HomeMy WebLinkAbout2007-051 Council Resolution• • Council Member Stoltz introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 07 -51 RESOLUTION APPROVING JOINT POWERS AGREEMENT WITH COUNTY OF ANOKA LAKE DRIVE /I -35W INTERCHANGE RECONSTRUCTION WHEREAS, Minnesota Statutes, Section 471.59, authorizes political subdivisions to enter into Joint Powers Agreements, and WHEREAS, the City of Lino Lakes and the County of Anoka agree that it is in the best interest of the traveling public to reconstruct the interchange of I -35W and County State Aid Highway 23 (Lake Drive) as soon as possible; WHEREAS, said parties mutually agree that the interchange at I -35W and County State Aid Highway 23 (Lake Drive) is in need of reconstruction; and WHEREAS, the parties agree that it is in their best interest that the cost of said the final design study be shared, NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. That the City Council hereby approves the Joint Powers Agreement with the County of Anoka for the Reconstruction of the Interchange of County State Aid Highway 23 (Lake Drive) and I -35W and authorize the Mayor and City Clerk to execute said agreement on behalf of the ity. Bartell, Cit� CIer J. Be+Keson, Mayor Adopted by the Lino Lakes City Council this 9th day of April, 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Carlson and upon vote being taken thereon, the following voted in favor thereof: Stoltz, Carlson, O'Donnell, Reinert, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. 2 • • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6A Michael Grochala April 9, 2007 Consideration of Resolution No. 07 -51 Approving Joint Powers Agreement with Anoka County for Construction - Lake Drive /I35W Interchange ACTION REQUIRED: Simple Majority BACKGROUND In addition to previous funding for preliminary and final design, Anoka County has committed to $3,700,000 for the reconstruction of the Lake Drive Interchange. The Joint Powers Agreement with Exhibit A provides for the funding in accordance with the terms set forth in the agreement. Anoka County's total participation in the project, including design, is $4,069,148.00 With the execution of the agreement, all the agency funding will be in place for the project. The total estimated project cost, including engineering, land acquisition and contingency is $10,349,000. Funding for the project is as follows: City of Lino Lakes Anoka County State of Minnesota $5,303,842 $4,069,148 $ 976,000 Letting for the project is currently scheduled for April 26. Construction is anticipated to start in mid May. RECOMMENDATION Staff is recommending approval of the JPA with Anoka County. ATTACHMENTS 1. Resolution No. 07 -51 2. Joint Powers Agreement (Including Exhibit A) • • • Anoka County Contract No. JOINT POWERS AGREEMENT FOR THE RECONSTRUCTION OF COUNTY STATE AID HIGHWAY 23 (LAKE DRIVE) AND I- 35W INTERCHANGE COUNTY PROJECT NO. S.A.P. 02- 623 -13 CITY PROJECT NO. S.A.P. 210 - 020 -04 THIS AGREEMENT is made and entered into this day of 2007, by and between the County of Anoka, a political subdivision of the State of Minnesota, 2100 Third Avenue, Anoka, Minnesota 55303, hereinafter referred to as "County ", and the City of Lino Lakes, 600 Town Center Parkway, Lino Lakes, Minnesota 55014, hereinafter referred to as the "City ". WITNESSETH WHEREAS, the parties to this agreement agree it is in the best interest of the traveling public to reconstruct the Interchange of I -35W and County State Aid Highway 23 (Lake Drive); and, WHEREAS, said parties mutually agree that the interchange at I -35W and County State Aid Highway 23 (Lake Drive) is in need of reconstruction; and, WHEREAS, Anoka County has jurisdiction over County State Aid Highway 23 (Lake Drive.); and, WHEREAS, the Minnesota Department of Transportation (MnDOT) has jurisdiction over I -35W; and, WHEREAS, the parties have entered into a separate