Loading...
HomeMy WebLinkAbout2007-142 Council Resolution• Council Member REINERT introduced the following resolution and moved its adoption: CITY OF LINO LAKES RESOLUTION 07 -142 APPROVING A CONDITIONAL USE PERMIT FOR A PLANNED UNIT DEVELOPMENT AND A PUD DEVELOPMENT PLAN/PRELIMINARY PLAT FOR MOON MARSH WHEREAS, the Lino Lakes City Council makes the following findings: Findings 1. The City has received an application for a Conditional Use Permit (CUP) for a rural residential planned unit development (PUD) and a development stage plan/preliminary plat for the PUD. 2. The site includes approximately 25 acres. 3. The Comprehensive Plan guides the site for Rural land use. The site is not within the existing Metropolitan Urban Service Area or the Stage 1 (pre -2010) growth area or the Stage 2 (2010 -2020) growth area. 4. The Comprehensive Plan includes a policies stating that "density incentives may be considered in conjunction with a rural cluster subdivision that produces permanent open space" and to "promote rural residential clustering as a means of preserving greater amounts of open space or agricultural active lands." 5. To implement these policies, Section 2, Subd. 10 of the zoning ordinance provides for a rural residential PUD with a common septic system to have up to 8 units per 40 acres. This allows for 4 units on 20 acres. Such a PUD can be applied only outside of areas guided for municipal utilities (Stage 1 and Stage 2 growth areas) as identified within the Comprehensive Plan. 6. The Planning & Zoning Board opened the public hearing on July 11, continued it, and on August 8 voted unanimously to recommend approval of the project with conditions. NOW, THEREFORE, BE IT RESOLVED that the Lino Lakes City Council hereby approves the application for a Conditional Use Permit (CUP) for a rural residential • planned unit development (PUD) and a development stage plan/preliminary plat for the PUD for Moon Marsh. BE IT FURTHER RESOLVED that the following conditions of approval shall apply: The following conditions of approval should apply: • 1. The onsite sewage treatment system shall comply with all requirements of MN Rules 7080 and all other applicable laws. The final design must be submitted for review and obtain approval prior to site work commencing or final plat approval. 2. A monitoring and maintenance plan for the community sewage treatment system must be prepared and submitted to the City prior to site work commencing or final plat approval. A monitoring and maintenance plan must be kept in place by the property owners at all times and submitted to the City for review upon City request. This requirement shall be recorded against the property. 3. The right of way for the east 33 feet of East Rondeau Lake Road shall be dedicated with the plat. 4. Park dedication shall be paid in accordance with City policy in effect at the time of preliminary plat approval by the City Council. 5. A permit shall be obtained from the Rice Creek Watershed District prior to site work and the project must comply with all permit conditions. 6. Clearing of vegetation for sightline safety at the intersections of the private loop road and East Rondeau Lake Road shall be examined and determined as part of final plans and shall be completed with site work or when the loop road is constructed. Property owners shall ensure the designated area remains clear of vegetation. 7. A conservation easement covering Outlots C, D, and E and parts of Block 2 shall be dedicated to the City. The conservation easement shall provide for the possibility of future ecological restoration work, to be determined by future agreement between property owners and the City. The easement document shall include the requirement for signs delineating the easement. Specifics conditions of the easement shall be listed in an easement document that is executed and submitted to the City prior to approval of the final plat. The easement area shall be protected during site disturbance. 8. Homeowners' association documents shall be submitted for City review prior to final plat approval. The declaration of covenants, restrictions, easements, or other documents must provide for the common ownership, protection, and maintenance of the outlots, private road, community septic system, intersection sight lines, and other elements necessary to the health, safety, and welfare of the general public and the Resolution 07 -142, page 2 of 3 1 • • residents of the project. Homeowners' association documents must include recognition of the conservation easement. 9. The City Engineer's review comments of the August 17 and 20, 2007 memos must be addressed to his satisfaction. 