Loading...
HomeMy WebLinkAbout2007-047 Council Resolution• • Council Member o' Donnelintroduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 07 -47 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT LINO LAKES REGIONAL TRAIL IMPROVEMENTS WHEREAS, pursuant to an advertisement for bids for the construction of the Lino Lakes Regional Trail Improvement project, bids were received March 15, 2007, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Total Bid 1 W.B. Miller Inc. $99,585.15 2 Rum River Contracting Co. $102,906.98 3 North Pine Aggregate, Inc. $103,276.00 4 Jay Bros. Inc. $105,999.60 5 T.A. Schifsky & Sons Inc. $106,575.00 6 Peterson Companies, Inc. $110,999.40 7 Hard rives Inc. $113,019.30 8 Forest Lake Contracting, Inc. $114,317.20 9 Northwest Asphalt $118,034.80 10 North Valley, Inc. $124,075.90 11 Gustafason Excavating, Inc. $130,991.00 12 Barber Const., Inc. $142,630.00 13 Midwest Asphalt Corporation $144,968.90 14 Sunram Construction Inc. $155,946.00 15 American Tank Services, Inc. $166,951.42 16 Olson's Excavating Service, Inc. $1,196,390.45 AND WHEREAS, it appears that W.B. Miller of EIk River, Minnesota is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with W.B. Miller of EIk River, Minnesota in the name of the City of Lino Lakes for the construction of the Lino Lakes Regional Trail Improvements Project in the amount of $99,585.15, according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. • Julianne Bartell, City clerk Adopted by the Lino Lakes City Council this 26th day of March, 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Reinert and upon vote being taken thereon, the following voted in favor thereof: O'Donnell, Reinert, Stoltz, Carlson, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6A Michael Grochala, March 26, 2007 Consideration of Resolution No. 07 -47, Accepting Bids and Awarding Contract, Lino Lakes Regional Trail Improvements VOTE REQUIRED: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on March 15, 2007 for the proposed Lino Lakes Regional Trail improvement project. A total of sixteen (16) bids were received. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Total Bid 1 W.B. Miller Inc. $99,585.15 2 Rum River Contracting Co. $102,906.98 3 North Pine Aggregate, Inc. $103,276.00 4 Jay Bros. Inc. $105,999.60 5 T.A. Schifsky & Sons Inc. $106,575.00 6 Peterson Companies, Inc. $110,999.40 7 Hardrives Inc. $113,019.30 8 Forest Lake Contracting, Inc. $114,317.20 9 Northwest Asphalt $118,034.80 10 North Valley, Inc. $124,075.90 11 Gustafason Excavating, Inc. $130,991.00 12 Barber Const., Inc. $142,630.00 13 Midwest Asphalt Corporation $144,968.90 14 Sunram Construction Inc. $155,946.00 15 American Tank Services, Inc. $166,951.42 16 Olson's Excavating Service, Inc. $1,196,390.45 The low bid received was submitted by W.B. Miller of Elk River, Minnesota in the amount of $99,585.15. The engineers estimate for the project was $185,446.00. A copy of the consulting engineer's recommendation and the complete bid tabulation are attached. • RECOMMENDATION: