HomeMy WebLinkAbout2004-043 Council Resolution (2)CITY OF LINO LAKES
RESOLUTION NO. 04-43
RESOLUTION APPROVING THE FINAL PLAT FOR
CENTURY FARM NORTH 2°a ADDITION
AND
AMENDING HEIGHT RESTRICTIONS ADOPTED WITH RESOLUTION 03 -60
WHEREAS, a request has been submitted to the City for the approval of a final plat, and
WHEREAS, review and approvals of plats are governed by state statutes and City
ordinances, and
WHEREAS, the site is included in the Century Farm North preliminary plat approved by
the City Council on April 28, 2003, by Resolution 03 -60, and
WHEREAS, the preliminary plat approval included phasing of the development over
several years, and
WHEREAS, the final plat for Century Farm North 2"d Addition, received by the City
March 4, 2004 is consistent with that phasing plan and other City requirements, and
WHEREAS, it has been determined that height restrictions for structures within the
Century Farm North preliminary plat area included in condition #6 of Resolution 03 -60
should be revised to be consistent with MN Rules Ch. 8800;
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino
Lakes hereby approves the final plat for Century Farm North.
BE IT FURTHER RESOLVED, that no structure shall be constructed higher than the
imaginary surfaces depicted on the "Air Park Building Height Exhibit ", received by the
City on March 4, 2004, which replaces Condition #6 of Resolution 03 -60.
Adopted by the Lino Lakes City Council this oc % ^ day of Apr, , 2004.
Jo J. Berg son, Ma or
•
CENTURY FARM NORTH . 2ND .ADDITION
• NM= Na 11011211012 0004
n C NS tlwl um= omonis Nam
▪ • ODORS • 1n man b•NNlNO
PPE x4,00 +Nx NawRS 45.17,x•
• 01201 *MAO •sA
Doom Mum n.w•.7 OK •
rAN:
220 Y. c 31 N. A IS .
CITY OF LINO 3.
COUNTY OF AN A
SECTION 7, T31, R22
NORTH
BEARRIOS. ARE ASSWEO
GRAPHIC SCALE
N0 NJ. 1M DT IOC PIROR4 5nl CsaT Yam Nww W1M.nx Ina. • NiruN• 0a0.0110 No sow
. NA*. wr,. •.4n17 ••.Nma b w Mary d Asia f W d Wr4
•
0.1240. 0.110 0 w,1 DAM 11. COMM MIN N001. al b N0 ir.p .0 .. Na am d,esa
v. w.
Many Ara.w. •sb 0t larw
YC l +W w50 xwSDN'.w iwlwi. Mnswe .arasw�Mn r rL•lmwal a ww�lll�x ONOSI PAM I101tm !N
mu ya x AN veQ". :•+ +" r rl .N lar.al s d • r.O wit r Nan* / r er. r w aa.eb lwnO w w ei a.*
s.°•c"l
�•^'�� .. LIZ piXi11a Neer Dom `N7 Wr+W .. satyr a. wr w.. ma oat mar Zama wn
BST 014M
Wory Pubis. Coals Maw.
Crornbaba 400
Vas pal d COON . 0041 MOM 5N AXON 02012.2 K Oa 01 f N 0. 02y amass. 10a.W
• wumarNNwN d� b SNrW 0 M } bka wN Pa Canty 110 Wr.w hoe W ma. 07 Pe .b .
P�Oma 3S■,y and Ma +Tti dwM .Mi d• W •rr• r •.�rMwn s 0.0.00,0
laid SNwa. Las SO M. 5R1.
•
RECEIVED
[BAR 0 4 2004.
