HomeMy WebLinkAbout2007-150 Council ResolutionCouncil Member Reinert
moved for adoption of the following ordinance:
CITY OF LINO LAKES
RESOLUTION NO. 07-150
RESOLUTION ACCEPTING FEASIBILITY REPORT — WATER TREATMENT
PLANT
WHEREAS, pursuant to resolutions of the Council, a study has been prepared by the City
Engineer, with reference to the water treatment plant feasibility study, received by the
City Council September 24, 2007, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF LINO LAKES, MINNESOTA:
1. That such the Water Treatment Plant Feasibility Study, a copy of which is attached
hereto and made part hereof, is hereby accepted.
•
Adopted by the Lino Lakes City Council this 24th day of September, 2007.
The motion for the adoption of the foregoing ordinance was duly seconded by Council
Member o' Donne 1 nd upon vote being taken thereon, the following voted in favor
thereof: Reinert, O'Donnell, Carlson, Stoltz, Bergeson
The following voted against same: none
Whereupon saidresoiuti_owas declared duly passed and adopted.
•
•
•
STAFF ORIGINATOR:
CITY COUNCIL
MEETING DATE:
TOPIC:
ACTION REQUIRED:
BACKGROUND
AGENDA ITEM 6B
Jim Studenski, City Engineer
September 24, 2007
Resolution No. 07 -150, Accepting
Feasibility Report, Water Treatment Plant
3/5 Vote
Lino Lakes water supply is provided by the Jordan sandstone aquifer. This source is
considered abundant and meets all health requirements. The City does not treat its
water for iron and/or manganese removal, softening, or any other conventional
treatment processes. The City does provide chemical additions including disinfection
and fluoridation at the wellheads.
Blending of raw well water with treated water on peak days has been evaluated to
reduce treatment plant size. Blending is accomplished on peak days by sending 75 to
80 percent of the raw water supply through the treatment plant and using a bypass line
to allow 20 to 25 percent of the raw water to go directly to the water storage for
blending. The proposed water treatment plant is an ideal candidate for blending
because the raw water supplied to the treatment plant from the wells does not carry
contaminants which cause health related issues. During recent years several metro
communities have begun to use blending to reduce water treatment plant capacity. By
using the blending of raw well water with treated water, the City can be served by a
single treatment plant.
The treatment feasibility study utilizes two types of treatment technology and proposes
two different plant layouts, based on the space needs that each technology requires.
The acreage needed at the two proposed site locations was determined based on those
plant layouts.
At this time health requirements and resident complaints do not warrant treatment.
However, due to the complexities of a water treatment facility and efficient integration
of a facility into the City's system of pipes, wells and storage, advanced planning is
necessary. The study addresses water quality, future water demands, site selection,
plant floor plan options, future infrastructure needs, and financing / funding
alternatives.
Attached is the Water Treatment Plant Feasibility Study, dated September 17, 2007.
•
Capital Improvement Program:
The water treatment complex cost (including engineering, administrative, and financing
costs) are estimated at $12,050,000, this cost includes $3,000,000 for construction of
the ground storage tank, booster station and well no. 7 and $9,050,000 for the
construction of the treatment plant. The additional wells, well houses and raw
watermain are estimated to cost $4,825,000. The cost of the distribution system
improvements is estimated to be $2,895,000.
As the water treatment plant would provide substantial benefit for the existing water
customers, water rate increases could be utilized to fund a portion of the project. The
remainder of the costs could be funded by a water availability charge for new
connections.
The capital improvement program phases in the wells and watermains as needed for
population growth. It also shows the centralized storage reservoir and booster station
being built in the 2010 to 2012 time period when more storage is necessary. Using the
capital improvement program and system layout, the treatment plant can be added in
the future and is shown in 2017. The detailed capital improvement program can be
found on page 26 of the attached water treatment plant feasibility study.
RECOMMENDATION
Staff recommends approving Resolution No. 07 -150, accepting the Water Treatment
Plant Feasibility Study.