agreement for interchange study, preliminary design and project memorandum (Anoka County Contract No. 2005 -0528) and final design and right of way acquisition (Anoka County Contract No. 2005- 0537); and, WHEREAS, the parties have entered into agreement No. 90500M with MnDOT for signal maintenance at the I -3 5 W ramp termini; and, WHEREAS, the parties agree that it is in their best interest that the cost of said reconstruction be shared; and, WHEREAS, Minn. Stat. § 471.59 authorizes political subdivisions of the state to enter into joint powers agreements for the joint exercise of powers common to each. NOW, THEREFORE, IT IS MUTUALLY STIPULATED AND AGREED: 1 • • • I. PURPOSE The parties have joined together for the purpose of the reconstruction of the interchange of I -35W and County State Aid Highway 23 (Lake Drive) including the bridge over I -35W, herein known as the Project The County project number for the reconstruction is S.A.P. 02 -623- 13. The City Project No. is S.A.P. 210 - 020 -04. Said engineering plans will be filed in the office of the Anoka County Highway Department and incorporated herein by reference. II. METHOD A. Construction The City shall provide all construction- engineering services and shall cause the construction of the Project in conformance with said plans and specifications. The City shall do the calling for all bids and the acceptance of all bid proposals. III. COSTS A. The contract cost of the work, or if the work is not contracted, the cost of all labor, materials, normal engineering costs and equipment rental required to complete the work shall constitute the actual "construction costs" and shall be so referred to herein. "Estimated costs" are good faith projections of costs which will be incurred for the Project. Actual costs may vary from the estimated costs and actual costs are what the parties are responsible for. B. Participation in the cost of construction is as follows: 1. The County shall pay for the following items up to a total capped amount of $3,700,000: • Twenty -five percent (25 %) of signal systems A, B, C, and D • One hundred percent (100 %) of traffic control interconnect • One hundred percent (100 %) of Bridge No 02817 2. The City shall pay for all remaining items including the cost of the items shown above in excess of $3,700,000. 3. The City shall pay for all construction engineering costs of the project. C. The estimated construction costs for the Project is shown in the attached Exhibit A. D. Upon award of the contract, the County shall pay to the City, upon written demand by the City, ninety -five percent (95 %) of its portion of the construction cost estimated at $3,515,000.00. 2 • • • E. Upon final completion of the Project, the County's share of the construction cost will be based upon actual construction costs. The remaining five percent (5 %) of the County's portion of the construction costs shall be paid up to a total County contribution of $3,700,000.00. IV. TERM This Agreement shall continue until terminated as provided hereinafter. V. DISBURSEMENT OF FUNDS All funds disbursed by the County or City pursuant to this Agreement shall be disbursed by each entity pursuant to the method provided by law. VI. CONTRACTS AND PURCHASES All contracts let and purchases made pursuant to this Agreement shall be made by the City and County in conformance to the State laws. VII. STRICT ACCOUNTABILITY A strict accounting shall be made of all funds and report of all receipts and shall be made upon request by either party. VIII. TERMINATION This Agreement may be terminated by either party at any time, with or without cause, upon not less than thirty (30) days written notice delivered by mail or in person to the other party. If notice is delivered by mail, it shall be deemed to be received two days after mailing. Such termination shall not be effective with respect to any solicitation