.00
$16.80
$8,400.00
$19.09
$9,545.00
11
Aggregate Base, Class 5 (CV) (P)
CY
740
$25.00
$18,500.00
$35.82
$26,506.80
$32.91
$24,353.40
$25.30
$18,722.00
12
Bituminous Wear Type LV WE45030B Mixture
T
560
$61.70
$34,552.00
$66.60
$37,296.00
$63.85
$35,756.00
$73.95
$41,412.00
13
Erosion Control Blanket - Category 2
SY
1,200
$2.00
$2,400.00
$1.15
$1,380.00
$1.56
$1,872.00
$195.00,
"+
14
Seeding
ACRE
1.4
$1,300.00
$1,820.00
$320.00
$448.00
$315.00
$441.00
$1,117.65
$1,564.71
15
Seed Mixture - Type 240
LBS
110
$4.00
$440.00
$2.30
$253.00
$2.46
$270.60
$4.71
$518.10
16
Fertilizer
LBS
560
$1.00
$560.00
$0.20
$112.00
$0.37
$207.20
$0.71
$397.60
17
Silt Fence
LF
1,800
$3.00
$5,400.00
$1.20
$2,160.00
$2.10
$3,780.00
$2.35
$4,230.00
18
Mn/DOT Type 6 Hydraulic Siol Stabilizer
T
2.8
$384.00
$1,075.20
$830.00
$2,324.00
$892.50
$2,499.00
$3,176.74
$8,894.87
19
Bioroll
LF
400
$3.20
$1,280.00
$5.15
$2,060.00
$4.20
$1,680.00
$4.71
$1,884.00
20
Riprap Class 111
CY
8
$80.00
$640.00
$100.00
$800.00
$89.25
$714.00
$88.08
$704.64
TOTAL BID
$114,317.20
,; +� � !
$124,075.90
\ \Sp3020 -1\ projects \KO \LLLinol\030503 \Regional TraiNbidtab Regional Trail Bid 031507.xls]bidtab
Bid OpeibMarch 15, 2007
Forest Lake Contracting, Inc.
14777 Lake Dr.
Forest Lake, MN 55025
Tele. 651.464.4500
Fax. 651.464.4722
Northwest Asphalt
1451 Stagecoach Rd.
Shakopee, MN 55379
Tele. 952.445.1003
Fax. 952.445.1056
SHORT ELLIO1\1DRICKSON INC.
North Valley, Inc.
20015 Iguana St. NW
Nowthen, MN 55330
Tele. 763.274.2580
Fax. 763.274.2584
Olson's Excavating Service, Inc
17638 Lyons St. NE
Forest Lake, MN 55025
Tele. 651.464.2082
Fax. 651.464.9029
3E 3 OF 5
Tabulation
Lino Lakes, Minnesota SEH
Regional Trail
SEH No. A- LINOL0305.03
12
Gustafson Excavating, Inc.
$130,991.00
13
Barber Const., Inc.
$142,630.00
14 15
Midwest Asphalt Corporation Sunram Construction, Inc.
$144,968.90 $155,946.00
NO. IITEM DESCRIPTION I UNIT I QUANTITY
UNIT PRICE I TOTAL COST I
UNIT PRICE I TOTAL COST
UNIT PRICE I TOTAL COST
UNIT PRICE I TOTAL COST
Trail Improvements
1
Mobilization
LS
1
$8,000.00
$8,000.00
$6,000.00
$6,000.00
$10,250.00
$10,250.00
$4,600.00
$4,600.00
2
Clearing
EA
10
$200.00
$2,000.00
$250.00
$2,500.00
$283.00
$2,830.00
$240.00
$2,400.00
3
Grubbing
EA
55
$100.00
$5,500.00
$200.00
$11,000.00
$45.00
$2,475.00
$230.00
$12,650.00
4
Common Excavation (P)
CY
1,200
$9.50
$11,400.00
$10.00
$12,000.00
$15.85
$19,020.00
$18.00
$21,600.00
5
Muck Excavation
CY
250
$15.00
$3,750.00
$10.00
$2,500.00
$25.00
$6,250.00
$21.30
$5,325.00
6
18" RCP Storm Sewer, Class V
LF
64
$28.00
$1,792.00
$140.00
$8,960.00
$49.75
$3,184.00
$51.75
$3,312.00
7
18" RCP Apron w/Trash Guard
EA
2
$850.00
$1,700.00
$800.00
$1,600.00
$1,470.00
$2,940.00
$1,400.00
$2,800.00
8
Subgrade Preparation
RD STA.
