Loading...
HomeMy WebLinkAbout2007-060 Council Resolution• • • Council Member Reinert introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION NO. 07-60 RESOLUTION APPROVING CHANGE ORDER NO. 4 LEGACY AT WOODS EDGE PHASE 1— STREET AND UTILITY IMPROVEMENTS WHEREAS, pursuant to the resolution of the Council adopted August 22, 2005, awarding the construction contract for the Legacy at Woods Edge Phase 1 - Street and Utility Improvements to Glenn Rehbein Companies, and WHEREAS, the contract requires amendment to include the installation of the sanitary sewer lift station and electrical and mechanical equipment and adjust sanitary sewer, water main, storm sewer and street improvement quantities to reflect actual constructed quantities. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA that: 1. Change Order No.4 related to the installation of lift station electrical and mechanical equipment and a reduction of in estimated quantities unit quantities to reflect actual constructed quantities in the amount of $10,600.98 is hereby approved. ne Bartell, ty C -r Jo J. Bergeson, Mayor Adopted by the Lino Lakes City Council this 23rd day of April 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member o' Donneltind upon vote being taken thereon, the following voted in favor thereof: Reinert, O'Donnell, Carlson, Stoltz, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. • • • AGENDA ITEM 6C STAFF ORIGINATOR: Michael Grochala CITY COUNCIL MEETING DATE: April 23, 2007 TOPIC: Resolution No. 07 -60, Approving Change Order No. 4, Legacy at Woods Edge Phase 1 — Street and Utility Improvements ACTION REQUIRED: Simple Majority BACKGROUND On August 22, 2005 the City Council awarded the Legacy at Woods Edge Phase 1 — Street and Utility Improvements contract to Glenn Rehbein Companies. The current approved contract amount is $2,631,683.85. Change Order No. 4 is for the installation of lift station control panel and mechanical equipment and for the reduction of sanitary sewer, water main, storm sewer and street improvement quantities to reflect actual construction quantities. The total cost of the Change Order is $10,600.98. The total revised contract amount, with the change order, is $2,642,284.83. The cost of the improvements were previously included in the City's financing package and special assessments levied against the properties. RECOMMENDATION Staff is recommending the adoption of Resolution No. 07 -60, Approving Change Order No.4 in the amount of $10,600.98. ATTACHMENTS 1. Resolution No. 07 -60 2. Change Order No. 4 • SEH CHANGE ORDER City of Lino Lakes, Minnesota March 19, 2007 OWNER DATE OWNERS PROJECT NO. Legacy at Woods Edge - Phase 1 PROJECT DESCRIPTION 4 CHANGE ORDER NO. A- LINOL0305.03 SEH FILE NO. The following changes shall be made to the contract documents: Description: 1. Contractor shall install lift station control panel by SyCom, pumps, piping, and fittings at a cost of $68,877.00 2. Deduct 0.68 LF Extra Depth Sanitary Manhole, 20 LF 6" Forcemain, 35 LF 6" DIP Water Main Class 52, 62 LF 8" DIP Water Main, Class 52, 1 Each 10 "x6" Wet Tap, 2 Each 8" Gate Valve & Box, 893 LF 1" Type "K" Copper Tubing, 27 LF Support Existing Storm Sewer Pipe 18 ", 50 LF Support Existing Storm Sewer Pipe 24 ", 247 SF Colored Concrete and add 63.71,,L,P Bituminous Non -Wear Type LV NW 35030C Mixture (Roadway). (- $58,276.02). Purpose of Change Order: 1. Amend scope of contract to include installation of lift station control panel, pumps and all associated piping. Lift station is to serve proposed townhouses on Woods Edge Boulevard. 2. Reduction in Sanitary Sewer, Water Main, Storm Sewer, and Street Improvement quantities to reflect actual constructed quantities. Basis of Cost: ® Actual Attachments (list supporting documents) Letter from Glenn Rehbein Companies dated July 17, 2006. ❑ Estimated Contract Status Original Contract Net Change Prior C.O.'s 1 to 3 Change this C.O. Revised Contract Recommended for Approval: Sort Elliott Hendrickson Inc. by to by race Time N/A Cost $2,231,503.85 $400,180.00 $10,600.98 $2,642,284.83 an Mas. /Pro - t Manager App d for Owner: Glenn Rehbein Companies BY 71:)/2<i) eci il'l4w4c TITLE Distribution Contractor 2 Owner 1 s: lco \1 \I ino 0030503\constructionphl \c:o #4.doc Project Representative 1 City of Lino Lakes, Minnesota TITLE SEH Office 1 Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer 1 www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax 1/04 11/02/2008 12:02 IFAX Fax @sehinc.com • Debbie McJames el 002/003 Nov. 2. 2006 11:01AM Glenn Rehbein Companies No. 2556 P. 2 • REHBEIN( COMPANIES • • July 17, 2006 Mr. Stefan Higgins Short Elliott Hendrickson, Inc 3535 Vadnais Center Drive St. Paul, MN 55110 -5196 Ph (651)490 -2000 * Fax (651)490 -2150 Re: Change Order # 1— Lift Station Legacy at Woods Edge — Phase 1 Lino Lakes, MN 8661 NAPLES ST. N.E. BLAINE, MN 55449 Phone (763) 784-0667 Fax (763) 7844001 www.rehbein.00m Equal Opportunity Employer Glenn Rehbein Excavating, Inc (GRE) is requesting a change order for the following: Description: Lift Station Includes: control panel by SyCom, pumps, piping, and fittings. Excludes: pre-cast concrete structure. Please issue us a change order in the amount of $68,877.00 for this additional work, If you have any questions, please give me a call. Respectfully: Jason Pauly Glenn Rehbein Companies Added Cost $68,877.00 1 C .p I*1-1