10. There shall be provisions in the development agreement, homeowners association documents, and/or other appropriate documents to enable the City to step in and effect repairs to the community wastewater treatment facilities if the owner fails to maintain it, and assess the cost to the property owners without challenge by the property owners. This is not intended to give responsibility for maintenance to the City but to allow the City to act in emergency situations. This requirement is intended to protect public health and safety. These provisions shall be executed before work begins on the wastewater facilities. This requirement shall be recorded against the property. Adopted by the Lino Lakes City Council this 10th day of September , 2007. ATTEST: Bartell, City Cler Adopted by the Lino Lakes City Council thislOth day of September , 2007. The motion for the adoption of the foregoing resolution was duly seconded by Council Member O'Donnell and upon vote being taken thereon, the following voted in favor thereof: Reinert, O'Donnell, Carlson, Stoltz, Bergeson The following voted against same: none Whereupon said resolution was declared duly passed and adopted. Resolution 07 -142, page 3 of 3 • • • AGENDA ITEM 6 C STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: BACKGROUND Jeff Smyser September 10, 2007 Resolution 07 -142 Conditional Use Permit for Planned Unit Development and PUD Development Plan/Preliminary Plat Moon Marsh, Brian Wessel Mr. Brian Wessel has submitted a proposal for a rural development called Moon Marsh. The proposal includes four residential lots on 25 acres of property. Mr. and Ms. Wessel currently reside in the existing home on the site. The project would create three more residential lots with a private loop road, a community sewage treatment system, and 12 acres of open space . Though the normal density in rural areas is one lot per ten acres, the zoning ordinance allows for up to eight units on forty acres in a PUD with a common septic system. (This translates to four units on the 25 -acre Wessel site.) This is allowed only in areas outside the growth areas defined in the Comprehensive Plan. The purpose is to provide for some development that preserves open space in areas that will not have municipal utilities. The zoning ordinance defines two types of PUD: rezoning and conditional use permit. A rural residential PUD can be approved as a conditional use permit. The site is within the area analyzed by the I -35E Alternative Urban Areawide Review (AUAR). The AUAR's mitigation plan requires some information and review criteria that are not normally applied to development projects elsewhere in the community. ANALYSIS The following summarizes the project proposal: Gross Site Area Upland Area Lots Gross Density Net Density 25.3 acres 11.1 acres 4 0.16 units /acre 1.26 units /acre • • • Moon Marsh page 2 Comprehensive Plan, Land Use, Zoning Location Existing Land Use Guided Land Use (Comp. Plan) Zoning Site rural residential Rural Rural North rural residential City of Columbus: Rural Res. /Agricul. City of Columbus: Rural Residential South regional park reserve Rural Rural East regional park reserve Rural Rural West rural Rural Rural Comprehensive Plan: The Comprehensive Plan guides the project site for Rural land use. The site is outside of both Stage 1 (pre -2010) and Stage 2 (pre -2020) growth areas and is well outside the Metropolitan Urban Service Area (MUSA). The Comprehensive Plan includes a policy stating that "density incentives may be considered in conjunction with a rural cluster subdivision that produces permanent open space." Another policy is to "promote rural residential clustering as a means of preserving greater amounts of open space or agricultural active lands." To implement these, the zoning ordinance provides for a rural residential PUD with a common septic system. A rural PUD must have at least 50% open space. The proposal includes 51% open space (Outlots C, D, and E). Rural residential PUDs are only allowed in areas such as this that are outside of planned growth areas. This is because growth areas are planned for municipal utilities and should be reserved for urban density growth. Our standard requirement that rural lots must be 10 acres is a way to hold areas for more dense development when utilities are available. In an area where there will be no utilities, even long term, there is no need to protect efficient service provision. The most important issue is ensuring enough land for onsite septic systems. A common treatment area (drainfield) is an option that eliminates the need for primary and secondary drainfield areas on each lot. Growth Management: The Growth Management Policy (Ordinance No. 24 -04) limits the number of dwelling units that can be approved far platting annually. There are fewer than 80 units approved for 2007, leaving about 60+ for this year. The Moon Marsh project would create three new lots. The project includes several nature - friendly design elements, but this is not a "conservation development" as we typically use the term. It does not have a formally adopted stewardship (management) plan. Because we have ample units remaining for 2007 and this project creates only three new lots, there is no need to exempt the project from the annual limit Zoning: The site is zoned Rural. The normal lot size requirement is 10 acres, and there are shoreland requirements to consider. However, a rural residential PUD with a