Loading...
HomeMy WebLinkAbout2004-044 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 04 -44 • RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — 62nd STREET RECONSTRUCTION PROJECT. • • WHEREAS, pursuant to an advertisement for bids for the construction of the 62nd Street Reconstruction project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Arnt Construction Co., Inc. $ 930,219.38 Central Landscaping, Inc. $ 936,304.39* F.M. Frattalone $ 954,475.11* Dresel Construction, Inc. $1,047,622.49 Forest Lake Contracting, Inc. $1,079,254.95 Three Rivers Construction $1,133,377.19 Engineer's Estimate $1,133,076.20 AND WHEREAS, it appears that Arnt Construction Co., Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Arnt Construction Co., Inc., in the name of the City of Lino Lakes for the construction of the 62nd Street Reconstruction project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the Lino Lakes City Council this 12' day of April 2004. Ann J( flair, City Clerk Joh J. Ber•=son, %ayor TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE ARNT CONSTRUCTION ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ���� ENGINEERS • ARCH! I NA S • PLANNERS CENTRAL LANDSCAPING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 1 2021.501 MOBILIZATION 1 LS $ 65,000.00 $ 65,000.00 $ 36,000.00 $ 36,000.00 $ 24,000.00 $ 24,000.00 2 2101.502 CLEARING 260 TR $ 115.00 $ 29,900.00 $ 40.00 $ 10,400.00 $ 12.50 $ 3,250.00 3 2101.507 GRUBBING 260 TR $ 100.00 $ 26,000.00 $ 22.00 $ 5,720.00 $ 12.50 $ 3,250.00 4 2104.501 REMOVE PIPE (CULVERT OR STORM SEWER) 331 LF $ 11.00 $ 3,641.00 $ 11.00 $ 3,641.00 $ 11.00 $ 3,641.00 5 2104.501 REMOVE CURB & GUTTER (ALL TYPES) 788 LF $ 3.00 $ 2,364.00 $ 2.00 $ 1,576.00 $ 4.00 $ 3,152.00 6 2104.501 REMOVE FENCE 1,061 LF $ 7.00 $ 7,427.00 $ 1.00 $ 1,061.00 $ 1.00 $ 1,061.00 7 2104.501 REMOVE WATERMAIN 5 LF $ 10.00 $ 50.00 $ 20.00 $ 100.00 $ 20.00 $ 100.00 8 2104.503 REMOVE CONCRETE PAVEMENT (DRIVEWAY) 220 SF $ 2.00 $ 440.00 $ 1.00 $ 220.00 $ 2.00 $ 440.00 9 2104.505 REMOVE BITUMINOUS SURFACING 13,706 SY $ 2.50 $ 34,265.00 $ 1.00 $ 13,706.00 $ 1.25 $ 17,132.50 10 2104.509 REMOVE SIGN TYPE C 1 EA $ 30.00 $ 30.00 $ 45.00 $ 45.00 $ 15.00 $ 15.00 11 2104.511 SAWCUT CONCRETE PAVEMENT (FULL DEPTH) 50 LF $ 5.00 $ 250.00 $ 3.00 $ 150.00 $ 5.00 $ 250.00 12 2104.513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) 430 LF $ 3.00 $ 1,290.00 $ 1.00 $ 430.00 $ 3.00 $ 1,290.00 13 2104.523 SALVAGE MAIL BOX SUPPORT 9 EA $ 65.00 $ 585.00 $ 50.00 $ 450.00 $ 25.00 $ 225.00 14 2104.523 SALVAGE SIGN 8 EA $ 30.00 $ 240.00 $ 25.00 $ 200.00 $ 15.00 $ 120.00 15 2104.523 SALVAGE GATE VALVE & BOX 1 EA $ 100.00 $ 100.00 $ 450.00 $ 450.00 $ 450.00 $ 450.00 16 2105.501 COMMON EXCAVATION 3,562 CY $ 7.00 $ 24,934.00 $ 9.36 $ 33,340.32 $ 6.65 $ 23,687.30 17 2105.505 MUCK EXCAVATION 5,574 CY $ 10.00 $ 55,740.00 $ 5.98 $ 33,332.52 $ 6.50 $ 36,231.00 18 2105.507 SUBGRADE EXCAVATION 2,000 CY $ 7.00 $ 14,000.00 $ 5.98 $ 11,960.00 $ 6.00 $ 12,000.00 19 2105.511 DITCH EXCAVATION 205 CY $ 9.00 $ 1,845.00 $ 7.40 $ 1,517.00 $ 7.00 $ 1,435.00 20 2105.522 SELECT GRANULAR BORROW (CV) (P) 11,530 CY $ 10.00 $ 115,300.00 $ 12.60 $ 145,278.00 $ 13.25 $ 152,772.50 21 2105.525 TOPSOIL BORROW (LV) 2,503 CY $ 9.00 $ '22,527.00 $ 0.01 $ 25.03 $ 9.00 $ 22,527.00 22 2105.603 CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) 3,000 LF $ 1.00 $ 3,000.00 $ 2.80 $ 8,400.00 $ 2.80 $ 8,400.00 23 2105.604 GEOTEXTILE FABRIC TYPE IV 855 SY $ 3.00 $ 2,565.00 $ 1.40 $ 1,197.00 $ 1.95 $ 1,667.25 24 2123.61 EXPLORATORY DIGGING 10 HR $ 300.00 $ 3,000.00 $ 300.00 $ 3,000.00 $ 300.00 $ 3,000.00 25 2211.501 AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & DRIVEWAY (100% CRUSHED) 10,669 TN $ 10.00 $ 106,690.00 $ 10.52 $ 112,237.88 $ 11.05 $ 117,892.45 26 2350.501 TYPE LV AGG. 3 WEARING COURSE (B) (STREET) 1,661 TN $ 34.00 $ 56,474.00 $ 31.00 $ 51,491.00 $ 29.85 $ 49,580.85 27 2350.501 TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) 411 TN $ 41.00 $ 16,851.00 $ 37.00 $ 15,207.00 $ 36.16 $ 14,861.76 28 2350.502 