Loading...
HomeMy WebLinkAbout2007-116 Council ResolutionCouncil Membere� nerfi IDand moved its adoption: introduced the following resolution CITY OF LINO LAKES RESOLUTION NO. 07-116 RESOLUTION APPROVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING ADVERTISEMENT FOR BIDS — CSAH 14/8 MEDIAN LANDSCAPING WHEREAS, the City Engineer has prepared plans and specifications for the CSAH 14/8 Median Landscaping and has presented such plans and specifications to the Council for approval; WHERAS, the CSAH 14/8 Median Landscaping Project is part of the Anoka County CSAH 14/8 Reconstruction Project approved August 22, 2005 in Resolution No. 05 -118, Approving County Project within Municipal Corporate Limits (CSAH 14). NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. Such plans and specifications, a copy of which is on file at City Hall, are hereby approved. 2. The City clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids for the making of such improvement under such approved plans and specifications. The advertisement shall be published for 3 weeks, shall specify the work to be done, shall state that bids will be received by the Clerk, at which time they will be publicly opened in the City Hall by the City Clerk and Engineer, will then be tabulated, and will be considered by the Council at 6:30 p.m. on September 10, 2007, in the Council Chambers of the City Hall. Any bidder whose responsibility is questioned during consideration of the bid will be given an opportunity to address the Council on the issue of responsibility. No bids will be considered unless sealed and filed with the Clerk and accompanied by a cash deposit, cashier's check, bid bond or certified check payable to the Clerk for five (5) percent of the amount of such bid. u iann: Bartell, City le Adopted by the Lino Lakes City Council this 13th day of August, 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member S b ltz and upon vote being taken thereon, the following voted in favor thereof: Reinert, 1-1-01tz, Carl son, T3er elan The following voted against same: cone (,s eel{ _O'po,,,,,Qli) Whereupon said resolution was declared duly passed and adopted. • • AGENDA ITEM 6E STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: August 13, 2007 TOPIC: Resolution No. 07 - 116, Approving Plans and Specifications and Authorizing Advertisement for Bids, CSAH 14/8 Median Landscaping Vote Required: Simple Majority BACKGROUND: This project provides landscaping in the Lino Lakes portion of the newly constructed median for the Anoka County CSAH 14/8 Reconstruction Project. The overall project was approved by the City Council August 22, 2005, Approving County Project within Municipal Corporate Limits (CSAH 14, Main Street). This project includes the installation of an irrigation system, decorative pavement, and a selection of small trees, bushes and perennials. Attached is a location map and the planting plan for the project. Total project costs are estimated to be approximately $96,000. City staff has prepared the plans and specifications for this work and is requesting Council approval to accept the plans and specifications and advertise for bids. The schedule for this project is as follows: Open Bids City Council Awards Contract Construction Begins September 4, 2007 September 10, 2007 Late September, 2007 RECOMMENDATION: Staff recommends the adoption of Resolution No. 07 - 116, Approving Plans and Specifications and Authorizing Advertisement for Bids, CSAH 14/8 Median Landscaping. • • lid 1 • pg oz-ECT 1-,oc,4TIonl 0 ELMCREST AVE. N. END S.P. 02- 619 -Z3. S.P. 210-0 BEGIN S.P. 82- 608 -0T. S.P. 224 -020 CSAH 8 E.B. STA. 38 +74.71 • SCALE IN FEET 0 125 ®0 VICTOR PA) j J (/Th(f' j \\ ✓i / ij / / DRAWN BY, SFH CSA 4 E.B. S.P. 02- 614 -23, S.P. 210- 020 -02 1. STA. 14 +25.00 "f r/ /2 \,) D l'i, /// 1://1 ANOKA COUNTY �( �I WASHINGTON COUNTY CITY OF UNO LAKES [[//II I CITY OF H000 IF LEGEND = = INPLACE PAVEMENT NEW CONSTRUCTION UNDER THIS CONTRACT ® DJPLACE TOPOGRAPHY AND REMOVAL PLAN SHEET HOWER ® CONSTRUCTION PLAN SHEET NUAEER ® DRAINAGE AND SUPERELEVATION PLAN SHEET NUMBER K% TURF ESTABLISHMENT AND EROSION CONTROL PLAN SHEET NUMBER morn CCAICO AI 1 AvnI IT I S.P. 02- 614 -23 S.P. 82- 608 -07 1 a bwl0 110.6' aDE WNW MIDI NDa1a■n PLANT SCHEDULE QUANTITY ICOMNON NAYS SCIENTIFIC NAYS 8128 COMMB0T 10 Waken %WiUnn anent IANeolw Y1mum1 Inlaid& 2.8" BB B Japaan 1111 Mae Sydnps Mining IT BB SS, IDwalh uh honsysoekls Diann Wi ns 18" POT 108 ;Anthony saner' snag Spina 0 hamakN'Anthony wets& 1D" POT 420 Wind hek press Deschamps!, essplas 91 CONT. me' .,Illy IHanasceNS 141 CONT. iPlad 14" OC .9 WWII OsylAy * 0,.Ims' IHemaocakN "MN slelle' !1 CONT. P•A 215" OC Anne Roos - -' 0 pewmad' Ron (Ross moss 'Chang .10445 IROee ngon - Papa' IIr POT III O MEL II0R110 ALL 1aa4n1 Ww111 ARTAA a1N ORP 10011■ 11NRN COR M4 11111 1115 P(RL SPECMCA1IUN, 00 RPM W PREPARED er K DR UNDER MY DIRECT SUMMON AND 11411 1 All 11 DM UCENND IM0SG1 moor UNDER 115 INN of 111E Nan[ or MN11ES0TA 1110.11111 tl 1 X7:1: 150 JJt R10 PLANTING PLAN •