HomeMy WebLinkAbout2007-099 Council Resolution• its adoption: Council Member Carlson introduced the following resolution and moved
•
CITY OF LINO LAKES
RESOLUTION NO. 07 -99
RESOLUTION AUTHORIZING A UTILITY RATE STUDY
WHEREAS, the last utility rate study was done in 2001, and;
WHEREAS, utility rates have remained the same since 2004, and;
WHEREAS, the Minnesota Department of Natural Resources (MN /DNR) has
been actively promoting the conservation of water resources, including providing
incentives through the utility rate structure, and;
WHEREAS, City's Comprehensive Water and Sewer Plans indicate the need for
additional facilities and infrastructure improvements in the next several years,
and for financing such improvements, and;
WHEREAS, the City Council has determined a need to perform a utility rate
study to develop a rate structure and revenue necessary to address these needs,
and;
WHEREAS, the City has received a quote from Springsted, Inc. to perform a
comprehensive utility rate study for the water and sewer utilities.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Lino
Lakes, Minnesota, that a Utility Rate Study is hereby authorized to be preformed
by Springsted, Inc. at a cost of $27,750, plus expenses. Such cost shall be split
equally between the Water and Sewer Funds.
Jeff O'Donnell, Acting Mayor
Adopted by the Lino Lakes City Council this 25th day of June, 2007.
The motion for the adoption of the foregoing resolution was duly seconded by
Council MemberReinert and upon vote being taken thereon, the following
voted in favor thereof:
Carlson, Reinert, O'Donnell
The following voted against same:
None (Absent - Bergeson, Stoltz)
Whereupon said resolution was declared duly passed and adopted.
•
•
•
AGENDA ITEM 2D
STAFF ORIGINATOR Al Rolek
MEETING DATE June 25, 2007
TOPIC Consider Resolution 07 -99 Authorizing a Utility Rate Study
VOTE REQUIRED Simple Majority
The city staff periodically reviews and suggests adjustments to the utility rates charged to
customers for the water and sewer utilities. The last time rates were adjusted was in 2004.
Utility rates are set based upon a number of factors. Among these are the cost of providing the
service, or operations costs; the cost of extending the utility network, or infrastructure costs;
financing and servicing of debt; and the cost of replacing worn facilities and systems, referred to
as depreciation or replacement costs. Other considerations in setting rates are regulatory
guidelines, conservation measures and rate comparisons with other area communities.
A key element to be considered in establishing water rates is conservation of the resource. The
city is currently in the process of completing a Water Emergency and Conservation Plan. This
plan, required by the MN DNR, establishes methods for the city to conserve its water usage to
the greatest degree possible and, importantly, plans future infrastructure needs, including sizing
of trunk water mains, new wells, storage capacity and water treatment facilities. In addition, the
plan establishes guidelines for residential consumption of water. A recommendation will be
included in the plan to structure water rates in tiers to encourage water conservation.
TKDA is also in the process of completing a feasibility study for water treatment facilities in the
city. The measures included in the conservation plan are important to the sizing of the
treatment facilities and, therefore, influence the cost of construction.
In September, 2006, the city requested and received a proposal from Springsted, Inc. to
conduct a comprehensive utility rate study. The proposal has recently been refreshed. The
study would include reviewing current and background utility data, including historical financial
information, volumes, capital improvements, debt service requirements, policies and practices,
growth trends and reviewing engineering studies, including the recent conservation plan and
water treatment feasibility study. Springsted then would evaluate the current data and consider
future needs in developing a comprehensive report which would recommend and justify any
future rate adjustments.
It is necessary to undertake the study at this time to complement the conservation plan and to
implement rate structure recommendations and any rate adjustments in 2008. Springsted
would need 12 to 16 weeks to complete the study, and would then present their formal report to
the City Council. The cost of the study is $27,750, plus expenses, which would be financed
equally from the water and sewer funds. A copy of the proposal is attached for your review.
Staff is recommending Council adopt Resolution 07 -99 authorizing Springsted, Inc. to complete
a utility rate study.