of bids or any purchases of services or goods, which occurred prior to such notice of termination. The County shall pay its pro rata share of costs, which the City incurred prior to such notice of termination. IX. SIGNALIZATION POWER The City shall at their sole expense, install or cause the installation of an adequate electrical power source to the service cabinets for Signal Systems A, B, C, and D, including any necessary extension of power lines. The City shall be the lead agency in this matter. Upon completion of said traffic control signal installation, the ongoing cost of the electrical power to the signal shall be the sole cost and expense of the City. X. MAINTENANCE A. Maintenance of the completed watermain, sanitary sewer, storm sewer, detention basins (including ponds and their outlet structures and grit chambers /collectors) shall be the sole obligation of the City. 3 • B. the sole responsibility Maintenanof the City. ce of all trails and sidewalks, including snow plowing, shall be C. Maintenance of streetlights and cost of electrical power to the streetlights shall be the sole obligation of the City. D. Maintenance of the completed signal and signal equipment shall be per MnDOT agreement 90500M and the following:. E. The County shall maintain the traffic signal controller, traffic signal and pedestrian indications, loop detectors and associated wiring of the said traffic control signal at the sole obligation of the County. F. Painting of the traffic signal shall be the sole obligation of the County. Any variation of painting color standards will be billed to the City. G. Timing of the traffic signal shall be determined by the County. H. Only the County shall have access to the controller cabinet. I. The traffic control signal shall be the property of the County. • J. The City shall be responsible for maintenance of the luminaries, luminaire relamping, and luminaire painting. • K. All maintenance of the EVP System shall be completed by the County. The City shall be billed by the County on a quarterly basis for all incurred costs for maintenance of EVP system on signal systems A and D. L. EVP Emitter Units may be installed on and used only by Emergency Vehicles responding to an emergency as defined in Minnesota Statutes §169.01, Subdivision 5, and § 169.03. The City shall provide a list to the County Engineer, or the County's duly appointed representative, of all such vehicles with emitter units on an annual basis. County. M. Malfunctions of the EVP System shall be immediately reported to the N. All timing of said EVP System shall be determined by the County. O. In the event said EVP System or components are, in the opinion of the County, being misused, or the conditions set forth are violated, and such misuse or violation continues after receipt by the City, written notice thereof from the County, the County shall remove the EVP System. Upon removal of the EVP System pursuant to this paragraph, the field wiring, cabinet wiring, detector receiver, infrared detector heads and indicator lamps and all other components shall become the property of the County. 4 • • • IX. NOTICE For purposes of delivery of any notices herein, the notice shall be effective if delivered to the County Administrator of Anoka County, 2100 Third Avenue, Anoka, Minnesota 55303, on behalf of the County, and to the City Administrator of Lino Lakes, 600 Town Center Pkwy, Lino Lakes, MN 55014, on behalf of the City. X. INDEMNIFICATION The City and County mutually agree to indemnify and hold harmless each other from any claims, losses, costs, expenses or damages resulting from the acts or omissions of the respective officers, agents, or employees relating to activities conducted by either party under this Agreement. XI. ENTIRE AGREEMENT REQUIREMENT OF A WRITING It is understood and agreed that the entire agreement of the parties is contained herein and that this Agreement supersedes all oral agreements and all negotiations between the parties relating to the subject matter thereof, as well as any previous agreement presently in effect between the parties to the subject matter thereof. Any alterations, variations, or modifications of the provisions of this Agreement shall be valid only when they have been reduced to writing and duly signed by the parties. 