common septic system can have up to eight units per 40 acres, or four per 20 acres. There is a minimum lot size of 25,000 sf for such a project. Moon Marsh page 3 Rural Zone Shoreland: (sewered, nonriparian lot) PUD with common septic Proposed PUD lot size minimum 10,800 25,000 sf 33,000 sf to 93,000 sf lot width 80' 100' 250'+ along private road building setbacks from street rear lot line side lot line from OHWL bldg. height 10' 10' 150' 35' 36' 25' same as zoning at project periphery 25' from private road 30' 15' 500'+ per underlying reqs. impervious max. 65% 30% <20% (estimated) min. open space 50% 51% Shoreland: Shoreland overlay zoning covers land within 1000 feet of the Ordinary High Water Level (OHWL) of Rondeau Lake, classified as a "natural environment lake ". A shoreland overlay also applies within 300 feet of Rice Creek, but the creek is about 500 feet to the east. The OHWL for Rondeau Lake has not been determined. Lacking a specific determination, examination of the treeline often is used as the alternative method. The treeline is 100 -150 feet west of the road. By this reckoning, the Wessel property is within the shoreland overlay. However, shoreland requirements will have little effect on the site. Since all the proposed home sites are on the eastern part of the property, shoreland setbacks from the OHWL will not affect the proposal. The nearest building site will be more than 400' from the public roadway, well beyond the required 150' setback from the OHWL. There are no lakeshore lots, so visibility from the lake is not an issue. The shoreland ordinance was written well before current community septic systems technology, so lot sizes addressed only individual septic systems and municipal utilities. The current technology treats wastewater better than the typical public treatment plant. We are considering the "sewered" lot size in the shoreland ordinance as the appropriate one. There are no steep slopes on the property, so erosion down a bank into the lake or anywhere else is not a significant issue. In fact, very little site disturbance is proposed on the western part of the site. The ends of the private loop road and some culvert work are the only excavation activities near East Rondeau Lake Road. The site drains into Rice Creek and then to Peltier Lake and the chain of lakes, so water quality issues are pertinent. There are rain gardens designed into the project. The City has requirements for minimizing erosion that apply to all construction projects. In addition, the Rice Creek Watershed District examines and regulates impacts on wetlands and water quality. We forwarded the initial submittal to the MnDNR in January. An e -mail from MnDNR states they have no concerns and have the following comments: Moon Marsh page 4 1. The proposed density falls easily within the statewide guidelines for development in shoreland areas. This entire parcel is within the shoreland district of Rondeau Lake. 2. The preservation of the open space, the filtration basins, and the curbless road section help lower this project's impact on the landscape. 3. The community septic system is not a concern if it will be monitored and maintained on a regular basis by a responsible party that has experience in the upkeep of similar utilities. Alternative Urban Areawide Review (AUAR): This site is within the area analyzed by the I -35E Corridor AUAR. Development within the area is subject to the mitigation plan adopted with the AUAR. The mitigation plan includes some specific, quantified requirements, but many of the requirements are means of achieving the best results possible, depending on the site. Conservation Development Framework: The Conservation Development Framework provides the foundation for most of the conservation objectives within the AUAR area. Implementation of the Framework will: conserve the most ecologically significant natural resources within the AUAR area (in particular, the "core" and "outlier" habitats); protect ecologically significant natural resources from adjacent land uses by implementing buffering; and connect ecologically significant natural resources via multi- functional greenway corridors. The goals of the Conservation Development Framework will be pursued through a variety of methods. The maps in the AUAR provide summary information and guidance. For example, the Minnesota Land Cover Classification System map (AUAR Fig. 10 -1) shows several cover types. The upland area where the new lots would be are classified as planted or cultivated vegetation, relating to the agriculture that has occurred. The existing driveway and house site show as artificial surfaces and associated areas. The western part, which corresponds to the large Outlot D wetland, is herbaceous and there are small forest areas where the wetlands are in the proposed Outlots E and C. These latter areas hold promise for preservation and merit special attention. The Wetland/Aquatic and Upland Habitats map (AUAR Fig. 10 -2) show the west wetland area as core wetland & aquatic habitat. It is these core areas that