HomeMy WebLinkAbout2007-053 Council ResolutionCouncil Member° ►Donn ®llintroduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 07 -53 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT - 2007 OVERLAY PROJECT WHEREAS, pursuant to an advertisement for bids for the construction of 2007 Overlay Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid W B Miller, Inc. $ 169,929.50 ASTECH Corp. $ 185,470.20 North Valley, Inc. $ 191,535.12 Northwest Asphalt, Inc. $ 196,044.50 Rum River Contracting $ 206,939.00 Hardrives, Inc. $ 214,171.00 Midwest Asphalt Corp $ 219,976.75 T A Schifsky & Sons, Inc. $ 242,747.50 Knife River Corp. $ 248,896.40 Engineer's Estimate $ 188,564.00 AND WHEREAS, it appears that W B Miller, Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with W B Miller, Inc., in the name of the City of Lino Lakes for the construction of the 2007 Overlay Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next two lowest bidders shall be retained until a contract has been signed. ulia ne Bartell, C ty ' Ierk n Be esor", Mayor Adopted by the Lino Lakes City Council this 9th day of April, 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member Reinert and upon vote being taken thereon, the following voted infavorthereof: o ►Donnell, Reinert, Carlson, Stoltz, Bergeson The following voted against same: none • • • AGENDA ITEM 6C STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: April 9, 2007 TOPIC: Resolution No. 07 — 53, Accepting Bids and Awarding a Construction Contract, 2007 Overlay Project VOTE REQUIRED: Simple Majority BACKGROUND: Sealed bids were received and publicly opened at 10:30 a.m. on March 28, 2007. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid W B Miller Inc. $ 169,929.50 ASTECH Corp. $ 185,470.20 North Valley, Inc.. $ 191,535.12 Northwest Asphalt, Inc. $ 196,044.50 Rum River Contracting $ 206,939.00 Hardrives Inc. $ 214,171.00 Midwest Asphalt Corp $ 219,976.75 T A Schifsky & Sons Inc. $ 242,747.50 Knife River Corp. $ 248,896.40 Engineer's Estimate $ 188,564.00 The low bid is approximately 11% under the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. The final completion date for this project is October 31, 2007. RECOMMENDATION: Staff recommends that Resolution Number 07 — 53, Accepting Bids and Awarding a Construction Contract for the 2007 Overlay Project be adopted. • TKDA ENGINEERS • ARCHITECTS • PLANNERS March 28, 2007 Honorable Mayor and City Council City of Lino Lakes, Minnesota Re: 2007 Overlay Project City of Lino Lakes, Minnesota TKDA Project No. 13849.001 444 Cedar Street, Suite 1500 Saint Paul, MN 55101 -2140 (651) 292-4400 (651) 292 -0083 Fax www.tkda.com Dear Mayor and City Council: Bids for the referenced project were received on March 28, 2007, with the following results. A complete Tabulation of Bids is enclosed for your information. Contractor Base Bid W. B. Miller Inc. ASTECH Corp. North Valley Inc. Northwest Asphalt Inc. Rum River Contracting Hardrives, Inc. Midwest Asphalt Corp. T.A. Schifsky & Sons Knife River Corp. Engineer's Estimate Recommendation $169,929.50 $185,470.20 $191,535.36 $196,044.50 $206,939.00 $214,171.00 $219,976.75 $242,747.50 $248,896.40 $188,564.00 We recommend that you award the Contract to the lowest bidder, W.B. Miller Inc., for their low bid of $169,929.50. Please do not hesitate to call me with any questions or comments you may have. Thomas D. Prew, P.E. Project Manager TDP:cme Enclosure An Employee Owned Company Promoting Affirmative Action and Equal Opportunity TABULATION OF BIDS 2007 OVERLAY CITY OF LINO LA KES, MI NNESOTA T TKDA ENGINEERS • ARCHITECTS • PLANNERS 1 M MOBILIZATION 1 1 E EA $ $5,000.00 $ $ 5,000.00 $ $ 2,500.00 $ $ 2,500.00 $ $ 6,000.00 $ $ 6,000.00 2 R RECLAIM BITUMINOUS 1 14,720 S SY $ $0.60 $ $ 8,832.00 $ $ 0.40 $ $ 5,888.00 $ $ 0.56 $ $ 8,243.20 3 H HAUL OUT EXCESS MILLINGS (LV) 7 725 C CY $ $6.00 $ $ 4,350.00 $ $ 5.00 $ $ 3,625.00 $ $ 5.38 $ $ 3,900.50 4 R RESHAPE MILLINGS (3% CROWN) 4 43.2 R RS $ $135.00 $ $ 5,832.00 $ $ 130.00 $ $ 5,616.00 $ $ 110.00 $ $ 4,752.00 5 B BITUMINOUS BASE COURSE 2360 TYPE LV 3 1 1,800 T TN $ $43.00 $ $ 77,400.00 $ $ 41.42 $ $ 74,556.00 $ $ 42.34 $ $ 76,212.00 6 B BITUMINOUS WEARING COURSE 2360 TYPE LV 4 1 1,450 T TN $ $47.00 $ $ 68,150.00 $ $ 44.21 $ $ 64,104.50 $ $ 44.25 $ $ 64,162.50 7 B BITUMINOUS MATERIAL FOR TACK COAT 8 800 G GA $ $1.50 $ $ 1,200.00 $ $ 1.50 $ $ 1,200.00 $ $ 2.00 $ $ 1,600.00 8 B BITUMINOUS CURBING 5 500 L LF $ $2.00 $ $ 1,000.00 $ $ 5.00 $ $ 2,500.00 $ $ 5.25 $ $ 2,625.00 9 S SAWCUT BITUMINOUS DRIVEWAYS 2 220 L LF $ $2.50 $ $ 550.00 $ $ 2.00 $ $ 440.00 $ $ 2.50 $ $ 550.00 10 R REMOVE DRIVEWAY MATERIAL 2 250 S SY $ $5.00 $ $ 1,250.00 $ $ 3.00 $ $ 750.00 $ $ 5.00 $ $ 1,250.00 11 B BIT. WEARING COURSE 2360 TYPE LV 4 (FOR DRIVES) 2 250 S SY $ $20.00 $ $ 5,000.00 $ $ 15.00 $ $ 3,750.00 $ $ 12.30 $ $ 3,075.00 12 G GRADER FOR DRAINAGE CORRECTION IN CUL -DE -SACS 5 5 H HR 2 200 $ $ 1,000.00 $ $ 100.00 $ $ 500.00 $ $ 100.00 $ $ 500.00 13 R REMOVE AND REPLACE CATCH BASIN (TYPE 402) 6 6 E EA 1 1,500 $ $ 9,000.00 $ $ 750.00 $ $ 4,500.00 $ $ 2,100.00 $ $ 12,600.00 TOTAL $ $ 188,564.00 $ $ 169,929.50 $ $ 185,470.20 11110 • Page 1 TABULATION OF BIDS 2007 CITY OF LINOYA LAKES, MINNESOTA CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13849.001 BIDS OPENED: MARCH 28, 2007, AT 10:30 AM *DENOTES ERROR IN BIDDERS CALCULATION NORTH VALLEY INC. NORTHWEST ASPHALT INC. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ENGINEERS - ARCHITECTS • PLANNERS RUM RIVER CONTRACTING UNIT TOTAL PRICE AMOUNT 1 MOBILIZATION 1 EA $ 2,500.00 $ 2,500.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 $ 4,000.00 2 RECLAIM BITUMINOUS 14,720 SY $ 0.75 $ 11,040.00 $ 0.65 $ 9,568.00 $ 0.60 $ 8,832.00 3 HAUL OUT EXCESS MILLINGS (LV) 725 CY $ 2.00 $ 1,450.00 $ 5.00 $ 3,625.00 $ 2.50 $ 1,812.50 4 RESHAPE MILLINGS (3% CROWN) 43.2 RS $ 135.00 $ 5,832.00 $ 170.00 $ 7,344.00 $ 120.00 $ 5,184.00 5 BITUMINOUS BASE COURSE 2360 TYPE LV 3 1,800 TN $ 43.93 $ 79,074.00 $ 44.55 $ 80,190.00 $ 48.84 $ 87,912.00 6 BITUMINOUS WEARING COURSE 2360 TYPE LV 4 1,450 TN $ 47.56 $ 68,962.00 $ 47.65 $ 69,092.50 $ 51.47 $ 74,631.50 7 BITUMINOUS MATERIAL FOR TACK COAT 800 GA $ 2.25 $ 1,800.00 $ 1.75 $ 1,400.00 $ 2.00 $ 1,600.00 8 BITUMINOUS CURBING 500 LF $ 2.50 $ 1,250.00 $ 3.00 $ 1,500.00 $ 6.75 $ 3,375.00 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 2.50 $ 550.00 $ 2.50 $ 550.00 $ 2.00 $ 440.00 10 REMOVE DRIVEWAY MATERIAL 250 SY $ 3.50 $ 875.00 $ 4.50 $ 1,125.00 $ 3.30 $ 825.00 11 BIT. WEARING COURSE 2360 TYPE LV 4 (FOR DRIVES) 250 SY $ 13.00 $ 3,250.00 $ 17.20 $ 4,300.00 $ 14.80 $ 3,700.00 12 GRADER FOR DRAINAGE CORRECTION IN CUL -DE -SACS 5 HR $ 135.00 $ 675.00 $ 150.00 $ 750.00 $ 25.00 $ 125.00 13 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 6 EA $ 2,379.56 $ 14,277.36 $ 2,100.00 $ 12,600.00 $ 2,417.00 $ 14,502.00 TOTAL $ 191,535.36 $ 196,044.50 $ 206,939.00 • • • Page 2 TABULATION OF BIDS 2007 CITY OF LINOYA LAKES, MINNESOTA CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13849.001 BIDS OPENED: MARCH 28, 2007, AT 10:30 AM *DENOTES ERROR IN BIDDERS CALCULATION HARDRIVES, INC. MIDWEST ASPHALT CORP. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ENGINEERS • ARCHITECTS • PLANNERS T. A. SCHIFSKY & SONS UNIT TOTAL PRICE AMOUNT 1 MOBILIZATION 1 EA $ 3,200.00 $ 3,200.00 $ 5,000.00 $ 5,000.00 $ 8,000.00 $ 8,000.00 2 RECLAIM BITUMINOUS 14,720 SY $ 1.40 $ 20,608.00 $ 0.45 $ 6,624.00 $ 0.85 $ 12,512.00 3 HAUL OUT EXCESS MILLINGS (LV) 725 CY $ 7.00 $ 5,075.00 $ 11.85 $ 8,591.25 $ 6.30 $ 4,567.50 4 RESHAPE MILLINGS (3 %CROWN) 43.2 RS $ 65.00 $ 2,808.00 $ 125.00 $ 5,400.00 $ 165.00 $ 7,128.00 5 BITUMINOUS BASE COURSE 2360 TYPE LV 3 1,800 TN $ 44.00 $ 79,200.00 $ 45.60 $ 82,080.00 $ 52.50 $ 94,500.00 6 BITUMINOUS WEARING COURSE 2360 TYPE LV 4 1,450 TN $ 49.00 $ 71,050.00 $ 48.25 $ 69,962.50 $ 55.50 $ 80,475.00 7 BITUMINOUS MATERIAL FOR TACK COAT 800 GA $ 1.75 $ 1,400.00 $ 1.90 $ 1,520.00 $ 3.00 $ 2,400.00 8 BITUMINOUS CURBING 500 LF $ 5.50 $ 2,750.00 $ 9.40 $ 4,700.00 $ 6.80 $ 3,400.00 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 2.75 $ 605.00 $ 2.95 $ 649.00 $ 2.00 $ 440.00 10 REMOVE DRIVEWAY MATERIAL 250 SY $ 5.65 $ 1,412.50 $ 4.10 $ 1,025.00 $ 12.50 $ 3,125.00 11 BIT. WEARING COURSE 2360 TYPE LV 4 (FOR DRIVES) 250 SY $ 17.25 $ 4,312.50 $ 23.50 $ 5,875.00 $ 18.00 $ 4,500.00 12 GRADER FOR DRAINAGE CORRECTION IN CUL -DE -SACS 5 HR $ 150.00 $ 750.00 $ 100.00 $ 500.00 $ 140.00 $ 700.00 13 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 6 EA $ 3,500.00 $ 21,000.00 $ 4,675.00 $ 28,050.00 $ 3,500.00 $ 21,000.00 TOTAL $ 214,171.00 $ 219,976.75 $ 242,747.50 • • • Page 3 TABULATION OF BIDS 2007 CITY OF LINO PROJECT K LAKES, MINNESOTA CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13849.001 BIDS OPENED: MARCH 28, 2007, AT 10:30 AM *DENOTES ERROR IN BIDDERS CALCULATION KNIFE RIVER CORP. ITEM UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT ENGINEERS • ARCHITECTS • PLANNERS UNIT TOTAL PRICE AMOUNT 1 MOBILIZATION 1 EA $ 5,183.77 $ 5,183.77 $ - 2 RECLAIM BITUMINOUS 14,720 SY $ 1.39 $ 20,460.80 $ - 3 HAUL OUT EXCESS MILLINGS (LV) 725 CY $ 16.13 $ 11,694.25 $ - 4 RESHAPE MILLINGS (3% CROWN) 43.2 RS $ 111.10 $ 4,799.52 $ - 5 BITUMINOUS BASE COURSE 2360 TYPE LV 3 1,800 TN $ 49.97 $ 89,946.00 $ - 6 BITUMINOUS WEARING COURSE 2360 TYPE LV 4 1,450 TN $ 56.13 $ 81,388.50 $ - 7 BITUMINOUS MATERIAL FOR TACK COAT 800 GA $ 1.86 $ 1,488.00 $ - 8 BITUMINOUS CURBING 500 LF $ 11.86 $ 5,930.00 $ - 9 SAWCUT BITUMINOUS DRIVEWAYS 220 LF $ 4.47 $ 983.40 $ - 10 REMOVE DRIVEWAY MATERIAL 250 SY $ 8.10 $ 2,025.00 $ - 11 BIT. WEARING COURSE 2360 TYPE LV 4 (FOR DRIVES) 250 SY $ 17.27 $ 4,317.50 $ - 12 GRADER FOR DRAINAGE CORRECTION IN CUL -DE -SACS 5 HR $ 105.72 $ 528.60 $ - 13 REMOVE AND REPLACE CATCH BASIN (TYPE 402) 6 EA $ 3,358.51 $ 20,151.06 $ - $ - TOTAL $ 248,896.40 $ - • • Page 4