HomeMy WebLinkAbout2007-118 Council ResolutionCouncil MemberRReinert introduced the following resolution and moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 07 -118
RESOLUTION APPROVING CHANGE ORDER NO. 1
LAKE DRIVE /135W IMPROVEMENT PROJECT
WHEREAS, pursuant to the resolution of the City Council adopted May 14, 2007, the City
awarded the construction contract for the Lake Drive /I -35W Improvement Project to Lunda
Construction Company, and
AND WHEREAS, additional costs incurred to repair a deteriorated drainage structure to avoid
undermining a portion of the in place roadway,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO
LAKES, MINNESOTA:
1. Change Order No.1, in the amount of $2,000.00, is hereby approved.
e Bartell, C. ' Clerk
""J B 'geson, Mayor
Adopted by the Lino Lakes City Council this 13th day of August, 2007
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member Stott-2_. and upon vote being taken thereon, the following voted in favor
thereof: et rt 54-a l4-z, Carlson , B e1 esan
The following voted against same:
none (A- hsevtt- O'Donnell
Whereupon said resolution was declared duly passed and adopted.
•
•
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
AGENDA ITEM 6F
Michael Grochala
August 13, 2007
Resolution No. 07 -118, Approving Change
Order No. 1, Lake Drive /35W Improvement
Project
ii. Resolution No. 07 -119, Approving Change
Order No. 2 Median Island Landscaping, Lake
Drive /35W Improvement Project
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
On May 14, 2007 the City Council awarded the Lake Drive /I -35W Improvement Project
to Lunda Construction Company in the amount of $7,531,701.71. Construction is
underway with curb and gutter placement anticipated the week of the 20th for the
northbound lanes. The northbound center pier of the bridge has been completed and
the northeast and southeast bridge abutments are anticipated to be completed within
the next month.
Change Order No. 1 addresses the additional costs incurred to repair a deteriorated
drainage structure to avoid undermining a portion of the in place roadway. The total
cost of this repair is $2,000.
Change Order No. 2 addresses the incorporation of landscaping into the median
islands located both north and south of the bridge. The improvements will consist of a
colored concrete median border, perennial plants, shrubs and irrigation. The total
amount of the change order is $171,100.33.
The total contract amount with the Change Orders is $7,704,802. Funding for the
change orders was included within the project budget. The project budget included a
5% construction contingency to cover unanticipated costs such as those addressed in
Change Order No. 1.
The landscaping of the medians was a planned improvement and funding was
previously incorporated into the budget for this purpose. The plans were not finalized at
the time of project letting in April and still required review by Anoka County. To avoid
delays in the project letting they were not included in the original bid with the intent to
be added in at a later date . Over the past month staff has been working with the
contractor and Anoka County to finalize the plan. The contract prices have been
reviewed by the City's consultant engineer, SEH Inc., and Mn /DOT estimating staff and
•
•
•
are acceptable. While the majority of landscaping items will not be installed until next
year there are irrigation items that need to be installed immediately to avoid delays in
the roadway work scheduled over the next two weeks.
RECOMMENDATION:
Staff is recommending approval of Resolution No. 07 -118 and No. 07 -119.
ATTACHMENTS
1. Resolution No. 07 -118
2. Resolution No. 07 -119
3. Change Order No. 1
4. Change Order No. 2
140
07/27/2007 14:05 FAX 6514064724 MN DOT /MENDOTA HTS 1J002
Mn /DOT TP -2460- 0112 -92)
•
SHEET 1 OF 1 SHEETS
State of Minnesota - Department of Transportation
CHANGE ORDER # 1
Contractor: Lunda Construction Co.
Address: 15601 Clayton Avenue S.
Rosemount, MN 55068
State Project No.: 0280 -55
Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr.
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions.
While working along the southeast corner of the existing bridge, it was discovered that a drainage structure is badly
deteriorated and undermining a portion of the inplace roadway. In order to prevent further undermining and to control
erosion along the roadway and sheetpiling that has been installed it has been determined that the drainage structure should
be patched and a temporary pipe installed.
This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to patch and provide
temporary drainage from the structure located near the southeast corner of the existing bridge.
All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard
Specifications, Mn/DOT Standard Plates and as directed by the Engineer.