TYPE LV AGG. 3 NON - WEARING COURSE (B) (STREET) 1,822 TN $ 33.00 $ 53,526.00 $ 30.00 $ 48,660.00 $ 29.39 $ 47,670.58 29 2350.503 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAYS (B) 215 SY $ 12.00 $ 2,580.00 $ 12.00 $ 2,580.00 $ 16.50 $ 3,547.50 30 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 664 GAL $ 2.00 $ 1,328.00 $ 1.40 $ 929.60 $ 1.40 $ 929.60 31 2501.515 12" RC PIPE APRON W/ TRASH GUARD 1 EA $ 600.00 $ 600.00 $ 700.00 $ 700.00 $ 700.00 $ 700.00 32 2501.515 15" RC PIPE APRON W/ TRASH GUARD 14 EA $ 850.00 $ 9,100.00 $ 745.00 $ 10,430.00 $ 745.00 $ 10,430.00 33 2501.515 18" RC PIPE APRON W/ TRASH GUARD 1 EA $ 750.00 $ 750.00 $ 810.00 $ 810.00 $ 810.00 $ 810.00 34 2501.515 24" RC PIPE APRON W/ TRASH GUARD 2 EA $ 900.00 $ 1,800.00 $ 960.00 $ 1,920.00 $ 960.00 $ 1,920.00 35 2502.541 12" RC PIPE SEWER CLASS V DESIGN 3006 195 LF $ 27.00 $ 5,265.00 $ 19.00 $ 3,705.00 $ 19.00 $ 3,705.00 36 2503.541 15" RC PIPE SEWER CLASS V DESIGN 3006 1,129 LF $ 28.00 $ 31,612.00 $ 20.50 $ 23,144.50 $ 20.50 $ 23,144.50 37 2503.541 18" RC PIPE SEWER CLASS V DESIGN 3006 392 LF $ 30.00 $ 11 ,760.00 $ 23.00 $ 9,016.00 $ 23.00 $ 9,016.00 38 2503.541 24" RC PIPE SEWER CLASS III DESIGN 3006 71 LF $ 35.00 $ 2,485.00 $ 29.50 $ 2,094.50 $ 29.50 $ 2,094.50 39 2503.602 CONNECT TO EXISTING MANHOLES (SANITARY SEWER) 4 EA $ 400.00 $ 1,600.00 $ 1,850.00 $ 7,400.00 $ 1,850.00 $ 7,400.00 40 2503.602 CONNECT TO EXISTING MANHOLES (STORM SEWER) 2 EA $ 600.00 $ 1,200.00 $ 1,075.00 $ 2,150.00 $ 1,075.00 $ 2,150.00 41 2503.602 8 "X4" PVC WYE (SCHEDULE 40) 12 EA $ 85.00 $ 1,020.00 $ 70.00 $ 840.00 $ 70.00 $ 840.00 42 2503.602 8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) 384 LF $ 48.00 $ 18,432.00 $ 14.50 $ 5,568.00 $ 13.50 $ 5,184.00 43 2503.603 8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) 184 LF $ 50.00 $ 9,200.00 $ 17.50 $ 3,220.00 $ 17.50 $,„ 3,220.00 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO. 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE ARNT CONSTRUCTION ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ���� ENGINEERS • ARCHITECTS • PLANNERS CENTRAL LANDSCAPING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 44 2503.603 8" PVC, SDR 35 PIPE SEWER (14' -16' DEPTH) 408 LF $ 52.00 $ 21,216.00 $ 19.50 $ 7,956.00 $ 19.50 $ 7,956.00 45 2503.603 8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH) 274 LF $ 56.00 $ 15,344.00 $ 21.50 $ 5,891.00 $ 21.50 $ 5,891.00 46 2503.603 4" SANITARY SERVICE PIPE (SCHEDULE 40) 429 LF $ 15.00 $ 6,435.00 $ 11.00 $ 4,719.00 $ 11.00 $ 4,719.00 47 2503.603 TELEVISE SANITARY SEWER MAINS 1,255 LF $ 1.00 $ 1,255.00 $ 1.20 $ 1,506.00 $ 1.20 $ 1,506.00 48 2504.601 LOWER WATERMAIN 1 LS $ 2,500.00 $ 2,500.00 $ 3,520.00 $ 3,520.00 $ 3,520.00 $ 3,520.00 49 2504.602 ADJUST VALVE BOX 6 EA $ 200.00 $ 1,200.00 $ 235.00 $ 1,410.00 $ 235.00 $ 1,410.00 50 2504.602 CONNECT TO EXISTING WATERMAIN 2 EA $ 700.00 $ 1,400.00 $ 1,900.00 $ 3,800.00 $ 1,900.00 $ 3,800.00 51 2504.602 RELOCATE HYDRANT AND VALVE 1 EA $ 800.00 $ 800.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 $ 1,200.00 52 2504.602 HYDRANT 4 EA $ 1,800.00 $ 7,200.00 $ 1,610.00 $ 6,440.00 $ 1,610.00 $ 6,440.00 53 2504.602 6" GATE VALVE & BOX 4 EA $ 650.00 $ 2,600.00 $ 560.00 $ 2,240.00 $ 560.00 $ 2,240.00 54 2504.602 12" GATE VALVE & BOX 3 EA $ 1,600.00 $ 4,800.00 $ 1,290.00 $ 3,870.00 $ 1,290.00 $ 3,870.00 55 2504.602 1" CURB STOP & BOX 12 EA $ 160.00 $ 1,920.00 $ 95.00 $ 1,140.00 $ 95.00 $ 1,140.00 56 2504.602 1" CORPORATION STOP 12 EA $ 45.00 $ 540.00 $ 47.00 $ 564.00 $ 47.00 $ 564.00 57 2504.603 6" WATERMAIN DUCTILE IRON CL 52 123 LF $ 25.00 $ 3,075.00 $ 15.40 $ 1,894.20 $ 15.40 $ 1,894.20 58 2504.603 8" WATERMAIN DUCTILE IRON CL 52 15 LF $ 29.00 $ 435.00 $ 20.00 $ 300.00 $ 20.00 $ 300.00 59 2504.603 12" WATERMAIN DUCTILE IRON CL52 2,557 LF $ 40.00 $ 102,280.00 $ 25.50 $ 65,203.50 $ 25.57 $ 65,382.49 " 60 2504.603 1" TYPE K COPPER PIPE 529 LF $ 12.00 $ 6,348.00 $ 11.70 $ 6,189.30 $ 11.70 $ 6,189.30 61 2504.605 INSULATION (4" THICKNESS) 47 SY $ 19.00 $ 893.00 $ 21.00 $ 987.00 $ 21.00 $ 