Staff recommends adoption of Resolution No. 07 -47 awarding the contract to W.B. Miller. ATTACHMENTS 1. Resolution No. 07-47 2. Engineers Recommendation 3. Bid Tabulation • • SEH • • March 15, 2207 Honorable Mayor and City Council City of Lino Lakes 600 Town Center Parkway Lino Lakes, MN 55014 -1182 Attn: Michael Grochala, Community Development Director Dear Mayor and Council Members: RE: Lino Lakes, Minnesota Lino Lakes Regional Trail SEH Project No. A- LINOL0305.03 6.00 On Thursday, March 15, 2007, at 10:00 a.m., sixteen bids were received for the referenced project. Please find enclosed the bid tabulation detailing the results for the 3 lowest bids. The bid results are summarized below. Contractor Total Bid 1 W.B. Miller Inc. $ 99,585.15 2 Rum River Contracting Co. $ 102,906.98 3 North Pine Aggregate, Inc $ 103,276.00 Engineer's Estimate $ 185,446.00 The low bid received was submitted by W.B. Miller, Inc., of Elk River in the amount of $99,585.15. In reliance on our experience with W.B. Miller and/or materials and information provided by the contractor, we have determined that 1) they have a sufficient understanding of the project and equipment to perform the construction for which it bid; and 2) according to their bonding agent they presently have the financial ability to complete the project bid. SEH makes no representation or warranty as to the actual financial viability of the contractor or its ability to complete its work. Accordingly, we recommend the project be awarded to W.B. Miller in the amount of $99,585.15, contingent upon the City's receipt of all permits and easements if all permits and easements have not been obtained at the time of award. Sincerely, g- 7 Anthony J. Kutzke, EIT Project Engineer Enclosure nm s:AkoA1 \lino1V030503\regional trail\recawardltr.doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110 -5196 SEH is an equal opportunity employer 1 www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax Bid Tabulation Lino Lakes, Minnesota SEH Regional Trail SEH No. A- LINOL0305.03 Engineer's Estimate $185,446.00 1 W.B. Miller Inc. $99,585.15 2 Rum River Contracting Co. $102,906.98 3 North Pine Aggregate, Inc $103,276.00 NO. IITEM DESCRIPTION I UNIT 1 QUANTITY UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST Trail Improvements $8,000.00 $250.00 $250.00 $12.00 $15.00 $50.00 $1,500.00 $250.00 $3.00 $22.00 $30.00 $125.00 $2.00 $300.00 $20.00 1 Mobilization LS 1 $8,000.00 $4,742.15 $4,742.15 $6,000.00 $6,000.00 $5,000.00 $5,000.00 2 Clearing EA 10 $2,500.00 $250.00 $2,500.00 $250.00 $2,500.00 $270.00 $2,700.00 3 Grubbing EA 55 $13,750.00 $55.00 $3,025.00 $40.00 $2,200.00 $43.50 $2,392.50 4 Common Excavation (P) CY 1,200 $14,400.00 $5.60 $6,720.00 $1.87 $2,244.00 $9.55 $11,460.00 5 Muck Excavation CY 250 $3,750.00 $8.00 $2,000.00 $8.54 $2,135.00 $8.65 $2,162.50 6 18" RCP Storm Sewer, Class V LF 64 $3,200.00 $55.00 $3,520.00 $38.51 $2,464.64 $43.00 $2,752.00 7 18" RCP Apron w/Trash Guard EA 2 $3,000.00 $1,135.00 $2,270.00 $1,130.52 $2,261.04 $1,005.00 $2,010.00 8 