•ayment to the Contractor for this work will be via Mn/DOT 1904 Force Account, as shown below in the Estimate of
Cost:
ESTIMATE OF COST
Description
GRAND TOTAL FORCE ACCOUNT
CHANGE IN CONTRACT TIME
Due to this change the Contract Time:
a. Is increased ( ) by Working Days
Is decreased ( ) by Working Days
Is increased ( ) by Calendar Days
Is decreased ( ) by Calendar Days
b. Is not changed (X )
c. May be revised if the work affected
the controlling operation ( )
Issued By:
Mt/Resident/County Engineer
Amount
$2,000.00
Date
Approved By:
Date
City of Lino Lakes
Approved By:
Date
Anoka County
Accepted By:
Contractor's Authorized Representative Date
Original to 'Project Engineer; copies to Contractor, City of Lino Lakes, Anoka. County
Mn /DOT TP- 2460 - 0112 -92)
SHEET 1 OF 2 SHEETS
State of Minnesota - Department of Transportation
CHANGE ORDER # 2
C•
ontractor: Lunda Construction Co.
Address: 15601 Clayton Avenue S.
Rosemount, MN 55068
State Project No.: 0280 -55
Contract No. Z07502
Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr.
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions.
The construction plans on sheets 79, 80, and 81 of 198 show the location of the median islands that are to be constructed
on C.S.A.H. 23. At the request of the City of Lino Lakes, the median construction is eliminating the four (4) inch concrete
walk and replacing it with an irrigated landscape system.
This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to construct the above
stated irrigated landscape system. By signing this Change Order, the Contractor acknowledges receipt of one plan
containing four (4) 11 X 17 sheets depicting the redesign of the C.S.A.H. 23 median islands.
All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn /DOT Standard
Specifications, Mn/DOT Standard Plates and as directed by the Engineer.
Payment to the Contractor for this work will be at the negotiated prices, as shown below in the Estimate of Cost.
•
ESTIMATE OF COST
Decrease - Negotiated Items
Item No. Description T Quantity Unit Price Amount
2521.501 4" Conc. Walk S.F. 23,758 $ 2.25 $53,455.50
Subtotal Decrease $53,455.50
•
08/09/2007 16:02 FAX 6514064724 MN DOT /MENDOTA HTS
., . rvvi �i1.J I �vnvn VVIVVII \VVIIVIV 1NIYIrtlYTLQ A "
Mn/DOT TP.2460.0112 -92)
Lj 002
IVo.411/j Y. jpa
SHEET 2 OF 2 SHEETS
State of Minnesota - Department of Transportation
CHANGE ORDER # 2
Contractor: Lunda Construction Co.
Address: 15601 Clayton Avenue S.
Rosemount, MN 55068
State Project No.: 0280 -55
Contract No. Z07502
Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr.
Jn ascendance with the cams of this Contract, you are hcroby authorized and instruotad to perform the Work as altered by the following provisions.
JBcrease - Negotiated Items
Item No.
2504.601
2505.602
2521.501
2521.501
2565.602
2565.603
2565.603
2571.505
• 2571.507
2575.607
2575.607
pescriptiott
Irrigation System
Service Meter Conn.
4" Conc. Walls Special
6" Gans, Walk Special
Pedestal Pole & Base
1.25" NMC
3/C #10
Deciduous Shrub 2'
Perennials
Mulch Mat'l Type Spec.
Select Topsoil Borrow
Schedule 80 4" PVC Pipe
ail Quantity T.Itht Price Amount
L.S. 48,400 548,400.00 548,400.00
E. 3 3,900.00 11,700.00
S,.F. 9,274 4.81 44,607.94
S.F. 793 5.87 4,654.91
Ea. 2 5,600.00 11,200.00
L.F. 410 5.75 2,357.S0
L.F. 410 1,95 801.36
Shrub 1,196 32.25 38,571.00
Plant 3,699 9.25 34,215.75
C.Y. 142 60.00 8,520.00
C.Y. 732 12.00 8,784.00
L.F. 215 11.25 ?,418,75
Subtotal Inorease 5216,231.21
Prime Contractor Allowance ® 10% first 550,000.00 $ 5,000.00
Prime Contractor Allowance ® 2% remaining $ 3,324.62
Distribution: S.P. 0280 -55 Group 01 -100%
CHANGE IN CONTRACT TAE
Due to this change the Conttaot Time
a. Is increased ( ) by Working Days
is decreased ( ) by Worldgg Days
Is ittcaeased () by Calendar Days
Is decreased ( ) by Calendar Days
b. Is not changed (X )
Total Increase
Issued By.
Proict/Resid
8171,100.33
Approved By:
City of Lino Lakes
Date
Approved By:
c. May be revised if the work affected Anoka County
the controlling operation ( )
Accepted By:
Contractor's Authorivad Representative Date
Dart
Original to Project Engineer; copies to Contractor, City of, Lino Lakes, Anoka County
- I4