987.00 62 2504.604 DUCTILE IRON FITTINGS 1,375 LB $ 3.00 $ 4,125.00 $ 3.20 $ 4,400.00 $ 3.20 $ 4,400.00 63 2506.502 CONSTRUCT CATCH BASIN -TYPE 402 9 EA $ 1,300.00 $ 11,700.00 $ 1,200.00 $ 10,800.00 $ 1,200.00 $ 10,800.00 64 2506.502 CONSTRUCT CATCH BASIN - TYPE 404 3 EA $ 1,100.00 $ 3,300.00 $ 1,180.00 $ 3,540.00 $ 1,180.00 $ 3,540.00 65 2506.502 CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE - TYPE 406 8 EA $ 1,500.00 $ 12,000.00 $ 1,480.00 $ 11,840.00 $ 1,480.00 $ 11,840.00 66 2506.502 CONSTRUCT 60" DIAMETER CATCH BASIN MANHOLE - TYPE 406 1 EA $ 1,900.00 $ 1,900.00 $ 2,245.00 $ 2,245.00 $ 2,245.00 $ 2,245.00 67 2506.502 CONSTRUCT 48" DIAMETER MANHOLE - TYPE 409 2 EA $ 1,400.00 $ 2,800.00 $ 1,410.00 $ 2,820.00 $ 1,410.00 $ 2,820.00 68 2506.502 CONSTRUCT 96" DIAMETER CATCH BASIN MANHOLE - TYPE ST 4 EA $ 3,000.00 $ 12,000.00 $ 6,100.00 $ 24,400.00 $ 6,100.00 $ 24,400.00 69 2506.502 CONSTRUCT 60" DIAMETER STORM SEWER MANHOLE - TYPE SK 1 EA $ 2,000.00 $ 2,000.00 $ 2,170.00 $ 2,170.00 $ 2,170.00 $ 2,170.00 70 2506.522 ADJUST EXISTING FRAME AND RING CASTING 4 EA $ 250.00 $ 1,000.00 $ 235.00 $ 940.00 $ 235.00 $ 940.00 71 2506.602 RECONSTRUCT EXISTING MANHOLE 1 EA $ 1,500.00 $ 1,500.00 $ 900.00 $ 900.00 $ 900.00 $ 900.00 72 2506.602 CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301) 4 EA $ 1,500.00 $ 6,000.00 $ 1,550.00 $ 6,200.00 $ 1,550.00 $ 6,200.00 73 2506.603 CONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH) 12 LF $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 $ 100.00 $ 1,200.00 74 2511.501 RANDOM RIPRAP CLASS III 46 CY $ 60.00 $ 2,760.00 $ 94.00 $ 4,324.00 $ 94.00 $ 4,324.00 75 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 6,763 LF $ 8.00 $ 54,104.00 $ 7.40 $ 50,046.20 $ 7.45 $ 50,384.35 76 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 W/O BACK 1,150 LF $ 10.00 $ 11,500.00 $ 7.40 $ 8,510.00 $ 7.45 $ 8,567.50 77 2531.507 6" CONCRETE DRIVEWAY PAVEMENT 41 SY $ 33.00 $ 1,353.00 $ 38.50 $ 1,578.50 $ 34.50 $ 1,414.50 78 2540.602 INSTALL MAIL BOX SUPPORT 9 EA $ 85.00 $ 765.00 $ 75.00 $ 675.00 $ 75.00 $ 675.00 79 2540.602 MAIL BOX SUPPORT 5 EA $ 125.00 $ 625.00 $ 110.00 $ 550.00 $ 135.00 $ 675.00 80 2557.501 BARBED WIRE FENCE 420 LF $ 5.00 $ 2,100.00 $ 2.80 $ 1,176.00 $ 3.00 $ 1,260.00 81 2563.601 TRAFFIC CONTROL 1 LS $ 12,000.00 $ 12,000.00 $ 2,500.00 $ 2,500.00 $ 2,900.00 $ 2,900.00 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE ARNT CONSTRUCTION ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ���� ENGINEERS • ARCHITECTS • PLANNERS CENTRAL LANDSCAPING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 82 2564.531 SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY) 49 SF $ 25.00 $ 1225.00 $ 22.80 $ 1,11720 $ 2150 $ 1,151.50 83 2564.536 INSTALL SIGN (INCL. POST & ASSEMBLY) 13 EA $ 40.00 $ 520.00 $ 125.00 $ 1,625.00 $ 85.00 $ 1,105.00 84 2564.603 PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED 64 LF $ 16.00 $ 1,024.00 $ 22.00 $ 1,408.00 $ 21.80 $ 1,395.20 85 2564.603 PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT 1,966 LF $ 0.45 $ 884.70 $ 0.40 $ 786.40 $ 0.36 $ 707.76 86 2564.603 PVMT MARK. 4" SOLID LINE YELLOW -PAINT 430 LF $ 0.25 $ 107.50 $ 0.14 $ 60.20 $ 0.14 $ 60.20 87 2573.502 SILT FENCE, TYPE PREASSEMBLED 8,353 LF $ 2.00 $ 16,706.00 $ 0.01 $ 83.53 $ 1.70 $ 14,200.10 88 2573.602 INLET PROTECTION 12 EA $ 75.00 $ 900.00 $ 70.00 $ 840.00 $ 70.00 $ 840.00 89 2575.505 SODDING TYPE SALT RESISTANT 15,160 SY $ 2.50 $ 37,900.00 $ 3.20 $ 48,512.00 $ 1.90 $ 28,804.00 90 2575.604 EROSION CONTROL BLANKET 380 SY $ 1.50 $ 570.00 $ 2.00 $ 760.00 $ 1.60 $ 608.00 91 2575.605 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH & DISC ANCHORING) 1.5 ACRE $ 1,000.00 $ 1,500.00 $ 720.00 $ 1,080.00 $ 1,050.00 $ 1,575.00 TOTAL $ 1,133,076.20 $ 930,219.38 $ 936,304.39 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO. 