Subgrade Preparation RD STA. 28 $7,000.00 $150.00 $4,200.00 $105.00 $2,940.00 $85.00 $2,380.00 9 Geotextile Fabric, Type V (P) SY 3,730 $11,190.00 $0.80 $2,984.00 $0.75 $2,797.50 $1.20 $4,476.00 10 Select Granular Borrow (CV) CY 500 $11,000.00 $9.00 $4,500.00 $19.25 $9,625.00 $10.00 $5,000.00 11 Aggregate Base, Class 5 (CV) (P) CY 740 $22,200.00 $24.10 $17,834.00 $29.67 $21,955.80 $17.50 $12,950.00 12 Bituminous Wear Type LV WE45030B Mixture T 560 $70,000.00 $61.30 $34,328.00 $63.50 $35,560.00 $69.50 $38,920.00 13 Erosion Control Blanket - Category 2 SY 1,200 $2,400.00 $1.50 $1,800.00 $1.20 $1,440.00 $1.25 $1,500.00 14 Seeding ACRE 1.4 $420.00 $500.00 $700.00 $200.00 $280.00 $335.00 $469.00 15 Seed Mixture - Type 240 LBS 110 $2,200.00 $2.20 $242.00 $2.60 $286.00 $2.40 $264.00 16 Fertilizer LBS 560 $1.10 $2.50 $616.00 $0.50 $280.00 $0.55 $308.00 $0.25 $140.00 17 Silt Fence LF 1,800 $4,500.00 $2.00 $3,600.00 $1.15 $2,070.00 $1.85 $3,330.00 18 Mn/DOT Type 6 Hydraulic Siol Stabilizer T 2.8 $1,300.00 $3,640.00 $950.00 $2,660.00 $1,200.00 $3,360.00 $875.00 $2,450.00 19 Bioroll LF 400 $3.00 $1,200.00 $2.50 $1,000.00 $3.70 $1,480.00 $5.30 $2,120.00 20 Riprap Class III CY 8 $60.00 $480.00 $85.00 $680.00 $125.00 $1,000.00 $100.00 $800.00 TOTAL BID $185,446.00 $99,585.15 $102,906.98 $103,276.00 \\Sp3020 -1\ projects \KO \L\Linol\030503 \Regional Trail \[bidtab Regional Trail Bid 031507.xls]bidtab Bid Op0March 15, 2007 Engineer's Estimate W.B. Miller Inc. 6701 Norris Lake Rd. NW Elk River, MN 55330 Tele. 763.241.0397 Fax. 763.241.0580 SHORT ELLIO 'NDRICKSON INC. Rum River Contracting Co. 31913 124th St. Princeton, MN 55371 Tele. 763.389.3718 Fax. 763.389.3213 North Pine Aggregate, Inc 14551 Lake Dr. Forest Lake, MN 55025 Tele. 651.464.6802 Fax. 651.464.8456 �E 1 OF 5 Bid Tabulation Lino Lakes, Minnesota SEH Regional Trail SEH No. A- LINOL0305.03 4 Jay Bros. Inc. $105,999.60 5 T.A. Schifsky & Sons Inc. $106,575.00 6 Peterson Companies Inc. $110,999.40 7 Hard rives Inc. $113,019.30 NO. IITEM DESCRIPTION I UNIT I QUANTITY I UNIT PRICE TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST Trail Improvements 1 Mobilization LS 1 $2,100.00 $2,100.00 $5,075.00 $5,075.00 $4,000.00 $4,000.00 $10,000.00 $10,000.00 2 Clearing EA 10 $188.00 $1,880.00 $255.00 $2,550.00 $275.00 $2,750.00 $110.00 $1,100.00 3 Grubbing EA 55 $29.00 $1,595.00 $44.00 $2,420.00 $50.00 $2,750.00 $28.00 $1,540.00 4 Common Excavation (P) CY 1,200 $4.10 $8.75 $10,500.00 $6.75 $8,100.00 $2.25 $2,700.00 5 Muck Excavation CY 250 $6.20 $1,550.00 $8.80 $2,200.00 $8.50 $2,125.00 $9.70 $2,425.00 6 18" RCP Storm Sewer, Class V LF 64 $32.00 $2,048.00 $49.50 $3,168.00 $40.00 $2,560.00 $42.50 $2,720.00 7 18" RCP Apron w/Trash Guard EA 2 $802.00 $1,604.00 $1,210.00 $2,420.00 $900.00 $1,800.00 $1,245.00 $2,490.00 8 Subgrade Preparation RD STA. 28 $305.00 $8,540.00 $115.00 $3,220.00 $150.00 $4,200.00 $115.00 $3,220.00 9 Geotextile Fabric, Type V (P) SY 3,730 $1.00 $3,730.00 $2.20 $8,206.00 $1.50 $5,595.00 $0.85 $3,170.50 10 Select Granular Borrow (CV) CY 500 $4.40 $2,200.00 $9.80 $4,900.00 $17.00 $8,500.00 $21.25 $10,625.00 11 Aggregate Base, Class 5 (CV) (P) CY 740 $30.50 $22,570.00 $19.00 $14,060.00 $27.36 $20,246.40 $32.00 $23,680.00 12 Bituminous Wear Type LV WE45030B Mixture T 560 $77.29 $43,282.40 $62.60 $35,056.00 $61.70 $34,552.00 $66.00 $36,960.00 13 Erosion Control Blanket - Category 2 SY 1,200 $1.60 $1,920.00 $1.80 $2,160.00 $1.15 $1,380.00 $1.65 $1,980.00 14 Seeding ACRE 1.4 $321.00 $449.40 $1,350.00 $1,890.00 $2,000.00 $2,800.00 $330.00 $462.00 15 Seed Mixture - Type 240 LBS 110 $2.50 $275.00 $4.00 $440.00 $2.10 $231.00 $2.60 $286.00 16 Fertilizer LBS 560 $0.37 $207.20 $0.75 $420.00 $0.50 $280.00 $0.40 $224.00 17 Silt Fence LF 1,800 $1.35 $2,430.00 $2.25 $4,050.00 $2.25 $4,050.00 $2.20 $3,960.00 18 Mn/DOT Type 6 Hydraulic Siol Stabilizer T 2.8 $909.50 $2,546.60 $400.00 $1,120.00 $1,100.00 $3,080.00 $936.00 $2,620.80 19 Bioroll LF 400 $4.28 $1,712.00 $5.00 $2,000.00 $3.00 $1,200.00 $4.40 $1,760.00 20 Riprap Class III CY 8 $55.00 $440.00 $90.00 $720.00 $100.00 $800.00 $137.00 $1,096.00 TOTAL BID ® °- Sil� $106,575.00 $110,999.40 $113,019.30 \\Sp3020- \1\projects \KO\L\Linol \030503 \Regional Trail\tbidtab Regional Trail Bid 031507.xls]bidtab Bid Op.March 15, 2007 Jay Bros. Inc. P.O. Box 700 (9218 Lake Dr.) Forest Lake, MN 55025 Tele. 651.464.6400 Fax. 651.464.1704 T.A. Schifsky & Sons Inc. 2370 E. Highway 36 No. St. Paul, MN 55109 Tele. 651.777.1313 Fax. 651.777.7843 SHORT ELLIO'IDRICKSON INC. Peterson Companies Inc. 8326 Woming Trail Chisago City, MN 55013 Tele. 651.257.6864 Fax. 651.257.3393 Hardrives Inc. 14475 quiram Drive Rogers, MN 55374 -9461 Tele. 763.428.8886 Fax. 763.428.8868 3E 2 OF 5 Bid Tabulation Lino Lakes, Minnesota Regional Trail SEH No. A- LINOL0305.03 SEH 8 9 Forest Lake Contracting, Inc. Northwest Asphalt $114,317.20 $118,034.80 10 North Valley, Inc. $124,075.90 11 Olson's Excavating Service, Inc $1,196,390.45 NO. ITEM DESCRIPTION I UNIT I QUANTITY I UNIT PRICE I TOTAL COST) UNIT PRICE TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST Trail Improvements 1 Mobilization LS 1 $7,500.00 $7,500.00 $4,920.00 $4,920.00 $8,500.00 $8,500.00 $4,559.75 $4,559.75 2 Clearing EA 10 $50.00 $500.00 $265.00 $2,650.00 $262.50 $2,625.00 $235.30 $2,353.00 3 Grubbing EA 55 $50.00 $2,750.00 $45.00 $2,475.00 $42.00 $2,310.00 $35.30 $1,941.50 4 Common Excavation (P) CY 1,200 $11.00 $13,200.00 $9.75 $11,700.00 $11.03 $13,236.00 $705.00 �fo 5 Muck Excavation CY 250 $14.00 $3,500.00 $14.40 $3,600.00 $11.03 $2,757.50 $5.67 $1,417.50 6 18" RCP Storm Sewer, Class V LF 64 $35.00 $2,240.00 $38.00 $2,432.00 $42.00 $2,688.00 $51.25 $3,280.00 7 18" RCP Apron w/Trash Guard EA 2 $1,100.00 $2,200.00 $950.00 $1,900.00 $1,312.00 $2,624.00 $1,250.00 $2,500.00 8 Subgrade Preparation RD STA. 28 $100.00 $2,800.00 $80.00 $2,240.00 $89.25 $2,499.00 $292.01 $8,176.28 9 Geotextile Fabric, Type V (P) SY 3,730 $2.00 $7,460.00 $1.10 $1.84 $6,863.20 $1.15 $4,289.50 10 Select Granular Borrow (CV) CY 500 $11.00 $5,500.00 $17.35 $8,675.00 $16.80 $8,400.00 $19.09 $9,545.00 11 