5 • IN WITNESS WHEREOF, the parties to this Agreement have hereunto set their hands on • • the dates written below. COUNTY OF ANOKA CITY OF LINO LAKES By: By: Dennis D. Berg, Chair John Bergeson County Board of Commissioners Mayor Dated: Dated: ATTEST By: By: Terry L. Johnson Gordon Heitke County Administrator City Administrator Dated: Dated: RECOMMENDED FOR APPROVAL By: By: Douglas W. Fischer, P.E. Michael Grochala County Engineer Community Development Director Dated: Dated: APPROVED AS TO FORM By: By: Dan Klint Assistant County Attorney Its: City Attorney Dated: Dated: 6 • EXHT A CSAH 23 (Lake Drive) and 1 -3 terchange Reconstruction. SAP 02- 623 -13 d 210- 020 -04 • ITEM NO. ITEM UNIT UNIT PRICE TOTAL ESTIMATED QUANTITY TOTAL ESTIMATED COST CITY OF LINO LAKES S.A.P. 210 -020 -04 ANOKA COUNTY S.A.P. 02- 623 -13 STORM ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST 2021.501 MOBILIZATION LUMP SUM $30,000 1 $30,000 1 $30,000 2031.503 FIELD OFFICE TYPE DX EACH 310,000 1 510,000 1 510,000 2101.501 CLEARING ACRE 51,500 1.47 $2,205 1.47 $2,205 2101.502 CLEARING TREE 5100 69 $6,900 69 36,900 2101.506 GRUBBING ACRE 51,700 1.47 $2,499 1.47 $2,499 2101.507 GRUBBING TREE 5100 69 $6,900 69 $6,900 2102.502 PAVEMENT MARKING REMOVAL LIN FT $0.80 6500 $5,200 6500 $5,200 2103.501 BUILDING REMOVAL A LUMP SUM $20,000.00 1 520,000 1 $20,000 2103.501 BUILDING REMOVAL B LUMP SUM $3,000.00 1 53,000 1 $3,000 2103.505 DISCONNECT SEWER SERVICE EACH 5410.00 1 5410 1 $410 2103.507 DISCONNECT WATER SERVICE EACH $600.00 1 $600 1 $600 2104.501 REMOVE CONCRETE FLUME LIN FT $8.00 10 380 10 $80 2104.501 REMOVE INTEGRANT CURB LIN FT $5.50 3907 321,489 3907 $21,489 2104.501 REMOVE BITUMINOUS CURB - LIN FT $5.50 190 $1,045 190 $1,045 2104.501 REMOVE CURB AND GUTTER LIN FT $2.00 1027 $2,054 1027 $2,054 2104.501 REMOVE METAL CULVERT LIN FT 55.00 362 $1,810 362 $1,810 2104.501 REMOVE CHAIN LINK FENCE LIN FT $3.25 1431 $4,651 1431 $4,651 2104.501 REMOVE GUARD RAIL- PLATE BEAM LIN FT $2.00 895 $1,790 895 $1,790 2104.501 REMOVE ARMORED CABLE LIN FT $2.00 3270 $6,540 3270 $6,540 2104.501 REMOVE WATER SERVICE PIPE LIN FT $7.00 45 $315 45 $315 2104.501 REMOVE CONDUIT LIN FT $2.00 450 $900 450 $900 2104.503 REMOVE CONCRETE WALK SQ FT $0.50 2690 51,345 2690 $1,345 2104.503 REMOVE BITUMINOUS PAVEMENT SQ FT 30.25 73064 $18,266 73064 $18,266 2104.503 REMOVE PAVEMENT SQ FT $0.70 103770 $72,639 103770 $72,639 2104.509 REMOVE SEPTIC TANK EACH $950.00 1 3950 1 5950 2104.509 REMOVE LIGHTING UNIT EACH $350.00 4 $1,400 4 51,400 2104.509 REMOVE EQUIPMENT PAD EACH $250.00 1 5250 1 $250 2104.509 REMOVE HANDHOLE EACH 3200.00 2 $400 2 5400 2104.509 REMOVE LIGHT STANDARD BASE EACH $300.00 4 $1,200 4 $1,200 2104.509 REMOVE DELINEATOR EACH $20.00 1 $20 1 $20 2104.509 REMOVE MARKER EACH $20.00 1 $20 1 $20 2104.509 REMOVE SIGN TYPE C EACH $25.00 10 $250 10 5250 2104.509 REMOVE SIGN TYPE D EACH $40.00 8 5320 8 5320 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 36.00 106 $636 106 $636 2104.513 SAWING BIT PAVEMENT (FULL DEPTH) LIN FT $3.00 528 $1,584 528 $1,584 2104.523 SALVAGE SIGN TYPE C EACH $35.00 42 $1,470 42 $1,470 2104.523 SALVAGE SIGN TYPE SPECIAL EACH $50.00 2 $100 2 $100 2104.523 SALVAGE SERVICE CABINET EACH $300.00 1 3300 1 $300 2104.525 ABANDON WELL EACH $900.00 1 $900 1 $900 2104.601 HAUL SALVAGED MATERIAL LUMP SUM 52,000 1 $2,000 1 $2,000 2105.501 COMMON EXCAVATION CU YD $3.50 33822 $118,377 33822 3118,377 2105.507 SUBGRADE EXCAVATION CU YD $4.00 11640 $46,560 11640 346,560 