Council Member Reinert moved for adoption of the following resolution:
CITY OF LINO LAKES
RESOLUTION NO. 07- 85
RESOLUTION ACCEPTING FEASIBILITY REPORT AND CALLING FOR A PUBLIC
HEARING — SHENANDOAH STREET, STORM SEWER, AND WATERMAIN
IMPROVEMENT PROJECT
WHEREAS, pursuant to resolutions of the Council adopted May 14, 2007, a study has
been prepared by the City Engineer, with reference to Shenandoah Area Improvement
Project for Rice Court from Totem Trail to cul -de -sac, Hokah Court from Hokah Drive to
cul -de -sac, Hokah Drive from Totem Trail to Birch Street, Totem Trail from Arrowhead
Drive to Birch Street, Arrowhead Drive from Ware Road to 550 feet East of Totem Trail
by constructing street, storm sewer, watermain, and this report was received by the
Council on June 11, 2007, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible,
WHEREAS, the City proposes to assess the benefited property for all or a portion of the
cost of the improvement, pursuant to Minnesota States, Chapter 429, and Chapter 8 of
the Lino Lakes City Charter.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
• LINO LAKES, MINNESOTA:
1. The City Engineer is designated as the engineer for this improvement and he is
directed to call for a public hearing for the Shenandoah Area Street, Storm Sewer,
and Watermain Improvement project.
2. The Council will consider the improvement of such street in accordance with the
report and the assessment of abutting property for all or a portion of the cost of the
improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost
of the improvement of $2,156,635.00.
3. A public hearing shall be held on such proposed improvement on the
Stn day of July, 2007 in the Council chambers of the City Hall at 6:30 p.m. and the
clerk shall give mailed and publishecj notice of such aring and improvement as
required by law.
ulian le Bartell, Cit Clerk
Adopted by the Lino Lakes City Council this 11th day of June, 2007.
The motion for the adoption of the foregoing resolution was duly seconded by Council
MemberCarlson and upon vote being taken thereon, the following voted in favor
thereof: Reinert, Carlson, Stoltz, O'Donnell
The following voted against same:
none mayor Bergeson abstained()
Whereupon said resolution was declared duly passed and adopted.
n J. Bergeson, Mayor
AGENDA ITEM 6D
•
STAFF ORIGINATOR: James E. Studenski, City Engineer
COUNCIL MEETING DATE: June 11, 2007
TOPIC: Resolution No. 07 -85, Accepting Feasibility Report and Calling for a
Public Hearing, Shenandoah Area Street, Storm Sewer, and
Watermain Improvement Project.
VOTE REQUIRED: Simple Majority
BACKGROUND:
The City of Lino Lakes currently has approximately 100 of local streets. On May
14, 2007 City Council authorized the revision of Shenandoah Area Feasibility
study.
As the City of Lino Lakes ages, the need for reconstruction of local streets
becomes a greater priority. Streets that are in poor condition or have storm
drainage problems substantially increase city maintenance costs.
The Shenandoah Area Improvement project will be funded by a combination of
special assessments, Trunk Unit Funds, and general tax levies.
The feasibility study, ordered by the City Council, has been completed. The next
step in the process will be to accept the feasibility study and hold a Public
Hearing on July 9th for the proposed improvements.
RECOMMENDATION:
Staff recommends approving Resolution No. 07 -85 Accepting Feasibility Report
and Calling for a Public Hearing, Shenandoah Area Street, Storm Sewer, and
Watermain Improvement Project.
•