Aggregate Base, Class 5 (CV) (P) CY 740 $25.00 $18,500.00 $35.82 $26,506.80 $32.91 $24,353.40 $25.30 $18,722.00 12 Bituminous Wear Type LV WE45030B Mixture T 560 $61.70 $34,552.00 $66.60 $37,296.00 $63.85 $35,756.00 $73.95 $41,412.00 13 Erosion Control Blanket - Category 2 SY 1,200 $2.00 $2,400.00 $1.15 $1,380.00 $1.56 $1,872.00 $195.00, "+ 14 Seeding ACRE 1.4 $1,300.00 $1,820.00 $320.00 $448.00 $315.00 $441.00 $1,117.65 $1,564.71 15 Seed Mixture - Type 240 LBS 110 $4.00 $440.00 $2.30 $253.00 $2.46 $270.60 $4.71 $518.10 16 Fertilizer LBS 560 $1.00 $560.00 $0.20 $112.00 $0.37 $207.20 $0.71 $397.60 17 Silt Fence LF 1,800 $3.00 $5,400.00 $1.20 $2,160.00 $2.10 $3,780.00 $2.35 $4,230.00 18 Mn/DOT Type 6 Hydraulic Siol Stabilizer T 2.8 $384.00 $1,075.20 $830.00 $2,324.00 $892.50 $2,499.00 $3,176.74 $8,894.87 19 Bioroll LF 400 $3.20 $1,280.00 $5.15 $2,060.00 $4.20 $1,680.00 $4.71 $1,884.00 20 Riprap Class 111 CY 8 $80.00 $640.00 $100.00 $800.00 $89.25 $714.00 $88.08 $704.64 TOTAL BID $114,317.20 ,; +� � ! $124,075.90 \ \Sp3020 -1\ projects \KO \LLLinol\030503 \Regional TraiNbidtab Regional Trail Bid 031507.xls]bidtab Bid OpeibMarch 15, 2007 Forest Lake Contracting, Inc. 14777 Lake Dr. Forest Lake, MN 55025 Tele. 651.464.4500 Fax. 651.464.4722 Northwest Asphalt 1451 Stagecoach Rd. Shakopee, MN 55379 Tele. 952.445.1003 Fax. 952.445.1056 SHORT ELLIO1\1DRICKSON INC. North Valley, Inc. 20015 Iguana St. NW Nowthen, MN 55330 Tele. 763.274.2580 Fax. 763.274.2584 Olson's Excavating Service, Inc 17638 Lyons St. NE Forest Lake, MN 55025 Tele. 651.464.2082 Fax. 651.464.9029 3E 3 OF 5 Tabulation Lino Lakes, Minnesota SEH Regional Trail SEH No. A- LINOL0305.03 12 Gustafson Excavating, Inc. $130,991.00 13 Barber Const., Inc. $142,630.00 14 15 Midwest Asphalt Corporation Sunram Construction, Inc. $144,968.90 $155,946.00 NO. IITEM DESCRIPTION I UNIT I QUANTITY UNIT PRICE I TOTAL COST I UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST UNIT PRICE I TOTAL COST Trail Improvements 1 Mobilization LS 1 $8,000.00 $8,000.00 $6,000.00 $6,000.00 $10,250.00 $10,250.00 $4,600.00 $4,600.00 2 Clearing EA 10 $200.00 $2,000.00 $250.00 $2,500.00 $283.00 $2,830.00 $240.00 $2,400.00 3 Grubbing EA 55 $100.00 $5,500.00 $200.00 $11,000.00 $45.00 $2,475.00 $230.00 $12,650.00 4 Common Excavation (P) CY 1,200 $9.50 $11,400.00 $10.00 $12,000.00 $15.85 $19,020.00 $18.00 $21,600.00 5 Muck Excavation CY 250 $15.00 $3,750.00 $10.00 $2,500.00 $25.00 $6,250.00 $21.30 $5,325.00 6 18" RCP Storm Sewer, Class V LF 64 $28.00 $1,792.00 $140.00 $8,960.00 $49.75 $3,184.00 $51.75 $3,312.00 7 18" RCP Apron w/Trash Guard EA 2 $850.00 $1,700.00 $800.00 $1,600.00 $1,470.00 $2,940.00 $1,400.00 $2,800.00 8 Subgrade Preparation RD STA. 28 $200.00 $5,600.00 $10.00 $280.00 $65.30 $1,828.40 $481.00 $13,468.00 9 Geotextile Fabric, Type V (P) SY 3,730 $2.20 $8,206.00 $2.00 $7,460.00 $1.70 $6,341.00 $1.42 $5,296.60 10 Select Granular Borrow (CV) CY 500 $16.00 $8,000.00 $10.00 $5,000.00 $28.55 $14,275.00 $22.44 $11,220.00 11 Aggregate Base, Class 5 (CV) (P) CY 740 $24.05 $17,797.00 $32.00 $23,680.00 $33.65 $24,901.00 $34.44 $25,485.60 12 Bituminous Wear Type LV WE45030B Mixture T 560 $68.60 $38,416.00 $70.00 $39,200.00 $68.60 $38,416.00 $64.80 $36,288.00 13 Erosion Control Blanket - Category 2 SY 1,200 $1.80 $2,160.00 $3.00 $3,600.00 $2.05 $2,460.00 $1.58 $1,896.00 14 Seeding ACRE 1.4 $950.00 $1,330.00 $1,500.00 $2,100.00 $735.00 $1,029.00 $315.00 $441.00 15 Seed Mixture - Type 240 LBS 110 $2.00 $220.00 $5.00 $550.00 $2.85 $313.50 $2.46 $270.60 16 Fertilizer LBS 560 $1.50 $840.00 $5.00 $2,800.00 $0.45 $252.00 $0.37 $207.20 17 Silt Fence LF 1,800 $2.10 $3,780.00 $3.00 $5,400.00 $1.70 $3,060.00 $2.10 $3,780.00 18 Mn/DOT Type 6 Hydraulic Siol Stabilizer T 2.8 $950.00 $2,660.00 $1,000.00 $2,800.00 $1,130.00 $3,164.00 $895.00 $2,506.00 19 Bioroll LF 400 $18.00 $7,200.00 $10.00 $4,000.00 $2.45 $980.00 $4.20 $1,680.00 20 Riprap Class III CY 8 $80.00 $640.00 $150.00 $1,200.00 $125.00 $1,000.00 $90.00 $720.00 TOTAL BID $130,991.00 $142,630.00 $144,968.90 $155,946.00 \\Sp3020 -1\ projects \KO \L\Lino1\030503 \Regional Trail\tbidtab Regional Trail Bid 031507.xls]bidtab Bid Opt vlarch 15, 2007 Gustafson Excavating, Inc. 6610 410th St. North Branch, MN 55056 Tele. 651.674.7430 Fax. 651.674.2106 Barber Const., Inc. 635 14th Ave. S. (P.O. Box 5324) Hopkins, MN 55343 Tele. 952.938.9607 Fax. 952.938.9658 SHORT ELLIO.DRICKSON INC. Midwest Asphalt Corporation P.O. Box 5477 Hopkins, MN 55343 Tele. 952.937.8033 Fax. 952.937.6910 Sunram Construction, Inc. 20010 75th Avenue North Corcoran, MN 55340 Tele. 763.420.2140 Fax. 763.494.3951 411,E4OF5 Bid Tabulation j *Lino Lakes, Minnesota SEH Regional Trail SEH No. A- LINOL0305.03 16 American Tank Services, Inc $166,951.42 NO. ITEM DESCRIPTION I UNIT I QUANTITY UNIT PRICE I TOTAL COST I Trail Improvements 1 Mobilization LS 1 $13,250.00 $13,250.00 2 Clearing EA 10 $617.40 $6,174.00 3 Grubbing EA 55 $84.00 $4,620.00 4 Common Excavation (P) CY 1,200 $7.50 $9,000.00 5 Muck Excavation CY 250 $10.50 $2,625.00 6 18" RCP Storm Sewer, Class V LF 64 $52.26 $3,344.64 7 18" RCP Apron w/Trash Guard EA 2 $1,521.31 $3,042.62 8 Subgrade Preparation RD STA. 28 $700.00 $19,600.00 9 Geotextile Fabric, Type V (P) SY 3,730 $1.37 $5,110.10 10 Select Granular Borrow (CV) CY 500 $20.00 $10,000.00 11 Aggregate Base, Class 5 (CV) (P) CY 740 $46.10 $34,114.00 12 Bituminous Wear Type LV WE450306 Mixture T 560 $75.50 $42,280.00 13 Erosion Control Blanket - Category 2 SY 1,200 $1.73 $2,076.00 14 Seeding ACRE 1.4 $1,680.00 $2,352.00 15 Seed Mixture - Type 240 LBS 110 $3.26 $358.60 16 Fertilizer LBS 560 $1.58 $884.80 17 Silt Fence LF 1,800 $1.47 $2,646.00 18 Mn/DOT Type 6 Hydraulic Siol Stabilizer T 2.8 $1,143.45 $3,201.66 19 Bioroll LF 400 $3.68 $1,472.00 20 Riprap Class III CY 8 $100.00 $800.00 TOTAL BID $166,951.42 \\Sp3020- 1\projects\KO\L\Lino1\030503 \Regional Trail\Ibidtab Regional Trail Bid 031507.xls]bidtab Bid Oprlarch 15, 2007 American Tank Services, Inc 3174 Ryan Lane Little Canada, MN 55117 Tele. 651.481.7939 Fax. 651.481.7992 SHORT ELLIO1 4DRICKSON INC. 1111E 5 OF 5