HomeMy WebLinkAbout2004-008 Council ResolutionCITY OF LINO LAKES.
RESOLUTION NO. 04 -08
RESOLUTION AUTHORIZING THE PREPARATION OF PLANS AND
SPECIFICATIONS FOR HOLLY DRIVE STREET RECONSTRUCTION PROJECT.
WHEREAS, pursuant to resolutions of the Council adopted August 27, 2001, a study
has been prepared by the City Engineer, with reference to the improvement of 12th
Avenue/ Holly Drive Street Reconstruction by constructing Street, storm sewer, sanitary
sewer and watermain extensions; and
WHEREAS, the report provides information showing the proposed project is necessary,
cost- effective, and feasible; and
WHEREAS, the City's Engineer, TKDA, shall perform such services; and
WHEREAS, the City proposes to use. Municipal State Aid, Surface Water Management,
Trunk Area & Unit, and previous assessments for all of the cost of the improvements,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1 The City Engineer is designated as the engineer for this improvement and he is
directed to prepare plans and specifications for the Holly Drive Street Reconstruction
project.
Adopted by the Lino Lakes City Council this 12th day of January, 2004.
Joh Berg Jon, '- yor
Ann. Blair, Clerk
AGENDA ITEM 7H.
STAFF ORIGINATOR: James E. Studenski, City Engineer.
COUNCIL MEETING DATE: January 12, 2004
TOPIC: Resolution. No 04-08, Authorizing Preparation of Plans and
Specifications for Holly Drive Street. Reconstruction.
VOTE REQUIRED: Simple Majority
BACKGROUND:
Due to the continued development and growth of the area increasing the traffic
on this roadway and the deteriorating condition of 12th Avenue and Holly Drive
between Ash Street and Birch. Street, the City Council order a feasibility study for
the reconstruction of the street. The report was received at the October 28,
2002 Council meeting.
This segment of roadway is designated as a Municipal State Aid. Street and
serves as a minor collector within the City's Comprehensive Transportation Plan.
The feasibility proposed the improvements to be performed in three phases. The
first phase is from Holly Court to 12th Avenue. Through direction by the City
Council, the street improvements will consist of a City standard 32' roadway and
a separated 8.5' trail.
The street reconstruction portion of the project will be funded mostly through
Municipal State Aid. Funding will also come from the Trapper's Crossing
subdivision which was previously assessed $265,000.00 for the road
improvements. Surface Water Management and Trunk funds will complete the
funding for this project. The utility extensions will be minimal at this time.
It is staffs recommendation to authorize the preparation of plans and
specifications in the amount of $87,750.00 for the Holly Drive Reconstruction
project.
OPTIONS:.
1 Adopt. Resolution No. 04 -08, Authorizing the Preparation of Plans and
Specifications for the Holly Drive Reconstruction project.
2. Return to staff for further review.
RECOMMENDATION:
Option No. 1 Staff recommends that Resolution No. 04 -08 be adopted.