2105.522 SELECT GRANULAR BORROW (CV) CU YD 37.00 15938 5111,566 15938 3111,566 2211.503 AGGREGATE BASE (CV) CLASS 5 CU YD 315.00 10930 $163,950 10930 3183,950 2211.503 AGGREGATE SHOULDERING (CV) CLASS 5 CU YD 515.00 68 3985 66 5985 2301.553 BRIDGE APPROACH PANELS SQ YD $120.00 1371 $164,520 1371 $164,520 2350.501 TYPE LV 3 WEARING COURSE MIXTURE (B) TON $50.00 261 $13,069 281 $13,089 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON $1.00 5466 $5,466 5466 $5,466 2360.501 TYPE SP 12.5 WEARING COURSE MIX (4,F) TON $45.00 8248 $371,181 8248 $371,181 2360.502 TYPE SP 12.5 NON WEAR COURSE MIX (4,C) TON $45.00 5397 3242,846 5397 $242,846 2411.501 STRUCTURAL CONCRETE (3Y46) CU YD 3300.00 3 $900 3 5900 2411.541 REINFORCEMENT BARS POUND $1.00 850 5850 850 3850 2411.618 MODULAR BLOCK RETAINING WALL SQ FT 525.52 1134 $28,940 1134 528,940 2412.511 6x6 PRECAST CONCRETE BOX CULVERT LIN FT $400.00 64 $25,600 64 $25,600 2412.512 6x6 PRECAST CONCRETE BOX CULVERT END SECTION EACH $6,000.00 2 $12,000 2 $12,000 2451.501 STRUCTURE EXCAVATION CLASS U CU YD $10.00 685 $6,850 685 $6,850 2501.515 12" RC PIPE APRON EACH $450.00 1 $450 1 $450 2501.515 18" RC PIPE APRON EACH $550.00 3 $1,650 3 $1,650 2501.515 24" RC PIPE APRON EACH $675.00 2 $1,350 2 $1,350 Z: \WORD \Projects \Lake Drive & 35W Site \Report\Exhibit A.xis Pagel • EXHit A CSAH 23 (Lake Drive) and 1 -35 terchange Reconstruction. SAP 02- 623 -13 and 210- 020 -04 • ITEM NO. ITEM UNIT UNIT PRICE TOTAL ESTIMATED QUANTITY TOTAL ESTIMATED COST CITY OF LINO LAKES S.A.P. 210 -020 -04 ANOKA COUNTY S.A.P. 02.6323 -13 STORM ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST 2501.515 30" RC PIPE APRON EACH 3800.00 1 3800 1 5800 2501.561 15" RC PIPE CULVERT DES 3006 CL V UN FT 324.00 120 32,880 120 32880 2501.561 18" RC PIPE CULVERT DES 3006 CL V LIN FT 326.00 25 $650 25 3650 2501.569 15" RC SAFETY APRON EACH $530.00 6 33,180 6 $3,180 2502.501 4" PRECAST CONCRETE HEADWALL EACH $100.00 20 32,000 20 32,000 2502.521 4" TP PIPE DRAIN LIN FT 35.00 320 31,600 320 $1,600 2502.541 4" PERF TP PIPE DRAIN LIN FT 36.00 10740 $84,440 10740 364,440 2503.541 12" RC PIPE SEWER DES 3006 Cl V LIN FT 325.00 209 35,225 209 $5 225 2503.541 15" RC PIPE SEWER DES 3006 CL V LIN FT 325.00 2930 $73,250 2930 373,250 $18,140 2503.541 18" RC PIPE SEWER DES 3006 CL V LIN FT 330.00 638 $19,140 838 2503.541 21" RC PIPE SEWER DES 3006 CL V LIN FT $35.00 687 324,045 687 $24 045 2503.541 24" RC PIPE SEWER DES 3006 CL III LIN FT $40.00 292 311,680 292 $11,680 2503.541 30" RC PIPE SEWER DES 3006 CL III LIN FT $50.00 115 $5,750 115 35,750 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH $1,000.00 1 $1,000 1 $1 ,000 2503.602 CONNECT TO EXISTING MANHOLES EACH $1,600.00 1 $1,600 1 $1,600 2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH $450.00 1 $450 1 $450 2503.602 4" PIPE PLUG EACH 340.00 1 $40 1 340 2503.602 6" PIPE PLUG EACH 350.00 1 350 1 $50 2503.602 SEWER RISER EACH $10.00 2 320 2 $20 2503.603 CONSTRUCT 8" INSIDE DROP LIN FT 360.00 11 3660 11 3660 2503.603 4" PVC SANITARY SERVIVE PIPE LIN FT 310.00 45 3450 45 $450 2503.603 6" PVC SANITARY SERVIVE PIPE LIN FT 312.00 14 $168 14 3168 2503.608 DUCTILE IRON FITTINGS POUND 310.00 1030 310,300 1030 $10,300 2504.601 IRRIGATION SYSTEM LUMP SUM $3,850.00 1 $3,850 1 33,850 2504.602 CONNECT TO EXISTING WATER MAIN EACH 3600.00 2 31200 2 31,200 2504.602 HYDRANT EACH 32,000.00 1 $2,000 1 32,000 2504.602 8" PIPE PLUG EACH $60.00 1 $60 1 380 2504.602 1 " CORPORATION STOP EACH 3125.00 1 3125 1 3125 2504.602 2" CORPORATION STOP EACH 9185.00 1 3185 1 3185 2504.802 10 "X8" WET TAP EACH 32,500.00 1 $2,500 1 32,500 2504.602 12" GATE VALVE AND BOX EACH $1,600.00 2 $3,200 2 33,200 2504.602 1 " CURB STOP & BOX EACH $140.00 1 3140 1 3140 2504.602 2" CURB STOP & BOX EACH 3190.00 1 3190 1 3190 2504.603 1 "TYPE KCOPPER PIPE LIN FT $16.00 99 $1,584 99 $1,584 2504.603 2 "TYPE KCOPPER PIPE LIN FT $18.00 10 3180 10 3180 2504.603 6" WATERMAIN DUCTILE IRON CL 52 LIN FT $32.00 5 3160 5 3160 2504.603 8" WATERMAIN DUCTILE IRON CL 52 LIN FT $35.00 27 $945 27 $945 2504.603 12" WATERMAIN DUCTILE IRON CL 52 LIN FT $40.00 340 313,600 340 313,600 2504.604 6" POLYSTYRENE INSULATION SQ YD $40.00 14 $560 14 3560 2506.501 CONST DRAINAGE STRUCTURE DESIGN F LIN FT $250.00 41 $10,293 41 $10,293 2506.501 CONST DRAINAGE STRUCTURE DESIGN G LIN FT 3330.00 132 $43,679 132 $43,679 2506.501 CONST DRAINAGE STRUCUTURE DESIGN 72 -4020 LIN FT 3400.00 7 $2,888 7 32,888 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 EACH 32,600.00 1 $2,600 1 $2,600 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 2 EACH 31,800.00 1 $1,800 1 $1,800 2506.516 CASTING ASSEMBLY EACH 3500.00 45 322,500 45 $22,500 2511.501 RANDOM RIPRAP CLASS II CU YD 350.00 15 3750 15 3750 2511.501 RANDOM RIPRAP CLASS III CU YD $60.00 310 $18,607 229 $13,747 81 $4,860 2511.515 GEOTEXTILE FILTER TYPE IV SQ YD 34.00 46 3184 46 3184 2521.501 4" CONCRETE WALK SQ FT 32.75 28438 $78,205 28438 378,205 2521.501 6 "CONCRETE WALK SQ FT 34.50 602 32,709 602 32,709 2531.501 CONCRETE CURB & GUTTER DESIGN 8418 LIN FT $10.00 4270 $42,700 4270 342,700 2531.501 CONCRETE CURB & GUTTER DESIGN B424 LIN FT $10.00 5714 $57,140 5714 357,140 2531.501 CONCRETE CURB & GUTTER DESIGN 8618 LIN FT 310.00 976 $9,760 976 $9,760 2531.618 TRUNCATED DOMES SQ FT 345.00 164 $7,380 164 37,380 2533.507 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 39.00 1800 $18,200 1800 $18,200 2533.508 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DES 8337 UN FT 33.00 400 31,200 400 31,200 2545.523 3 INCH NONMETALLIC CONDUIT LIN FT $8.00 160 $1,280 160 $1,280 2545.523 2 INCH NONMETALLIC CONDUIT LIN FT $5.00 100 3500 100 3500 2545.531 UNDERGROUND WIRE, 1 CONDUCTOR NO. 3/0 LIN FT 33.50 330 $1,155 330 31,155 2545.533 ARMORED CABLE, 4 CONDUCTOR NO. 4 LIN FT $15.00 1975 $29,625 1975 $29,625 2545.553 HANDHOLE EACH 3600.00 1 3600 1 3600 2545.602 SERVICE EQUIPMENT EACH $2,500.00 1 $2,500 1 $2,500 2545.602 ELECTRIC SERVICE EACH 31,000.00 1 31,000 1 $1,000 2545.602 INSTALL SERVICE CABINET EACH $2,000.00 1 32,000 1 $2,000 2554.501 TRAFFIC BARRIER DESIGN SPECIAL LIN FT 355.00 50 32,750 50 32,750 Z: \WORD \Projects \Lake Drive & 35W Site \Report \Exhibit A.xls Page2 • EXHA CSAH 23 (Lake Drive) and 1 -3 erchange Reconstruction. SAP 02- 623 -13 210- 020 -04 ITEM NO. ITEM UNIT UNIT PRICE TOTAL ESTIMATED QUANTITY TOTAL ESTIMATED COST CITY OF LINO LAKES SA.P. 210 -020 -04 ANOKA COUNTY S.A.P. 02-623-13 STORM ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST 2554.501 TRAFFIC BARRIER DESIGN 88338 LIN FT $18.00 408 $7,344 408 $7,344 2554.521 ANCHORAGE ASSEMBLY - PLATE BEAM EACH $300.00 2 $600 2 $600 2554.523 END TREATMENT - TANGENT TERMINAL EACH $2,000.00 1 $2,000 1.0 $2,000 2554.523 END TREATMENT - FLARED TERMINAL EACH 31,800.00 1 $1,800 1.0 $1,800 2554.602 IMPACT ATTENUATOR BARRELS EACH 3225.00 100 $22,500 100 $22,500 2554.602 RELOCATE IMPACT ATTENUATOR BARRELS EACH $50.00 24 $1,200 24 $1,200 2557.501 WIRE FENCE DESIGN 60 -9320 LIN FT $12.00 780 $9,360 780 69,380 2563.601 TRAFFIC CONTROL LUMP SUM $30,000.00 1 $30,000 1 $30,000 2563.602 MEDIAN BARRIER DELINEATOR EACH $5.00 38 3190 38 $190 2563.602 RAISED PAVEMENT MARKER TEMPORARY EACH $1.65 700 31,155 700 $1,155 2563.610 POLICE OFFICER HOUR $80.00 110 $8,800 110 $8,800 2563.613 PORTABLE CHANGEABLE MESSAGE SIGN UDAY $225.00 25 $5,625 25 $5,625 2564.531 SIGN PANELS TYPE C SQ FT $20.00 479 39,581 479 $9,581 2564.531 SIGN PANELS TYPE D SQ FT $20.00 254 35,070 254 35,070 2564.531 SIGN PANELS TYPE OVERLAY SQ FT $10.00 25 3250 25 $250 2564.537 INSTALL SIGN TYPE C EACH $105.00 5 $525 5 $525 2564.537 INSTALL SIGN TYPE SPECIAL EACH $150.00 2 $300 2 3300 2564.550 DELINEATOR TYPE X4-6 EACH $55.00 1 $55 1 $55 2564.552 HAZARD MARKER X4 -2 EACH $85.00 10 $850 10 3850 2564.553 CLEARANCE MARKER X4-4 EACH 