we want to preserve. Large core habitat areas can provide habitat for a wide range of wetland - dependent and aquatic species as well as rare natural features. Therefore, the larger wetland area as well as the other outlots will be protected with a conservation easement. This will preserve land adjacent to larger, off -site greenway areas to the east and south, which are part of the regional park. The conservation easement should provide for the possibility of future restoration work. Water quality, stormwater management, erosion and sedimentation: The AUAR includes analyses of surface water runoff issues which lead to requirements for including • • • Moon Marsh page 5 infiltration elements and other techniques. It also includes estimated stormwater management recommendations for specific development areas. These estimates in the AUAR cannot be considered strict requirements because they were broad and based on general soil types and assumptions about impervious areas related to development. However, they do provide some guidance . The most general estimate is that 0 % -5% of the developable area would be needed for stormwater management (AUAR Fig. 17 -3). On a little less general estimate, the Moon Marsh site is labeled development area A -FR, with an estimated need of 0.13 acre (5660 sf) for stormwater management (AUAR Table 17 -5). The specific analysis and design for the project includes 4200 sf as infiltration basins. This falls within the broad estimate range and, considering the scale of the site, is comparable to the less broad estimate. The AUAR requires that runoff rates will be at or below pre- development conditions. This is a standard requirement everywhere in the city, enforced on all projects. The AUAR also requires that runoff volume be no more that 150% of pre - development runoff. The proposed design meets this requirement. Archaeological Survey: A Phase 1 archaeological survey was completed for the site and submitted with the project, as required by the AUAR. Records include an identified site to the east, but only low density artifact scatter was found on the Wessel site. The survey investigator does not recommend further evaluation. Rare Plant Survey: The AUAR mitigation plan states that due to the incidence of rare plant species in nearby wetland habitats, the City will require rare plant surveys and the mapping of rare plant locations prior to disturbance of areas of certain soil characteristics. The project site includes these soils. A rare plant survey is required and was performed on June 26. Several of the higher quality wetland habitats within the site contain suitable habitats for select rare plant species. However, no state - listed or otherwise rare plant species were detected. Planned Unit Development Section 2, Subd. 10. of the zoning ordinance includes the PUD standards. The zoning ordinance provides for two types of PUD. We have used a rezoning PUD on mixed use projects and others with exceptional design issues such as conservation developments in urbanized areas (with city utilities). We also have a provision for a conditional use permit for a PUD. A rural residential PUD is specifically designated for the conditional use permit PUD option. It is important to review the purpose and intent of a PUD. The following passages are taken from the zoning ordinance. Subd. 10. PUD, Planned Unit Development. A. Purpose and Intent. The purpose of this section of the Zoning Ordinance is to provide for the grouping of lots or buildings for development as an integrated, coordinated unit as opposed to traditional parcel by parcel, piecemeal, or sporadic approach to development. This section is intended to introduce flexibility of site design and architecture for the conservation of land and -open space through clustering of lots, buildings and activities, which Moon Marsh page 6 promote the goals outlined in the Comprehensive Plan or serve another public purpose. It is further intended that planned unit developments are to be characterized by central management, integrated planning and architecture, joint and common use and maintenance of parking, open space and other similar facilities, and harmonious selection and efficient distribution of uses. ... The PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: 1. A development pattern in harmony with the objectives of the Comprehensive Plan. 2. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 3. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. 4. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. 5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. 6. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. C. Rural Residential Planned Unit Development Requirements. 