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION F.M. FRATTALONE DRESEL CONTRACTING ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA ENGINEERS •ARCHITECTS • PLANNERS FOREST LAKE CONTRACTING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 1 2021.501 MOBILIZATION 1 LS $ 41,400.00 $ 41,400.00 $ 30,000.00 $ 30,000.00 $ 52,000.00 $ 52,000.00 2 2101.502 CLEARING 260 TR $ 10.25 $ 2,665.00 $ 10.25 $ 2,665.00 $ 12.00 $ 3,120.00 3 2101.507 GRUBBING 260 TR $ 10.25 $ 2,665.00 $ 10.25 $ 2,665.00 $ 12.00 $ 3,120.00 4 2104.501 REMOVE PIPE (CULVERT OR STORM SEWER) 331 LF $ 6.00 $ 1,986.00 $ 8.50 $ 2,813.50 $ 9.00 $ 2,979.00 5 2104.501 REMOVE CURB & GUTTER (ALL TYPES) 788 LF $' 2.00 $ 1,576.00 $ 2.50 $ 1,970.00 $ 2.50 $ 1,970.00 6 2104.501 REMOVE FENCE 1,061 LF $ 1.50 $ 1,591.50 $ 1.25 $ 1,326.25 $ 2.00 $ 2,122.00 7 2104.501 REMOVE WATERMAIN 5 LF $ 10.00 $ 50.00 $ 15.00 $ 75.00 $ 50.00 $ ' 250.00 8 2104.503 REMOVE CONCRETE PAVEMENT (DRIVEWAY) 220 SF $ 1.00 $ 220.00 $ 2.00 $ 440.00 $ 1.00 $ 220.00 9 2104.505 REMOVE BITUMINOUS SURFACING 13,706 SY $ 1.25 $ 17,132.50 $ 1.75 $ 23,985.50 $ 1.50 $ 20,559.00 10 2104.509 REMOVE SIGN TYPE C 1 EA $ 15.00 $ 15.00 $ 20.00 $ 20.00 $ 20.00 $ 20.00 11 2104.511 SAWCUT CONCRETE PAVEMENT (FULL DEPTH) 50 LF $ 10.00 $ 500.00 $ 3.50 $ 175.00 $ 6.00 $ 300.00 12 2104.513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) 430 LF $ 1.00 $ 430.00 $ 3.00 $ 1,290.00 $ 3.00 $ 1,290.00 13 2104.523 SALVAGE MAIL BOX SUPPORT 9 EA $ 25.00 $ 225.00 $ 30.00 $ 270.00 $ 40.00 $ 360.00 14 2104.523 SALVAGE SIGN 8 EA $ 15.00 $ 120.00 $ 20.00 $ 160.00 $ 20.00 $ 160.00 15 2104.523 SALVAGE GATE VALVE & BOX 1 EA $ 200.00 $ 200.00 $ 350.00 $ 350.00 $ 700.00 $ 700.00 16 2105.501 COMMON EXCAVATION 3,562 CY $ 12.65 $ 45,059.30 $ 8.50 $ 30,277.00 $ 14.00 $ 49,868.00 17 2105.505 MUCK EXCAVATION 5,574 CY $ 3.45 $ 19,230.30 $ 7.50 $ 41,805.00 $ 6.00 $ 33,444.00 18 2105.507 SUBGRADE EXCAVATION 2,000 CY $ 3.55 $ 7,100.00 $ 7.50 $ 15,000.00 $ 6.00 $ 12,000.00 19 2105.511 DITCH EXCAVATION 205 CY $ 10.00 $ 2,050.00 $ 8.50 $ 1,742.50 $ 15.00 $ 3,075.00 20 2105.522 SELECT GRANULAR BORROW (CV) (P) 11,530 CY $ 11.05 $ 127,406.50 $ 11.75 $ 135,477.50 $ 13.00 $ 149,890.00 21 2105.525 TOPSOIL BORROW (LV) 2,503 CY $ 7.00 $ 17,521.00 $ 10.00 $ 25,030.00 $ 11.00 $ 27,533.00 22 2105.603 CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) 3,000 LF $ 1.50 $ 4,500.00 $ 5.00 $ 15,000.00 $ 4.00 $ 12,000.00 23 2105.604 GEOTEXTILE FABRIC TYPE IV 855 SY $ 1.50 $ 1,282.50 $ 1.50 $ 1,282.50 $ 1.25 $ 1,068.75 24 2123.61 EXPLORATORY DIGGING 10 HR $ 135.00 $ 1,350.00 $ 150.00 $ 1,500.00 $ 150.00 $ 1,500.00 25 2211.501 AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & DRIVEWAY (100% CRUSHED) 10,669 TN $ 8.70 $ 92,820.30 $ 13.75 $ 146,698.75 $ 12.00 $ 128,028.00 26 2350.501 TYPE LV AGG. 3 WEARING COURSE (B) (STREET) 1,661 TN $ 32.75 $ 54,397.75 $ 29.85 $ 49,580.85 $ 30.00 $ 49,830.00 27 2350.501 TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) 411 TN $ 39.75 $ 16,337.25 $ 36.16 $ 14,861.76 $ 37.00 $ 15,207.00 28 2350.502 TYPE LV AGG. 3 NON - WEARING COURSE (B) (STREET) 1,622 TN $ 30.50 $ 49,471.00 $ 29.39 $ 47,670.58 $ 30.00 $ 48,660.00 29 2350.503 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAYS (B) 215 SY $ 8.70 $ 1,870.50 $ 5.80 $ 1,247.00 $ 14.00 $ 3,010.00 30 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 664 GAL $ 1.25 $ 830.00 $ 1.40 $ 929.60 $ 1.50 $ 996.00 31 2501.515 12" RC PIPE APRON W/ TRASH GUARD 1 EA $ 700.00 $ 700.00 $ 675.00 $ 675.00 $ 700.00 $ 700.00 32 2501.515 15" RC PIPE APRON W/ TRASH GUARD 14 EA $ 765.00 $ 10,710.00 $ 700.00 $ 9,800.00 $ 800.00 $ 11,200.00 33 2501.515 18" RC PIPE APRON W/ TRASH GUARD 1 EA $ 825.00 $ 825.00 $ 750.00 $ 750.00 $ 800.00 $ 800.00 34 2501.515 24" RC PIPE APRON W/ TRASH GUARD 2 EA $ 1,200.00 $ 2,400.00 $ 900.00 $ 1,800.00 $ 900.00 $ 1,800.00 35 2502.541 12" RC PIPE SEWER CLASS V DESIGN 3006 195 LF $ 25.30 $ 4,933.50 $ 24.00 $ 4,680.00 $ 26.00 $ 5,070.00 36 2503.541 15" RC PIPE SEWER CLASS V DESIGN 3006 1,129 LF $ 26.60 $ 30,031.40 $ 25.00 $ 28,225.00 $ 24.00 $ 27,096.00 37 2503.541 18" RC PIPE SEWER CLASS V DESIGN 3006 392 LF $ 28.00 $ 10,976.00 $ 28.00 $ 10,976.00 $ 27.00 $ 10,584.00 38 2503.541 24" RC PIPE SEWER CLASS III DESIGN 3006 71 LF $ 