HomeMy WebLinkAbout2007-170 Council Resolution•
•
Council MembeP'Donnellintroduced the following resolution and moved its adoption:
CITY OF LINO LAKES
RESOLUTION NO. 07 -170
RESOLUTION APPROVING CHANGE ORDER NO. 6
LAKE DRIVE /135W IMPROVEMENT PROJECT
WHEREAS, pursuant to the resolution of the City Council adopted May 14, 2007, the City
awarded the construction contract for the Lake Drive /I -35W Improvement Project to Lunda
Construction Company, and
WHEREAS, construction plans identified an existing 4" Rigid Steel Conduit (R.S.C.) in place for
the use as part of the Signal System "A" installation at Town Center Parkway and Lake Drive,
and
WHEREAS, it has been determined that the existing R.S.C. is installed at a depth that made it
obsolete to be incorporated into Signal System "A "; and
WHEREAS, the Project Engineer has determined that a new 4" R.S.C. is required to be
installed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO
LAKES, MINNESOTA:
1. Change Order No.6, in the amount of $3,850.00, is hereby approved.
Jufanne Bartel , C Ierk
Adopted by the Lino Lakes City Council this 8th day of October, 2007
The motion for the adoption of the foregoing resolution was duly seconded by Council
Member Carlson and upon vote being taken thereon, the following voted in favor
thereof:
O'Donnell, Carlson, Reinert, Stoltz, Bergeson.
The following voted against same:
none
Whereupon said resolution was declared duly passed and adopted.
•
AGENDA ITEM 6F
STAFF ORIGINATOR: Michael Grochala
CITY COUNCIL
MEETING DATE: October 8, 2007
TOPIC: Resolution No. 07 -143, Approving Change Order No.
6, Lake Drive /35W Improvement Project
VOTE REQUIRED: 3/5 Vote Required
BACKGROUND:
On May 14, 2007 the City Council awarded the Lake Drive /I -35W Improvement Project
to Lunda Construction Company in the amount of $7,531,701.71. Construction is
underway with paving completed on the northbound lanes south of the bridge. The
bridge beams have been set on the east side and the deck pour is scheduled for the
week of October 8. Paving of the northbound lanes, north of the bridge, the cul de sac
and the northbound on ramp are tentatively scheduled for the weekend of October 20.
Change Order No. 6 is related to the installation of traffic control signals at Town Center
• Parkway and Lake Drive. An existing 4" Rigid Steel Conduit (R.S.C.) underneath Town
Center Parkway was proposed for use with the signal system wiring. However, it has
been determined that the existing conduit cannot be incorporated into the signal
installation. As such a new 4" R.S.C. is required to be installed. The total cost of
Change Order No. 6 is $3,850.00.
RECOMMENDATION:
Staff is recommending approval of Resolution No. 07 -170.
ATTACHMENTS
1. Resolution No. 07 -170
2. Change Order No. 6
10/01/2007 12:19 FAX 6514064724 MN DOT /MENDOTA HTS
•
•
Mn /DOT TP -2460 -0112 -92)
002
SHEET 1 OF 1 SHEETS
State of Minnesota - Department of Transportation
CHANGE ORDER # 6
Contractor: Lunda Construction Co.
Address: 15601 Clayton Avenue S.
Rosemount, MN 55068
State Project No.: 0280 -55
Contract No. Z07502
Location: In Lino Lakes on CSAH 23 (Lake Dr.) From 1000 ft. south of Town Center Parkway to Apollo Dr.
In accordance with the terms of this Contract, you are hereby authorized and instructed to perform the Work as altered by the following provisions.
The construction plans on sheet 130 of 198 show the location of the existing 4" R.S.C. in place between H.H. 8 thru H.H.
10 located as part of Signal System "A" of Town Center Parkway and. C.S.A.H. 23.
In the field it was discovered that the 4" R.S.C. was installed at a depth that made it obsolete to be incorporated into
Signal System "A ". The Project Engineer has determined that a new 4" R.S.C. shall be installed by directional boring.
This Change Order directs the Contractor to furnish all equipment, materials and labor necessary to construct the above
stated 4" R.S.C. between H.H 8 thru H.H. 10 of Signal System "A ".
All work will be performed in accordance with the pertinent portions of the Special Provisions, Mn/DOT Standard
Specifications, Mn/DOT Standard Plates and as directed by the Engineer.
Payment to the Contractor for this work will be at the negotiated prices, as shown below in the Estimate of Cost.
ESTIMATE OF COST
Item No. Description
4" R.S.C.
Directional Boring
10% Prime Contractor Included
Distribution: S.P. 0280 -55 Group 01 — 100%
CHANGE TN CONTRACT TIME
Due to this change the Contract Time:
a. Is increased ( ) by Working Days
Is decreased ( ) by Working Days
Is increased ( ) by Calendar Days
Is decreased ( ). by Calendar Days
b. Is not changed ( X )
c. May be revised if the work affected
the controlling operation ( )
Unit Quantity Unit Price Amount
FT
100 $38.50 $3.850.00
Total Increase $3,850.00
9-
Issued By: i _. 'I `
G,); iet/Resident / Engineer Datc
Approved By:
City of Lino Lakes
Approved By:
Anoka County
Date
Date
Accepted By: .�� 1. -27 1L . - 47
Contractor's Authorized Representative Date
Original to Project Engineer; copies to Contractor, City of Lino Lakes, Anoka County