28
$200.00
$5,600.00
$10.00
$280.00
$65.30
$1,828.40
$481.00
$13,468.00
9
Geotextile Fabric, Type V (P)
SY
3,730
$2.20
$8,206.00
$2.00
$7,460.00
$1.70
$6,341.00
$1.42
$5,296.60
10
Select Granular Borrow (CV)
CY
500
$16.00
$8,000.00
$10.00
$5,000.00
$28.55
$14,275.00
$22.44
$11,220.00
11
Aggregate Base, Class 5 (CV) (P)
CY
740
$24.05
$17,797.00
$32.00
$23,680.00
$33.65
$24,901.00
$34.44
$25,485.60
12
Bituminous Wear Type LV WE45030B Mixture
T
560
$68.60
$38,416.00
$70.00
$39,200.00
$68.60
$38,416.00
$64.80
$36,288.00
13
Erosion Control Blanket - Category 2
SY
1,200
$1.80
$2,160.00
$3.00
$3,600.00
$2.05
$2,460.00
$1.58
$1,896.00
14
Seeding
ACRE
1.4
$950.00
$1,330.00
$1,500.00
$2,100.00
$735.00
$1,029.00
$315.00
$441.00
15
Seed Mixture - Type 240
LBS
110
$2.00
$220.00
$5.00
$550.00
$2.85
$313.50
$2.46
$270.60
16
Fertilizer
LBS
560
$1.50
$840.00
$5.00
$2,800.00
$0.45
$252.00
$0.37
$207.20
17
Silt Fence
LF
1,800
$2.10
$3,780.00
$3.00
$5,400.00
$1.70
$3,060.00
$2.10
$3,780.00
18
Mn/DOT Type 6 Hydraulic Siol Stabilizer
T
2.8
$950.00
$2,660.00
$1,000.00
$2,800.00
$1,130.00
$3,164.00
$895.00
$2,506.00
19
Bioroll
LF
400
$18.00
$7,200.00
$10.00
$4,000.00
$2.45
$980.00
$4.20
$1,680.00
20
Riprap Class III
CY
8
$80.00
$640.00
$150.00
$1,200.00
$125.00
$1,000.00
$90.00
$720.00
TOTAL BID
$130,991.00
$142,630.00
$144,968.90
$155,946.00
\\Sp3020 -1\ projects \KO \L\Lino1\030503 \Regional Trail\tbidtab Regional Trail Bid 031507.xls]bidtab
Bid Opt vlarch 15, 2007
Gustafson Excavating, Inc.
6610 410th St.
North Branch, MN 55056
Tele. 651.674.7430
Fax. 651.674.2106
Barber Const., Inc.
635 14th Ave. S. (P.O. Box 5324)
Hopkins, MN 55343
Tele. 952.938.9607
Fax. 952.938.9658
SHORT ELLIO.DRICKSON INC.
Midwest Asphalt Corporation
P.O. Box 5477
Hopkins, MN 55343
Tele. 952.937.8033
Fax. 952.937.6910
Sunram Construction, Inc.
20010 75th Avenue North
Corcoran, MN 55340
Tele. 763.420.2140
Fax. 763.494.3951
411,E4OF5
Bid Tabulation j
*Lino Lakes, Minnesota SEH
Regional Trail
SEH No. A- LINOL0305.03
16
American Tank Services, Inc
$166,951.42
NO.
ITEM DESCRIPTION I UNIT I QUANTITY
UNIT PRICE I TOTAL COST I
Trail Improvements
1
Mobilization
LS
1
$13,250.00
$13,250.00
2
Clearing
EA
10
$617.40
$6,174.00
3
Grubbing
EA
55
$84.00
$4,620.00
4
Common Excavation (P)
CY
1,200
$7.50
$9,000.00
5
Muck Excavation
CY
250
$10.50
$2,625.00
6
18" RCP Storm Sewer, Class V
LF
64
$52.26
$3,344.64
7
18" RCP Apron w/Trash Guard
EA
2
$1,521.31
$3,042.62
8
Subgrade Preparation
RD STA.
28
$700.00
$19,600.00
9
Geotextile Fabric, Type V (P)
SY
3,730
$1.37
$5,110.10
10
Select Granular Borrow (CV)
CY
500
$20.00
$10,000.00
11
Aggregate Base, Class 5 (CV) (P)
CY
740
$46.10
$34,114.00
12
Bituminous Wear Type LV WE450306 Mixture
T
560
$75.50
$42,280.00
13
Erosion Control Blanket - Category 2
SY
1,200
$1.73
$2,076.00
14
Seeding
ACRE
1.4
$1,680.00
$2,352.00
15
Seed Mixture - Type 240
LBS
110
$3.26
$358.60
16
Fertilizer
LBS
560
$1.58
$884.80
17
Silt Fence
LF
1,800
$1.47
$2,646.00
18
Mn/DOT Type 6 Hydraulic Siol Stabilizer
T
2.8
$1,143.45
$3,201.66
19
Bioroll
LF
400
$3.68
$1,472.00
20
Riprap Class III
CY
8
$100.00
$800.00
TOTAL BID
$166,951.42
\\Sp3020- 1\projects\KO\L\Lino1\030503 \Regional Trail\Ibidtab Regional Trail Bid 031507.xls]bidtab
Bid Oprlarch 15, 2007
American Tank Services, Inc
3174 Ryan Lane
Little Canada, MN 55117
Tele. 651.481.7939
Fax. 651.481.7992
SHORT ELLIO1 4DRICKSON INC. 1111E 5 OF 5