A -3
•
1. Adopt Resolution 07 -99.
2. Refer to Staff for further review.
3. Deny Resolution 07 -99.
Option 1
•
•
Work Plan
Objective(s)
The purpose of this study is to assist the City of Lino Lakes in evaluating the financial
operations of its Water and Wastewater Utilities to determine the necessary level of user
fees and charges that will provide adequate cash flow to pay for current plant expenditures,
anticipated future operating and maintenance expenses, debt service including principal and
interest, utility improvements asset replacement, and adequate cash reserves. Rate
recommendations will reflect the each Utility's recent cost experience as well as anticipated
future costs during the nominal period for which rates are projected.
Water and Wastewater Fee Study
Sprin s ed
May 2007
Task 1 Review Background Information
➢ Internal review of background information:
Review historical financial information, volumetric rates, basic facility
charges, contractual charges and other fees and charges that provide
sources of revenue for each Utility
Review the current allocation of costs to functional cost components and to
rates and charges for each utility
Review any current allocations of capital costs to connection and other
charges and fees for each utility
Review current and historical billing data for each utility
Review current funding practices, funding sources and policies related to
financing capital improvements for each utility
Review and update the City's existing capital improvement plan for each
utility identifying the sources of funding for each improvement
Review any existing debt service coverage requirements for both senior
and subordinate debt and the impact of adding additional debt to finance
new capital improvements for each Utility
Review ordinances, policies and practices related to user fees, connection
fees and other charges for utility services
Review the historical growth of the customer base and projections for
anticipated growth for each utility
Review any engineering studies, cost of services studies and other relevant
studies related to each Utility
Review the planning period to be used in the study
➢ Analyze information and develop preliminary availability fees for each Utility
and cost of service analysis for each Utility
- Analyze the information to identify any omissions and /or inconsistencies
and collect additional information, as needed
City of Lino Lakes, Minnesota
Water and Wastewater Fee Study
May 2007
Page 2
- Develop projected customer growth and future service demands based
upon the existing systems and anticipated growth
- Project the cost of providing services for each Utility
Task 11 - Conduct Study
D Develop a financial projection of each Utility that integrates all anticipated
revenue sources, including interest on the cash balance, anticipated operating
expenditures including existing and projected new depreciation, anticipated
capital expenditures, existing debt service, projected debt service for identified
projects and changes in the customer base over the planning period:
- Develop a ten -year forecast of revenues and expenditures for each Utility
to determine the adequacy of revenues provided by existing rates
- Evaluate the impact of anticipated capital improvement financing options
on rates, fees and charges
- Develop recommendations for the financing of the anticipated capital
improvements based on the above impact analysis
- Identify the overall change in revenue required to provide for adequate
funding for major capital improvement programs, to meet all recurring
annual operating and capital expenditures, to cover all debt service
requirements, to comply with any existing revenue bond covenants, and to
maintain sufficient cash balances and capital reserves (as defined by the
City) for each Utility The projections will be made using an income
statement approach and will include a yearly cash flow analysis
- Develop preliminary rate schedules for each Utility that provides revenue
recovery at levels necessary to support the Utility's operation as defined
above. Rates developed will include user fees, capacity fees, connection
charges and other fees and charges that provide sources of revenue to the
Utility
- Perform a sensitivity analysis to illustrate the impacts of adverse
assumption changes (e.g. future growth, operating costs)
D Evaluate each Utility's current service fees and charges to determine whether
there are additional service fees and charges that are currently not assessed
and that may be applicable to the Utility's provision of services and,
conversely, whether there are fees and charges that can be reduced or
eliminated
D Project the fiscal impact of proposed changes to fees and charges on each
Utility's current rates, fees and charges
- Develop recommendations for any changes to fees and charges, together
with the impact on current rates and charges
- Make recommendations for changes in existing ordinances, resolutions
and policies necessary to implement any new fees and charges
recommended
D. If we make a recommendation to increase rates or charges, Springsted will:
•
City of Lino Lakes, Minnesota
Water and Wastewater Fee Study
May 2007
Page 3
- Evaluate and compare the proposed fee structure with the Utility's current
fee structure and with the fee structure of at least three other similarly -sized
local government utility operations in the area
- Prepare sample bills for a minimum of 6 customers from representative
customer classes, comparing existing rates and charges to proposed rates
and charges
- Review and make recommendations for changes needed in existing
ordinances, resolutions and policies
D Develop a ten -year financial projection of capital expenditure needs related to
growth that integrates all anticipated revenue sources, anticipated capital
expenditures, and existing and projected debt service over the planning period:
- Develop preliminary availability fee that provides revenue recovery at levels
necessary to support the capital needs
— Perform a sensitivity analysis to illustrate the impacts of adverse
assumption changes (e.g. future growth,)
Task 1I1 - Present and Review Draft Report
D Springsted will prepare a Draft Report of Findings that will contain our findings
and recommendations. This review document will form the core of our final
report. We will submit fifteen bound copies plus one reproducible copy to the
City for their review and comment
D We will meet with City to review and discuss the Draft Report in a workshop
session
D Based on our discussion and review of the Draft Report, Springsted will make
modifications or changes, incorporating the City's comments into the final
report, as appropriate.