1. Purpose. It is the intent of this section to establish special requirements for the granting of a conditional use permit for rural (without City water or sanitary sewer) residential conservation subdivision PUD project in order to promote: a Preservation of productive land for agricultural use. b. Preservation of wildlife habitat and unique natural resources. c. Reduction of negative impacts on the environment. d. Creation of common open space that provides a unified landscape for the use and enjoyment of the neighborhood community and /or the general public. e. A variety of rural residential lot sizes, configurations, and neighborhoods. Density: Normal density in the Rural land use category is one unit per ten acres. However, the PUD standards allow eight units per forty acres in a subdivision that is served by a community sewer system that is approved by the Minnesota Pollution Control Agency (MPCA). Lots: The lots are clustered to avoid wetland impacts and provide efficient access to the community septic absorption field. The effect is a small neighborhood that is so isolated from the public road it will hardly be visible. • • Moon Marsh page 7 There will be easements that extend 10' around the wetlands. Some adjustments were made to the first layout to increase protection of the conservation areas. The house pads on two lots were revised to provide more use of the yard around the house without encroaching on the easements (L2 B2 and L1 B3). In addition, the western border of Lots 1 & 2, Block 2 were moved eastward, increasing the area within the outlot versus land within the lots. Removing this area from individual lot ownership is one way to help protect the wetland. Water: Each home will have individual wells for water. The wells must meet minimum separations from septic system facilities. This will be addressed with well permits from the MN Dept. of Health. Sewage Treatment: The development uses a sophisticated sewage treatment system that includes both individual treatment and a community mound. Most treatment will occur within the multiple tank- and - treatment facilities on each lot. This allows for monitoring and maintenance of individual lots without interfering with the elements of the system used by all lots. It also minimizes the treatment that is needed in the common mound absorption field. The fmal design details will be reviewed when the final complete design is submitted, which will be required before any site work begins or the fmal plat is approved, whichever comes first. Wetlands and Stormwater Management: The Rice Creek Watershed District (RCWD) has approved the delineation of the wetlands on the site and the mitigation plan. The wetland complex to the east of the site, which corresponds with Rick Creek, is DNR protected wetland 740W. Wetland #4 in the southeast corner of the Moon Marsh site is part of this complex. • The proposal would fill 4200 sf of wetland along the roads and mitigate this with 4200 sf of new wetland and 4200 sf of public value credits in the form of infiltration basins. The design and implementation must comply with RCWD requirements. total acres wetland acres upland acres Lot 1, Block 1 2.63 0.48 2.15 Lot 1, Block 2 2.00 1.13 0.87 Lot 2, Block 2 2.00 1.24 0.76 Lot 1, Block 3 2.00 0.90 1.10 Outlot A (septic site) 1.03 0.00 1.03 Outlot B (private road) 2.78 0.32 2.46 Outlot C 2.10 1.31 0.79 Outlot D 6.43 6.20 0.23 Outlot E 3.26 2.52 0.74 E Rondeau Lk Rd ROW to be dedicated 1.05 0.09 0.96 total 25.28 14.19 11.09 There will be easements that extend 10' around the wetlands. Some adjustments were made to the first layout to increase protection of the conservation areas. The house pads on two lots were revised to provide more use of the yard around the house without encroaching on the easements (L2 B2 and L1 B3). In addition, the western border of Lots 1 & 2, Block 2 were moved eastward, increasing the area within the outlot versus land within the lots. Removing this area from individual lot ownership is one way to help protect the wetland. Water: Each home will have individual wells for water. The wells must meet minimum separations from septic system facilities. This will be addressed with well permits from the MN Dept. of Health. Sewage Treatment: The development uses a sophisticated sewage treatment system that includes both individual treatment and a community mound. Most treatment will occur within the multiple tank- and - treatment facilities on each lot. This allows for monitoring and maintenance of individual lots without interfering with the elements of the system used by all lots. It also minimizes the treatment that is needed in the common mound absorption field. The fmal design details will be reviewed when the final complete design is submitted, which will be required before any site work begins or the fmal plat is approved, whichever comes first. Wetlands and Stormwater Management: The Rice Creek Watershed District (RCWD) has approved the delineation of the wetlands on the site and the mitigation plan. The wetland complex to the east of the site, which corresponds with Rick Creek, is DNR protected wetland 740W. Wetland #4 in the southeast corner of the Moon Marsh site is part of this complex. • The proposal would fill 4200 sf of wetland along the roads and mitigate this with 4200 sf of new wetland and 4200 sf of public value credits in the form of infiltration basins. The