CITY OF LINO LAKE;
NOTE N0 IRxEEOTA 00PAR7NENT OF NAMPA. RESOURCES, 1101100 STATES CORPS Of
ENGINZERS AND OMEN WATER NANA0EIIENT AGENOES NAYS CATEGORIZED SAOImi5- '
WE11ANDS. TORCH ARE NOT ACKNOWLEDGED BY CHAPTER 30102. 000NS10N 1 mar
MINNESOTA STATUTES AND MAY NOT BE 41001 HEREON. 0E0EL0PN0NT Of LANDS
CONTAIN/1G SAIO YEMRDS -WY BE SUBJECT TO SPECIAL COMMONS 04 1lNTA0NN5.
mCamas 002010 -00 PW CHIP IBNI x2-2200 •
•
r .DIU °.3E9li?]3.T
. ! NOBNSImq
I0RI
.- w sNN1220law 110111-11a L m /e 5W0.
0001.00Ime•,law
•
SHEET •1 OF 2
Y FARM -NORTH 2ND ADDITION
NOTE THE MHWIESOTA DEPARTMENT OF NATA& RESOURCES. AOIED STATES CORPS OF .
ENGWEERS AND OTHER WATER MANAGEMENT AGENOES HAVE CATEGORIZED VARCOS . OW= 505.02. SUIRINISICM 1 OF
STRANDS. '411101 ANE MINNESOTA STATUTES AND TWYYA NOT �500501Y HEREON. 5EVFLOPNENT OF LAWS -
CONTAINING SAID SETEANDS MAY RE SUBJECT TO SPEC AL C01✓DITONS ON IDRTAIIDNS. -
NORTH
MEAPoIMS ARE MANED
GRAPHIC SCALE •
H¢T. EH..a as
- i
ar.g.RLLasL
tarots'''.
TTAl
1st ADDITION 3rd ADDITION
�' W1L W1NOiA•OAWE IIA.. 11.I6CY PlK � � _
22.3 R.
MS R.
II1 R.
r 1 r a r. ti r f.�- y sti 4,J,.vl_;1: i-�Y �f �.•�. / ti al commutei 100.
1 StOrt
('wry ww (� '- Q %J
}_ '��•.- y� .. 1 . // / MMdY t ISM • ffii SLOW ROPE d0 V
r i 4 i" / i ',fit' p v �► i *•�" ��
; ,
y; ��! mss` t or ,„!!. .' _.,,,, �� �'° ��u �x
,_al �. r�' �C -tee �L.�w r..�
, r h �" _i . - a4►����"; F ®�� ``���ppS jf'~ ��i/... IL w �7 �-- . �, �+'��' --� %J:�� ,-- `lLiii /l/ia. lLlli�1. �' �r� air 11(� .,r .. 3 ..- �.y � �� iL--k �iw „� a ,,+Av "°flews gill �J �'!�ll - -
// �a����� 1a�. 1_ 016;L/'ji- .o,�: 21. 12 i����1 .ln -,,�u .w z'*iS9�
:N"fi N.��a!llVl� �� �>.. -.�tf1 �ii� � tf~ l�il� i li`"�7711�0
!sri• -- ="--s�� 7 i+� �-� t1 iPa -���► sarJ� j� ��
-� _
C-?' r/Ari .4
, , „ , „.44't: 177-1-' ,-:'
, - / A / ,S '......_.„., =, 21 '----:'' --.:77 1- -
ty, /7 ,;,: ..„,
i..,,,..,c,a:,,,,i_gi.,..,.
....„,
” ---2: F. --x—•.11 �I 7111)..0.
!1\ 0
��
tie°, �tsc --ft� A v , EMEIH(IN!•
AGENDA ITEM 6. B. i.
STAFF ORIGINATOR: Jeff Smyser
C. C. MEETING DATE: April 26, 2004
TOPIC: Resolution 04 -43
Final Plat, Century Farm North 2 "d Addition
and
Amending Height Restriction Condition of
Approval of Resolution 03 -60
VOTE: 3/5
BACKGROUND
The preliminary plat for Century Farm North was approved by the City Council on April
28, 2003 with Resolution 03 -60. The approval includes a phasing plan as required by the
growth management ordinance. The final plat for phase 1 (56 units) was approved in
July. The developer has submitted the final plat for phase 2.
The submitted final plat includes individual lots for units in phase two of the approved
phasing plan. This includes 65 units: 22 single family detached townhomes, 42 single
family lots, and one single family lot for an existing house. This existing home was not
expected to remain when the phasing plan was approved. In order to comply with the
approved phasing plan, this lot must be counted as a new unit.