Task IV - Present and Review Final Report
D Springsted will present the Final Report of Findings and Recommendations in
a City Council regular or workshop session
D We will provide fifteen bound copies of the final study plus one reproducible
copy of the final report
Expectations
In order to conduct this study, the City will need to designate a staff member to serve as a
project manager. This person will be responsible for assisting Springsted with gathering
accurate and timely data needed to complete the project and to assist in arranging for
required meetings. At a minimum the following information will be needed to complete the
study:
• Financial Feasibility Study Required Information
D Copy of your most recent and previous two years Comprehensive Annual
Financial Reports
•
City of Lino Lakes, Minnesota
Water and Wastewater Fee Study
May 2007
Page 4
➢ Copy of your current and previous two years budgets including revenues and
expenditures for each utility
➢ A list of the anticipated capital expenditures for the current year indicating item
to be purchased or the expenditure to be made, amount, and anticipated
funding source for each utility
➢ A listing of all anticipated capital expenditures for the planning period 2008
through the 2018 (or lesser timer period if 2007 to 2017 is not available)
indicating item to be purchased, amount, and anticipated funding source for
each utility
➢ Copy of your current depreciation schedule and depreciable life use for various
assets
➢ Copies of any current policies related to capital expenditures and /or funding for
them including special assessments
➢ Copies of any current policies related to fund balances and /or cash balances
➢ Copies of existing debt schedules for any outstanding debt, i.e. bonds,
equipment certificates, lease- purchase agreements
➢ Information about Utility sales in terms of volumes and fee revenue for each of
your customer classes
➢ Information related to the anticipated growth in both residential and
commercial /industrial utility sales during the planning period
➢ Current schedule of user fees and charges
➢ Copies of any engineering studies, cost of services studies and other relevant
studies related to each Utility and this study
Compensation
We propose to complete this study as described in this proposal for the lump sum fee of
$27,750 exclusive of any out -of- pocket expenses such as travel and copying. This amount
would include up to three on -site meetings. We will complete the study within 16 weeks of
receiving the notice to proceed provided that all necessary information is made available to
Springsted in a timely manner and that City staff is available for required meetings. This draft
schedule does not anticipate any unforeseen delays or other circumstances that would result
in a later completion date. Should any unforeseen delays or circumstances arise, Springsted
can draw on its staff of 70 professionals to keep the project on schedule to the greatest extent
possible.
Springsted would invoice the City for work completed based on the following schedule:
Completion of Task I I
Completion of Task III
Completion of Task IV
50%
40%
10%
50%
90%
100%
•
•
•
City of Lino Lakes, Minnesota
Water and Wastewater Fee Study
May 2007
Page 5
Should the City request and authorize additional work outside the scope of services described
in this proposal or additional revisions beyond those agreed upon at the discussion and
review of the draft report and preliminary model, we would invoice the City at our standard
hourly fees.
Principal & Senior Officer
Officer & Project Manager
Senior Associate
Associate
Support Staff
$210
$180
$150
$135
$ 60