design and implementation must comply with RCWD requirements. • • • Moon Marsh page 8 Drainage and utility easements will be established that cover and extend 10' beyond the wetlands, in accordance with City requirements. Conservation easement locations will correspond to these drainage and utility easements. Two infiltration basins are proposed, one on the north side of the site along the road, one on the south side. Floodplain: The FEMA floodplain map shows much of the site within the 100 -year floodplain. The RCWD has determined the 100 -year elevation to be 887.5. Lowest floor elevations are at least two feet above this in accordance with City policy. There will be minor floodplain fill which will be addressed by excavating an area of equal volume to compensate (compensatory storage). Roads, Access, Traffic: The proposal extends the existing driveway on the south part of the site to become a private loop road with another access onto East Rondeau Lake Road. This private road serves all four lots. Because heavy vegetation can block sightlines, a certain area should be cleared where the loop accesses East Rondeau Lake Road. The right of way for the east 33 feet of East Rondeau Lake Road will be dedicated with the plat. The road is an easement now. This will be clarified with the title search that will be necessary for a final plat. The creation of three new residential lots will not create a traffic generation problem. Park Plan and Dedication: The parks plan shows Natural Resource Protection Areas corresponding to the locations of wetlands as revealed by the wetland delineation. These are wetland areas that will be protected by existing wetland law or may be important plant communities. They will be covered by a conservation easement as well as a drainage and utility easement. The Natural Resource Conservation Areas are uplands with features that have high ecological value. These areas should be examined for the potential for protection. The rare plant survey found no rare species in the uplands on the site, and most of these areas have been disturbed by past use. Park dedication will be cash in the amount of $2075 for each of the three new lots, for a total of $6225. ENVIRONMENTAL BOARD ACTION The Environmental Board reviewed the project on June 27t. Their comments are attached. Overall, the Environmental Board was positive about the project. Moon Marsh page 9 PLANNING & ZONING BOARD The P & Z opened the public hearing on July 11, continued it, and on August 8 voted unanimously to recommend approval of the project with conditions. The conditions are included in Resolution 07 -142.. OPTIONS 1. Approve Resolution 07 -142, which approves the application with conditions. 2. Deny the application. RECOMMENDATION Option 1 This review is based on the following submittals: 1. Preliminary Plat, revised 7/25/07, rec'd July 27, 2007 2. Existing Conditions, 6/1/07, rec'd July 27, 2007 3. Street Plan and Profile, revised 7/24/07, rec'd July 27, 2007 4. Street Cross Sections, 6/1/07, rec'd June 8, 2007 5. Storm Water Pollution Prevention Notes, revised 7/24/07, rec'd July 27, 2007 6. Notes and Details, revised 7/24/07, rec'd July 27, 2007 7. Archaeological Survey Report, November 21, 2006, rec'd January 18, 2007 8. Rare Plant Survey Results Letter From Critical Connections Ecological Services, June 28, 2007 9. Letter from Steven B. Schirmers, S -P Testing, Inc., July 27, 2007, regarding valves in mound system • • LOTS /UNITS as of 6/21/07 Development Name approved prelim. plats Preliminary Plat year end 2002 2003 2004 2005 2006 2007 2008 2009 2003 -09 maximum: 1029 total Stoneybrook 103 51 0 2nd Addn 0 52 52 Century Farms North 249 56 65 52 43 33 249 Keefe: prel plat, not final plat 1 1 1 Morton (minor subdiv) 0 1 0 1 Ravens Hollow 56 0 56 56 Haley Manor (10 new lots) 10 10 0 10 Crystal Cove 3 3 0 3 Millers Crossroads 152 22 47 51 32 152 Lakeview Estates (2 new) 2 2 2 Snell (minor subdivision) 0 1 1 Pheasant Hills Pres. 13th 1 1 1 Justin's Preserve 1 1 1 Marshan Estates 4 4 4 Rice Creek Church duplex 2 2 2 Rice Church: Oakwood View 10 10 10 Junes Addn 2 2 2 Highland Meadows East 2nd 18 18 18 Marshan Townhomes 2nd 23 23 Pheasant Hills 12th island 8 8 8 West Shadow Ponds 2nd Add 1 1 1 Vaughan Addition 5 5 5 Angie's Acres (1 new) 1 1 1 Marshan Lakeview (2 new) 2 2 2 Marshan Meadows 20 20 20 Pine Glen 72 40 32 72 • • Moon 41k, page 11 LOTS /UNITS as of 6/21/07 Development Name approved prelim. plats Preliminary Plat year end 2002 2003 2004 2005 2006 2007 2008 2009 2003 -09 maximum: 1029 Cavegn (1 new lot) 1 1 1 Golden Acre (3 new lots) 3 3 3 Fran's Estate (1 new lot) 1 1 1 Cox Estate (1 new lot) 1 1 1 Grandview 7 7 7 Moon Marsh 3 new 3 3 total 51 148 176 171 141 77 713 remaining of annual 147 remaining of 1029 units for pre -2010 -1 -29 -24 6 70 147 147 316 • • COMPREHENSIVE PLAN PROPOSED LAND USE, (detail) COMPREHENSIVE PLAN PROPOSED LAND USE, AUAR BORDER, AND FUTURE ROADS (detail of AUAR Figure 6 -2: Scenario 1) MOON MARSH SITE AUAR STUDY AREA • • ZONING MAP (detail) MOON ��➢ MARSH SITE l 1 r r ti!t