33.00 $ 2,343.00 $ 33.00 $ 2,343.00 $ 45.00 $ 3,195.00 39 2503.602 CONNECT TO EXISTING MANHOLES (SANITARY SEWER) 4 EA $ 1,300.00 $ 5,200.00 $ 600.00 $ 2,400.00 $ 1,000.00 $ 4,000.00 40 2503.602 CONNECT TO EXISTING MANHOLES (STORM SEWER) 2 EA $ 2,000.00 $ 4,000.00 $ 600.00 $ ' 1,200.00 $ 1,000.00 $ 2,000.00 41 2503.602 8 "X4" PVC WYE (SCHEDULE 40) 12 EA $ 110.00 $ 1,320.00 $ 135.00 $ 1,620.00 $ 60.00 $ 720.00 42 2503.602 8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) 384 LF $ 19.30 $ 7,411.20 $ 17.00 $ 6,528.00 $ 20.00 $ 7,680.00 43 2503.603 8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) 184 LF $ 20.30 $ 3,735.20 $ 18.00 $ 3,312.00 $ 25.00 $ 4,600.00 w Page 4 TABULATION OF BIDS 62ND STREET LAKES, INNES MINNESOTA CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO. 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM "DENOTES ERROR IN BIDDERS CALCULATION F.M. FRATTALONE DRESEL CONTRACTING ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ENGINEERS • ARCHITECTS • PLANNERS FOREST LAKE CONTRACTING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 44 2503.603 8" PVC, SDR 35 PIPE SEWER (14' -16' DEPTH) 408 LF $ 22.30 $ 9,098.40 $ 20.00 $ 8,160.00 $ 26.00 $ 10,608.00 45 2503.603 8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH) 274 LF $ 28.00 $ 7,672.00 $ 22.00 $ 6,028.00 $ 28.00 $ 7,672.00 46 2503.603 4" SANITARY SERVICE PIPE (SCHEDULE 40) 429 LF $ 10.00 $ 4,290.00 $ 16.00 $ 6,864.00 $ 12.00 $ 5,148.00 47 2503.603 TELEVISE SANITARY SEWER MAINS 1,255 LF $ 0.75 $ 941.25 $ 1.25 $ 1,568.75 $ 1.00 $ 1,255.00 48 2504.601 LOWER WATERMAIN 1 LS $ 4,000.00 $ 4,000.00 $ 4,500.00 $ 4,500.00 $ 2,200.00 $ 2,200.00 49 2504.602 ADJUST VALVE BOX 6 EA $ 250.00 $ 1,500.00 $ 175.00 $ 1,050.00 $ 225.00 $ 1,350.00 50 2504.602 CONNECT TO EXISTING WATERMAIN 2 EA $ 800.00 $ 1,600.00 $ 650.00 $ 1,300.00 $ 400.00 $ 800.00 51 2504.602 RELOCATE HYDRANT AND VALVE 1 EA $ 1,000.00 $ 1,000.00 $ 1,400.00 $ 1,400.00 $ 2,000.00 $ 2,000.00 52 2504.602 HYDRANT 4 EA $ 2,000.00 $ 8,000.00 $ 2,100.00 $ 8,400.00 $ 2,700.00 $ 10,800.00 53 2504.602 6" GATE VALVE & BOX 4 EA $ 500.00 $ 2,000.00 $ 700.00 $ 2,800.00 $ 700.00 $ 2,800.00 54 2504.602 12" GATE VALVE & BOX 3 EA $ 1,600.00 $ 4,800.00 $ 1,400.00 $ 4,200.00 $ 1,400.00 $ 4,200.00 55 2504.602 1" CURB STOP & BOX 12 EA $ 145.00 $ 1,740.00 $ 185.00 $ 2,220.00 $ 50.00 $ 600.00 56 2504.602 1" CORPORATION STOP 12 EA $ 170.00 $ 2,040.00 $ 150.00 $ 1,800.00 $ 125.00 $ 1,500.00 57 2504.603 6" WATERMAIN DUCTILE IRON CL 52 123 LF $ 20.00 $ 2,460.00 $ 25.00 $ 3,075.00 $ 20.00 $ 2,460.00 58 2504.603 8" WATERMAIN DUCTILE IRON CL 52 15 LF $ 23.50 $ 352.50 $ 25.00 $ 375.00 $ 28.00 $ 420.00 59 2504.603 12" WATERMAIN DUCTILE IRON CL52 2,557 LF $ 40.25 $ 102,919.25 $ 32.50 $ 83,102.50 $ 35.00 $ 89,495.00 60 2504.603 1" TYPE K COPPER PIPE 529 LF $ 11.00 $ 5,819.00 $ 15.00 $ 7,935.00 $ 18.00 $ 9,522.00 61 2504.605 INSULATION (4" THICKNESS) 47 SY $ 20.00 $ 940.00 $ 25.00 $ 1,175.00 $ 30.00 $ 1,410.00 62 2504.604 DUCTILE IRON FITTINGS 1,375 LB $ 3.25 $ 4,468.75 $ 4.00 $ 5,500.00 $ 2.00 $ 2,750.00 63 2506.502 CONSTRUCT CATCH BASIN -TYPE 402 9 EA $ 1,075.00 $ 9,675.00 $ 1,850.00 $ 16,650.00 $ 1,500.00 $ 13,500.00 64 2506.502 CONSTRUCT CATCH BASIN - TYPE 404 3 EA $ 1,035.00 $ 3,105.00 $ 1,950.00 $ 5,850.00 $ 1,500.00 $ 4,500.00 65 2506.502 CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE - TYPE 406 8 EA $ 1,110.00 $ 8,880.00 $ 2,250.00 $ 18,000.00 $ 1,500.00 $ 12,000.00 66 2506.502 CONSTRUCT 60" DIAMETER CATCH BASIN MANHOLE - TYPE 406 1 EA $ 1,875.00 $ 1,875.00 $ 3,250.00 $ 3,250.00 $ 2,000.00 $ 2,000.00 67 2506.502 CONSTRUCT 48" DIAMETER MANHOLE - TYPE 409 2 EA $ 1,325.00 $ 2,650.00 $ 1,950.00 $ 3,900.00 $ 1,500.00 $ 3,000.00 68 2506.502- CONSTRUCT 96" DIAMETER CATCH BASIN MANHOLE - TYPE ST 4 EA $ 4,825.00 $ 19,300.00 $ 7,000.00 $ 28,000.00 $ 7,000.00 $ 28,000.00 69 2506.502 CONSTRUCT 60" DIAMETER STORM SEWER MANHOLE - TYPE SK 1 EA $ 2,500.00 $ 2,500.00 $ 4,500.00 $ 4,500.00 $ 4,000.00 $ 4,000.00 70 2506.522 ADJUST EXISTING FRAME AND RING CASTING 4 EA $ 475.00 $ 1,900.00 $ 450.00 $ 1,800.00 $ 500.00 $ 2,000.00 71 2506.602 RECONSTRUCT EXISTING MANHOLE 1 EA $ 750.00 $ 750.00 $ 2,000.00 $ 2,000.00 $ 600.00 $ 600.00 72 2506.602 CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301) 4 EA $ 1,380.00 $ 5,520.00 $ 1,950.00 $ 7,800.00 $ 2,100.00 $ 8,400.00 73 2506.603 CONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH) 12 LF $ 100.00 $ 1,200.00 $ 175.00 $ 2,100.00 $ 70.00 $ 840.00 74 2511.501 RANDOM RIPRAP CLASS III 46 CY $ 55.00 $ 2,530.00 $ 85.00 $ 3,910.00 $ 80.00 $ 3,680.00 75 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 6,783 LF $ 7.10 $ 48,017.30 $ 7.45 $ 50,384.35 $ 7.50 $ 50,722.50 76 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 W/O BACK 1,150 LF $ 7.20 $ 8,280.00 $ 9.00 $ 10,350.00 $ 8.00 $ 9,200.00 77 2531.507 6" CONCRETE DRIVEWAY PAVEMENT 41 SY $ 39.00 $ 1,599.00 $ 34.00 $ 1,394.00 $ 45.00 $ 1,845.00 78 2540.602 INSTALL MAIL BOX SUPPORT 9 EA $ 75.00 $ 675.00 $ 85.00 $ 765.00 $ 60.00 $ 540.00 79 2540.602 MAIL BOX SUPPORT 5 EA $ 135.00 $ 675.00 $ 140.00 $ 700.00 $ 175.00 $ 875.00 80 2557.501 BARBED WIRE FENCE 420 LF $ 6.00 $ 2,520.00 $ 2.00 $ 840.00 $ 5.00 $ 2,100.00 81 2563.601 TRAFFIC CONTROL 1 LS $ 12,900.00 $ 12,900.00 $ 4,000.00 $ 4,000.00 $ 10,000.00 $ 10,000.00 • Page 5 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO 12510 -02 ENGINEERS BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION F.M. FRATTALONE DRESEL CONTRACTING ITE MN /DOT UNIT TOTAL UNIT TOTAL NO NO DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ���� • ARCHITECTS • PLANNERS FOREST LAKE CONTRACTING UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 82 2564.531 SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY) 49 SF $ 23.50 $ 1,151.50 $ 25.00 $ 1,225.00 $ 24.00 $ 1,176.00 83 2564.536 INSTALL SIGN (INCL. POST & ASSEMBLY) 13 EA $ 85.00 $ 1,105.00 $ 100.00 $ 1,300.00 $ 85.00 $ 1,105.00 84 2564.803 PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED 64 LF $ 21.80 $ 1,395.20 $ 22.00 $ 1,408.00 $ 22.00 $ 1,408.00 85 2564.603 PVMT MARK. 4" DOUBLE SOLID LINE YELLOW- PAINT 1,966 LF $ 0.36 $ 707.76 $ 1.60 $ 3,145.60 $ 0.40 $ 786.40 86 2564.603 PVMT MARK. 4" SOLID LINE YELLOW -PAINT 430 LF $ 0.14 $ 60.20 $ 1.30 $ 559.00 $ 0.15 $ 64.50 87 2573.502 SILT FENCE, TYPE PREASSEMBLED 8,353 LF $ 2.10 $ 17,541.30 $ 2.00 $ 18,706.00 $ 2.60 $ - 21,717.80 88 2573.602 INLET PROTECTION 12 EA $ 100.00 $ 1,200.00 $ 250.00 $ 3,000.00 $ 100.00 $ 1,200.00 89 2575.505 SODDING TYPE SALT RESISTANT 15,160 SY $ 2.15 $ 32,594.00 $ 2.00 $ 30,320.00 $ 2.00 $ 30,320.00 90 2575.604 EROSION CONTROL BLANKET 380 SY $ 1.75 $ 665.00 $ 1.50 $ 570.00 $ 2.00 $ 760.00 91 2575.605 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH & DISC ANCHORING) 1.5 ACRE $ 850.00 $ 1,275.00 $ 750.00 $ 1,125.00 $ 800.00 $ 1,200.00 TOTAL $ 954,475.11 * $ 1,047,622.49 $ 1,079,254.95 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO. 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM 'DENOTES ERROR IN BIDDERS CALCULATION THREE RIVERS CONSTRUCTION ITE MN /DOT ' UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ��� ENGINEERS • ARCHITECTS • PLANNERS UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 1 2021.501 MOBILIZATION 1 LS $ 14,652.50 $ 14,652.50 $ $ - 2 2101.502 CLEARING 260 TR $ 39.49 $ 10,267.40 $ $ - 3 2101.507 GRUBBING 260 TR $ 24.13 $ 6,273.80 $ - $ - 4 2104.501 REMOVE PIPE (CULVERT OR STORM SEWER) 331 LF $ 8.00 $ 2,648.00 $ $ - 5 2104.501 REMOVE CURB & GUTTER (ALL TYPES) 788 LF $ 3.00 $ 2,364.00 $ $ 6 2104.501 REMOVE FENCE 1,061 LF $ 1.00 $ 1,061.00 $ $ - 7 2104.501 REMOVE WATERMAIN 5 LF $ 50.00 $ 250.00 $ $ 8 2104.503 REMOVE CONCRETE PAVEMENT (DRIVEWAY) 220 SF $ 1.00 $ 220.00 $ - $ - 9 2104.505 REMOVE BITUMINOUS SURFACING 13,706 SY $ 3.32 $ 45,503.92 $ $ 10 2104.509 REMOVE SIGN TYPE C 1 EA $ 15.45 $ 15.45 $ $ - 11 2104.511 SAWCUT CONCRETE PAVEMENT (FULL DEPTH) 50 LF $ 3.09 $ 154.50 $ $ - 12 2104.513 SAWCUT BITUMINOUS PAVEMENT (FULL DEPTH) 430 LF $ 2.06 $ 885.80 $ $ 13 2104.523 SALVAGE MAIL BOX SUPPORT 9 EA $ 25.75 $ 231.75 $ $ - 14 2104.523 SALVAGE SIGN 8 EA $ 