3100.00 2 6200 2 3200 2565.511 TRAFFIC CONTROL SIGNAL SYSTEM A SIG SYS $205,200.00 1 $205,200 0.75 $153,900 0.25 $51,300 2565.511 TRAFFIC CONTROL SIGNAL SYSTEM B SIG SYS $160,800.00 1 $160,800 0.75 3120,600 0.25 $40,200 2565.511 TRAFFIC CONTROL SIGNAL SYSTEM C SIG SYS 3161,700.00 1 6161,700 0.75 3121,275 0.25 $40,425 2565.601 COUNTY FURNISHED MATERIAL LUMP SUM 365,000.00 1 $65,000 0.75 $48,750 0.25 $16,250 2565.801 EMERGENCY VEHICLE PREEMPTION SYSTEM A LUMP SUM $12,800.00 1 $12,800 1.0 $12,800 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM B LUMP SUM $6,400.00 1 $6,400 1.0 $6,400 2565.601 EMERGENCY VEHICLE PREEMPTION SYSTEM C LUMP SUM $6,000.00 1 $6,000 1.0 36,000 2565.601 TRAFFIC CONTROL INTERCONNECTION LUMP SUM $15,500.00 1 $15,500 1.0 $15,500 2565.616 REVISE SIGNAL SYSTEM D SYSTEM 313,200.00 1 $13,200 0.75 $9,900 0.25 $3,300 2571.501 CONIFEROUS TREE 5' HT B &B TREE $385.00 12 34,620 12 $4,620 2571.501 CONIFEROUS TREE 6' HT B &B TREE $495.00 7 33,465 7 $3,465 2571.501 CONIFEROUS TREE 7' HT B &B TREE $550.00 25 $13,750 25 $13,750 2571.502 DECIDUOUS TREE 1.5" CAL 8 &B TREE $275.00 25 $6,875 25 $6,875 2571.502 DECIDUOUS TREE 2.0" CAL B &B TREE $385.00 8 $3,080 8 $3,080 2571.502 DECIDUOUS TREE 2.5" CAL B &B TREE $440.00 12 $5,280 12 $5,280 2571.505 DECIDUOUS SHRUB 2' HT CONT SHRUB $55.00 81 $4,455 81 $4 455 2571.507 PERENNIALS PLANT 322.00 173 $3,806 173 $3,806 2571.507 PERENNIAL PLUGS PLANT 35.50 1447 $7,959 1447 $7,959 2572.501 TEMPORARY FENCE LIN FT 32.00 250 $500 250 $500 2572.603 AQUATIC PLANT FENCE LIN FT 32.75 883 $2,428 883 $2,428 2573.502 SILT FENCE, TYPE MACHINE SLICED LIN FT $3.00 9756 $29,268 9756 $29,268 2573.530 STORM DRAIN INLET PROTECTION EACH $200.00 43 $8,600 43 38,600 2573.540 FILTER LOG TYPE ROCK BIOROLL LIN FT $5.00 135 3675 135 $675 2575.501 SEEDING ACRE $80.00 5.0 $396 5.0 3396 2575.502 SEED MIXTURE 250 POUND $1.75 347 $606 347 $606 2575.502 SEED MIXTURE 310 POUND $10.00 25 $246 25 $246 2575.502 SEED MIXTURE 330 POUND $10.00 40 $405 40 $405 2575.505 SODDING TYPE LAWN SQ YD $2.75 13007 335,769 13007 $35,769 2575.511 MULCH MATERIAL TYPE 1 TON $100.00 10.0 $996 10.0 $996 2575.511 MULCH MATERIAL TYPE 7 TON $495.00 2.0 $990 2.0 $990 2575.519 DISK ANCHORING ACRE 365.00 5.0 $322 5.0 $322 2575.523 EROSION CONTROL BLANKETS CATEGORY 2 SQ YD $2.20 1495 $3,289 1495 $3,289 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 SQ YD $5.00 7178 $35,890 7178 $35,890 2575.532 FERTILIZER TYPE 3 POUND $0.50 2111 $1,055 2111 $1,055 2575.807 MULCH MATERIAL TYPE SPECIAL CU YD $44.00 40 $1,760 40 $1,760 2575.607 SELECT TOPSOIL BORROW (SPECIAL) LV CU YD 325.00 81 $2,021 81 $2,021 2575.607 SELECT TOPSOIL BORROW LV CU YD $33.00 151 $4,983 151 $4,983 2575.608 SEED MIX SPECIAL 1 POUND $24.00 4.5 3108 4.5 $108 2575.608 SEED MIX SPECIAL 2 POUND $24.00 10.5 3252 10.5 $252 2575.608 SEED MIX SPECIAL 3 POUND $24.00 30.0 $720 30.0 $720 2577.505 LIVE STAKES EACH 31.00 454 $454 454 $454 2582.501 PAVEMENT MESSAGE (LEFT ARROW) PAINT EACH $80.00 7 3560 7 3560 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) PAINT EACH $80.00 9 3720 9 3720 2582.501 PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM EACH $250.00 2 3500 2 $500 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM EACH $250.00 2 $500 2 $500 2582.501 PAVEMENT MESSAGE (LEFT -THRU ARROW) POLY PREFORM EACH $450.00 2 $900 2 3900 2582.501 PAVEMENT MESSAGE (LT ARROW) PREF THERMOPLASTIC EACH $250.00 17 $4,250 17 $4,250 Z: \WORD \Projects \Lake Drive & 35W Site \Report \Exhibit A.xls Page3 EXHAIN A CSAH 23 (Lake Drive) and 1-33111115terchange Reconstruction. SAP 02- 623 -13 and 210- 020 -04 • ITEM NO. ITEM UNIT UNIT PRICE TOTAL ESTIMATED QUANTITY TOTAL ESTIMATED COST CITY OF LINO LAKES S.A.P. 210 -020 -04 ANOKA COUNTY S.A.P. 02- 623 -13 STORM ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST ESTIMATED QUANTITY ESTIMATED COST 2582.501 PAVEMENT MESSAGE (RT ARROW) PREF