ANALYSIS
Because of the complexity of this project, each phase includes elements not necessarily
included in previous phases. The final plat for each phase must be compared against the
conditions of approval.
The final plat substantially conforms to the approved preliminary plat and phasing plan.
A title commitment has been approved by the City Attorney, along with the association
declarations and the partial release of the powerline easement.
A development contract is being prepared, and will include financial securities.
Conditions attached to approval of the preliminary plat (Resolution 03 -60):
Condition #4: "The submitted townhome housing types and building elevations be
modified to specify finish materials and be subject to City approval. Side walls facing
Century Farm North 2nd Addition Final Plat
page 2
public streets shall include windows or other architectural features to avoid the
appearance of a blank wall."
The City's townhome building material standards in the zoning ordinance state:
Exterior Building Finish: The exterior of townhome dwelling units shall include a
variation in building materials which are to be distributed throughout the building
facades and coordinated into the architectural design of the structure to create an
architecturally balanced appearance. In addition, townhome dwelling structures shall
comply with the following requirements:
a) A minimum of twenty -five (25) percent of the combined area of all building
facades of a structure shall have an exterior finish of brick, stucco and/or natural
or artificial stone.
b) Except for brick, stucco, and/or natural or artificial stone, no single building
facade shall have more than seventy -five (75) percent of one type of exterior
finish.
c) For the purpose of this section, the area of the building facade shall not include
area devoted to windows, entrance doors, garage doors, or roof areas.
The P & Z was concerned about a monotonous appearance to the development. We
discussed this at the subsequent work session on April 7h. After that discussion, the
developer submitted on April 9th four color and material options which satisfy the
ordinance requirements and the concerns of the P & Z.
Condition #6: The original approval included specific height restrictions to
protect air space for the private air park. The applicant is requesting revisions to these.
The revised building height plan includes a 7:1 "transitional surface" on the sides of the
runway and a 20:1 "approach surface" off the end of the runway. We have discussed the
proposed new restrictions with MnDOT Aeronautics. The new restrictions are more
complete and more in line with MnDOT recommendations.
Under MnDOT rules, the approach surface (off the end of runway) must be maintained
for the air park to continue having a license to operate. The transitional surface off the
sides of the runway is recommended, but not mandatory.
The City is not obligated to adopt these restrictions. It is in the air park's interest to do
so. Public entities have to purchase land or development rights around public airports to
maintain several safety zones. Placing restriction on the use of land to protect a private
airport is a different situation. The City's comprehensive plan does includes an objective
to adopt some airport zoning restrictions. This plat, with its new airpark lots that are part
of the airpark itself, offers the opportunity to do so without imposing restrictions on land
outside of the plat. These restrictions apply only to property within the Century Farm
North development.
Century Farm North 2 Addition Final Plat
page 3
Condition #10: This condition addresses park dedication for the plat. The park
trails are to run within a powerline easement. Since the trail will be a City park trail, we
wanted to make sure that the trail is allowable. The developer has negotiated with the
powerline easement holder, Great River Energy, to ensure that the trail is acceptable.
This was part of the negotiations over reducing the size of the easement. The easement
actually covered a much larger area and the developer negotiated to confine the easement.
PLANNING & ZONING BOARD
The P & Z recommended approval of the final plat at its March 10`s meeting.
OPTIONS.
1. Approve the final plat for Century Farm North, including the revision of Condition #6
of Resolution 03 -60, the height restrictions.
2. Table and return to staff with direction.
RECOMMENDATION
Option 1
This report is based on the following:
Final Plat, Century Farm North 2nd Addition, received March 4, 2004.
Air Park Building Height Exhibit, received March 4, 2004
Building Elevations: received March 26, 2004
Building Materials samples received April 9, 2004
Letter from Great River Energy of March 16, 2004 with
Partial Release of Easement signed March 12, 2004, rec'd March 26, 2004
Letter from Great River Energy of March 3, 2004, rec'd March 26, 2004