15.45 $ 123.60 $ $ - 15 2104.523 SALVAGE GATE VALVE & BOX 1 EA $ 250.00 $ 250.00 $ $ 16 2105.501 COMMON EXCAVATION 3,562 CY $ 5.22 $ 18,593.64 $ $ - 17 2105.505 MUCK EXCAVATION 5,574 CY $ 6.60 $ 36,788.40 $ $ 18 2105.507 SUBGRADE EXCAVATION 2,000 CY $ 6.60 $ ' 13,200.00 $ - $ - 19 2105.511 DITCH EXCAVATION 205 CY $ 15.25 $ 3,126.25 $ $ - 20 2105.522 SELECT GRANULAR BORROW (CV) (P) 11,530 CY $ 17.30 $ 199,469.00 $ - $ - 21 2105.525 TOPSOIL BORROW (LV) 2,503 CY $ 12.95 $ 32,413.85 $ $ 22 2105.603 CRUSHED ROCK 6" DEPTH (TRENCH STABILIZING) 3,000 LF $ 3.32 $ 9,960.00 $ $ - 23 2105.604 GEOTEXTILE FABRIC TYPE IV 855 SY $ 2.64 $ 2,257.20 $ $ - 24 2123.61 EXPLORATORY DIGGING 10 HR $ 150.00 $ 1,500.00 $ - $ 25 2211.501 AGGREGATE BASE CLASS 5 FOR STREET, TRAIL, & DRIVEWAY (100% CRUSHED) 10,669 TN $ 10.92 $ 116,505.48 $ $ 26 2350.501 TYPE LV AGG. 3 WEARING COURSE (B) (STREET) 1,661 TN $ 33.73 $ 56,025.53 $ $ 27 2350.501 TYPE LV AGG. 4 WEARING COURSE FOR TRAIL (B) 411 TN $ 40.94 $ 16,826.34 $ $ 28 2350.502 TYPE LV AGG. 3 NON- WEARING COURSE (B) (STREET) 1,622 TN $ 31.42 $ 50,963.24 $ $ - 29 2350.503 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAYS (B) 215 SY $ 8.96 $ 1,926.40 $ $ 30 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 664 GAL $ 1.29 $ 856.56 $ $ - 31 2501.515 12" RC PIPE APRON W/ TRASH GUARD 1 EA $ 550.05 $ 550.05 $ - $ - 32 2501.515 15" RC PIPE APRON W/ TRASH GUARD 14 EA $ 613.56 $ 8,589.84 $ $ 33 2501.515 18" RC PIPE APRON W/ TRASH GUARD 1 EA $ 693.18 $ 693.18 $ $ - 34 2501.515 24" RC PIPE APRON W/ TRASH GUARD 2 EA $ 1,117.89 $ 2,235.78 $ - $ - 35 2502.541 12" RC PIPE SEWER CLASS V DESIGN 3006 195 LF $ 22.64 $ 4,414.80 $ - $ - 36 2503.541 15" RC PIPE SEWER CLASS V DESIGN 3006 1,129 LF $ 25.21 $ 28,482.09 $ $ 37 2503.541 18" RC PIPE SEWER CLASS V DESIGN 3006 392 LF $ 28.34 $ 11,109.28 $ $ 38 2503.541 24" RC PIPE SEWER CLASS III DESIGN 3006 71 LF $ 32.65 $ 2,318.15 $ $ - 39 2503.602 CONNECT TO EXISTING MANHOLES (SANITARY SEWER) 4 EA $ 1,471.88 $ 5,887.52 $ - $ - 40 2503.602 CONNECT TO EXISTING MANHOLES (STORM SEWER) 2 EA $ 836.25 $ 1,672.50 $ - $ - 41 2503.602 8 "X4" PVC WYE (SCHEDULE 40) 12 EA $ 48.16 $ 577.92 $ $ 42 2503.602 8" PVC, SDR 35 PIPE SEWER (0' -8' DEPTH) 384 LF $ 40.15 $ 15,417.60 $ $ 43 2503.603 8" PVC, SDR 35 PIPE SEWER (12' -14' DEPTH) 184 LF $ 43.15 $ 7,939.60 $ $ - Page 7 TABULATION OF BIDS 62ND STREET LAKES, TA CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM *DENOTES ERROR IN BIDDERS CALCULATION THREE RIVERS CONSTRUCTION ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA ENGINEERS• ARCHITECTS• PLANNERS UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 44 2503.603 8" PVC, SDR 35 PIPE SEWER (14' -16 DEPTH) 408 LF $ 47.65 $ 19,441.20 $ - $ - 45 2503.603 8" PVC, SDR 35 PIPE SEWER (16' -18' DEPTH) 274 LF $ 50.15 $ 13,741.10 $ - $ - 46 2503.603 4" SANITARY SERVICE PIPE (SCHEDULE 40) 429 LF $ 27.56 $ 11,823.24 $ - $ 47 2503.603 TELEVISE SANITARY SEWER MAINS 1,255 LF $ 0.77 $ 966.35 $ - $ - 48 2504.601 LOWER WATERMAIN 1 LS $ 4,362.00 $ 4,362.00 $ - $ - 49 2504.602 ADJUST VALVE BOX 6 EA $ 236.88 $ 1,421.28 $ - $ - 50 2504.602 CONNECT TO EXISTING WATERMAIN 2 EA $ 699.38 $ 1,398.76 $ - $ - 51 2504.602 RELOCATE HYDRANT AND VALVE 1 EA $ 1,179.75 $ 1,179.75 $ $ - 52 2504.602 HYDRANT 4 EA $ 1,756.48 $ 7,025.92 $ - $ - 53 2504.602 6" GATE VALVE & BOX 4 EA $ 560.74 $ 2,242.96 $ $ 54 2504.602 12" GATE VALVE & BOX 3 EA $ 1,289.64 $ 3,868.92 $ - $ 55 2504.602 1" CURB STOP & BOX 12 EA $ 72.04 $ 864.48 $ - $ 56 2504.602 1" CORPORATION STOP 12 EA $ 24.50 $ 294.00 $ - $ - 57 2504.603 6" WATERMAIN DUCTILE IRON CL 52 123 LF $ 35.65 $ 4,384.95 $ - $ - 58 2504.603 8" WATERMAIN DUCTILE IRON CL 52 15 LF $ 39.10 $ 586.50 $ $ - 59 2504.603 12" WATERMAIN DUCTILE IRON CL52 2,557 LF $ 29.84 $ 76,300.88 $ $ - 60 2504.603 1" TYPE K COPPER PIPE 529 LF $ 17.41 $ 9,209.89 $ $ - 61 2504.605 INSULATION (4" THICKNESS) 47 SY $ 15.79 $ 742.13 $ - $ - 62 2504.604 DUCTILE IRON FITTINGS 1,375 LB $ 3.00 $ 4,125.00 $ - $ - 63 2506.502 CONSTRUCT CATCH BASIN -TYPE 402 9 EA $ 1,802.50 $ 16,222.50 $ $ 64 2506.502 CONSTRUCT CATCH BASIN - TYPE 404 3 EA $ 1,317.63 $ 3,952.89 $ $ - 65 2506.502 CONSTRUCT 48" DIAMETER CATCH BASIN MANHOLE - TYPE 406 8 EA $ 1,912.00 $ 15,296.00 $ $ 66 2506.502 CONSTRUCT 60" DIAMETER CATCH BASIN MANHOLE- TYPE 406 1 EA $ 2,589.02 $ 2,589.02 $ r 67 2506.502 CONSTRUCT 48" DIAMETER MANHOLE - TYPE 409 2 EA $ 1,912.00 $ 3,824.00 $ $ 68 2506.502 CONSTRUCT 96" DIAMETER CATCH BASIN MANHOLE - TYPE ST 4 EA $ 5,871.42 $ 23,485.68 $ $ 69 2506.502 CONSTRUCT 60" DIAMETER STORM SEWER MANHOLE - TYPE SK 1 EA $ 3,580.92 $ 3,580.92 $ $ 70 2506 522 ADJUST EXISTING FRAME AND RING CASTING 4 EA $ 341.63 $ 1,366.52 $ $ 71 2506.602 RECONSTRUCT EXISTING MANHOLE 1 EA $ 1,137.38 $ 1,137.38 $ - $ - 72 2506.602 CONSTRUCT SANITARY MANHOLE (4' DIA. - TYPE 301) 4 EA $ 1,902.50 $ 7,610.00 $ $ 73 2506.603 CONSTRUCT SANITARY MANHOLE EXTRA DEPTH (> 8' DEPTH) 12 LF $ 98.44 $ 1,181.28 $ $ 74 2511.501 RANDOM RIPRAP CLASS III 46 CY $ 80.70 $ 3,712.20 $ - $ - 75 2531.501 CONCRETE CURB AND GUTTER DESIGN B418 6,763 LF $ 7.73 $ 52,277.99 $ $ 76 2531.501 CONCRETE CURB AND GUTTER DESIGN 8418 W/O BACK 1,150 LF $ 8.60 $ 9,890.00 $ $ 77 2531.507 6" CONCRETE DRIVEWAY PAVEMENT 41 SY $ 36.32 $ 1,489.12 $ $ - 78 2540.602 INSTALL MAIL BOX SUPPORT 9 EA $ 77.25 $ 695.25 $ - $ - 79 2540.602 MAIL BOX SUPPORT 5 EA $ 139.05 $ 695.25 $ $ - 80 2557.501 BARBED WIRE FENCE 420 LF $ 7.73 $ 3,246.60 $ $ - 81 2563.601 TRAFFIC CONTROL 1 LS $ 2,987.00 $ 2,987.00 $ - $ - Page 8 TABULATION OF BIDS 62ND STREET RECONSTRUCTION CITY OF LINO LAKES, MINNESOTA TKDA COMMISSION NO. 12510 -02 BIDS OPENED: APRIL 2, 2004, AT 10 AM "DENOTES ERROR IN BIDDERS CALCULATION THREE RIVERS CONSTRUCTION ITE MN /DOT UNIT TOTAL UNIT TOTAL NO. NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ���� ENGINEERS• ARCHITECTS• PLANNERS UNIT TOTAL PRICE AMOUNT 62ND STREET RECONSTRUCTION 82 2564.531 SIGN PANELS TYPE C (INCLUDING POSTS & ASSEMBLY) 49 SF $ 2421 $ 1,186.29 $ $ - 83 2564.536 INSTALL SIGN (INCL. POST &ASSEMBLY) 13 EA $ 87.55 $ 1,138.15 $ $ 84 2564.603 PVMT MARK. 24" STOP LINE WHITE -POLY PREFORMED 64 LF $ 20.60 $ 1,318.40 $ $ - 85 2564.603 PVMT MARK. 4" DOUBLE SOLID LINE YELLOW -PAINT 1,966 LF $ 0.62 $ 1,218.92 $ - $ - 86 2564.603 PVMT MARK. 4" SOLID LINE YELLOW -PAINT 430 LF $ 0.31 $ 133.30 $ - $ - 87 2573.502 SILT FENCE, TYPE PREASSEMBLED 8,353 LF $ 1.65 $ 13,782.45 $ $ 88 2573.602 INLET PROTECTION 12 EA $ 100.00 $ 1,200.00 $' $ - 89 2575.505 SODDING TYPE SALT RESISTANT 15,160 SY $ 3.76 $ 57,001.60 $ - $ - 90 2575.604 EROSION CONTROL BLANKET 380 SY $ 1.80 $ 684.00 $ - $ - 91 2575.605 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH & DISC ANCHORING) 1.5 ACRE $ 875.50 $ 1,31125 $ ' $ - TOTAL $ 1,133,377.19 $ $ • Page 9 AGENDA ITEM 6F STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: April 12, 2004 TOPIC: Resolution No. 04 -44, Accepting Bids and Awarding Construction Contract, 62nd Street Reconstruction VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on April 2, 2004. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Arnt Construction Co., Inc. $ 930,219.38 Central Landscaping, Inc. $ 936,304.39* F.M. Frattalone $ 954,475.11* Dresel Construction, Inc. $1,047,622.49 Forest Lake Contracting, Inc. $1,079,254.95 Three Rivers Construction $1,133,377.19 Engineer's Estimate $1,133,076.20 The low bid is approximately 18% under the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. There was an error in the total amount of bid by F.M. Frattalone. Their total bid amount increased and eliminated them as the low bidder. F.M. Frattalone has been notified of the error and is in agreement with the change in results. The substantial completion date for this project is September 15, 2004, with a final completion date of October 30, 2004. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 04-44, Accepting Bids and Awarding a Construction Contract to Arnt Construction Co., Inc. for the 62 "d Street Reconstruction project. 3. Not adopt Resolution No 04 -44. RECOMMENDATION: Option No 2 - Staff recommends adoption of Resolution Number 04 -44.