THERMOPLASTIC EACH 5250.00 11 52,750 11 $2,750 2582.502 4" SOLID LINE WHITE -PAINT LIN FT 50.06 17300 $1,038 17300 $1,038 2582.502 12" SOLID LINE WHITE -PAINT LIN FT $2.00 460 5920 460 5920 2582.502 4" BROKEN LINE WHITE -PAINT LIN FT 50.15 75 $11 75 511 2582.502 4" SOLID LINE YELLOW -PAINT LIN FT 50.08 6400 5512 6400 5512 2582.502 4" DOUBLE SOLID LINE YELLOW -PAINT LIN FT 50.20 8400 51,680 8400 51,680 2582.502 4" SOLID LINE WHITE -EPDXY LIN FT 50.20 12200 52,440 12200 $2,440 2582.502 24" SOLID LINE WHITE -EPDXY LIN FT 58.50 150 51,275 150 51,275 2582.502 4" BROKEN LINE WHITE -EPDXY LIN FT $0.40 880 5352 880 5352 2582.502 8" DOTTED LINE WHITE -EPDXY LIN FT 51.00 70 $70 70 570 2582.502 4" SOLID LINE YELLOW -EPDXY LIN FT 50.25 8810 51,703 6810 51,703 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY LIN FT $0.45 1550 5698 1550 5698 2582.502 24" SOLID LINE YELLOW -EPDXY LIN FT $7.50 70 5525 70 5525 2582.502 4" SOLID LINE WHITE -POLY PREFORM LIN FT 52.50 580 51,450 580 $1,450 2582.502 4" BROKEN LINE WHITE -POLY PREFORM LIN FT 52.50 125 $313 125 5313 2582.502 24" SOLID LINE WHITE -POLY PREFORM LIN FT 515.00 60 5900 60 5900 2582.502 24" SOLID LINE WHITE -PREF THERMOPLASTIC LIN FT $15.00 380 55,700 380 $5,700 2582.503 CROSSWALK MARKING -POLY PREFORM SQ FT 57.50 310 52,325 310 52,325 2582.503 CROSSWALK MARKING -PREF THERMOPLASTIC SQ FT $7.50 1260 59,450 1260 $9,450 2401.501 STRUCTURAL CONCRETE (1A43) CU YD $275.00 1053 5289,575 1053 5289,575 2401.501 STRUCTURAL CONCRETE (3Y43) CU YD $380.00 1935 5735 300 1935 $735,300 2401.512 BRIDGE SLAB CONCRETE (3Y36) SQ FT $9.50 33630 $319,485 33630 5319,485 2401.513 TYPE MOD P -1 RAILING CONCRETE (3Y46) LIN FT 550.00 386 519,300 386 519,300 2401.513 TYPE MOD P-4 RAILING CONCRETE (3Y46) LIN FT $60.00 656 $39,360 656 539,360 2401.516 RAISED MEDIAN CONCRETE (3Y46) SQ FT 58.50 1547 513,150 1547 513,150 2401.541 REINFORCEMENT BARS POUND 50.85 82300 569,955 82300 569,955 2401.541 REINFORCEMENT BARS (EPDXY COATED) POUND 50.95 348470 5331,047 348470 5331,047 2401.601 STRUCTURE EXCAVATION LUMP SUM $30,000.00 1 530,000 1 530,000 2401.618 BRIDGE DECK PLANING SOFT 50.80 35950 $28,760 35950 528,760 2402.583 ORNAMENTAL METAL RAILING LIN FT 5125.00 339 542,375 339 $42,375 2402.591 EXPANSION JOINT DEVICES TYPE 4 LIN FT 5110.00 359 539,490 359 $39,490 2402.595 BEARING ASSEMBLY EACH 5650.00 68 $44,200 68 544,200 2402.603 STRUCTURAL TUBE RAILING DESIGN T -2 LIN FT 5100.00 355 $35,500 355 535,500 2404.501 CONCRETE WEARING COURSE (3U17A) SO FT 53.75 38231 5143,366 38231 $143,366 2405.502 PRESTRESSED CONCRETE BEAMS MN63" LIN FT 5160.00 4709 $753,440 4709 $753,440 2405.511 DIAPHRAGMS FOR TYPE MN63 PREST BEAMS LIN FT 585.00 703 $59,755 703 $59,755 2411.618 ARCHITECTURAL CONCRETE TEXTURE (FRACTURED GRANITE) SQ FT 58.00 5081 $40,648 5081 $40,648 2411.618 ARCHITECTURAL SURFACE FINISH (SINGLE COLOR) SQ FT 51.25 5081 56,351 5081 $6,351 2442.501 REMOVE OLD BRIDGE LUMP SUM 560,000.00 1 $60,000 1 560,000 2452.507 C-I -P CONCRETE PILING DELIVERED 12" LIN FT $22.00 17440 $383,680 17440 5383,680 2452.508 C-I -P CONCRETE PILING DRIVEN 12" LIN FT 51.00 17440 $17 440 17440 $17,440 2452.519 C-I -P CONC TEST PILE 60 FT LONG 12" EACH $4,600.00 4 518,400 4 $18,400 2452.519 C -I -P CONC TEST PILE 65 FT LONG 12" EACH $5,000.00 8 540,000 8 $40,000 2452.601 STEEL SHEET PILING (TEMPORARY) LUMP SUM 530,000.00 1 $30,000 1 530,000 2452.602 PILE POINTS 12" EACH 580.00 337 $26,960 337 526,960 2452.602 PILE ANALYSIS EACH 52,200.00 6 $13,200 6 513,200 2502.601 DRAINAGE SYSTEM TYPE (B910) LUMP SUM $3,500.00 1 53,500 1 53,500 2514.501 CONCRETE SLOPE PAVING SQ YD $65.00 312 520,280 312 520,280 2545.509 CONDUIT SYSTEM (LIGHTING) LUMP SUM $5,000.00 1 55,000 1 55,000 2546.509 CONDUIT SYSTEM (SIGNALS) LUMP SUM $5,000.00 1 55,000 1 $5,000 TOTAL COSTS: $6,814,495 $2,745,280 $3,831,492 $237,723 Z: \WORD \Projects \Lake Drive & 35W Site \Report \Exhibit A.xls Page4