HomeMy WebLinkAbout2004-081 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 04 -81 • RESOLUTION REJECTING ALL BIDS AND AUTHORIZE RE- BIDDING — BIRCH /HODGSON STREET IMPROVEMENTS PROJECT. • WHEREAS, pursuant to an advertisement for bids for the construction of the Birch /Hodgson Street Improvements project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $ 560,078.10 AND WHEREAS, according to City Charter, the City can not award a contract that exceeds the engineer's estimate by more than 10 %; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized to reject all bids for the construction of the Birch /Hodgson Street Improvements project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for re -bid for the making of such improvement under such approved plans and specifications. Adopted by the Lino Lakes City Council this 14th day of June 2004. J n J. geson, Mayor AGENDA ITEM 6G • STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: June 14, 2004 TOPIC: Resolution No. 04 -81, Rejecting All Bids and Authorize Re- Bidding, Birch /Hodgson Street Improvements Project • VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on June 3, 2004. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $ 560,078.10 The low bid is approximately 21 % over the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. The overrun in project costs appears to be contributed to the issues of maintaining traffic during the project work while meeting Anoka County design requirements, the traffic control signal system, and the trail system. According to the City Charter, if bids exceed the estimated cost by the engineer by more than 10 %, the City may not award the contract but may rebid the project one time only. It is staffs recommendation to review the design requirements with Anoka County including their funding of the project and make the appropriate adjustments. The project would then be rebid. Depending on the review with Anoka County, an estimated substantial completion date for this project would be October 30, 2004, with a final completion date of November 15, 2004. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 04 -81, Rejecting All Bids for the Birch /Hodgson Street Improvements project. 3. Not adopt Resolution No. 04 -81. RECOMMENDATION: • Option No. 2 - Staff recommends adoption of Resolution Number 04 -81. • CITY OF LINO LAKES RESOLUTION NO. 04 -81 RESOLUTION REJECTING ALL BIDS — BIRCH /HODGSON STREET IMPROVEMENTS PROJECT. WHEREAS, pursuant to an advertisement for bids for the construction of the Birch /Hodgson Street Improvements project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $1,133,076.20 AND WHEREAS, according to City Charter, the City can not award a contract that exceeds the engineer's estimate by more than 10 %; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized to reject all bids for the construction of the Birch /Hodgson Street Improvements project according to the plans and specifications • approved by the City Council and on file in the office of the City Clerk. Adopted by the Lino Lakes City Council this 14th day of June 2004. • AGENDA ITEM 6G STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: June 14, 2004 TOPIC: Resolution No. 04 -81, Rejecting All Bids, Birch /Hodgson Street Improvements Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on June 3, 2004. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $ 560,078.10 The low bid is approximately 21% over the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. The overrun in project costs appears to be contributed to the issues of maintaining traffic during the project work while meeting Anoka County design requirements, the traffic control signal system, and the trail system. According to the City Charter, if bids exceed the estimated cost by the engineer by more than 10 %, the City may not award the contract but may rebid the project one time only. It is staff's recommendation to review the design requirements with Anoka County including their funding of the project and make the appropriate adjustments. The project would then be rebid. Depending on the review with Anoka County, an estimated substantial completion date for this project would be October 30, 2004, with a final completion date of November 15, 2004. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 04 -81, Rejecting All Bids for the Birch /Hodgson Street Improvements project. 3. Not adopt Resolution No. 04 -81. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 04 -81. -119- TKDA ENGINEERS • ARCHITECTS - PLANNERS June 7, 2004 Honorable Mayor and City Council City of Lino Lakes, Minnesota Re: Birch Street and Hodgson Road Improvements City of Lino Lakes, Minnesota TKDA Commission No. 12993 -01 Dear Mayor and City Council: 1500 Piper Jaffray Plaza 444 Cedar Street Saint Paul, MN 55101 -2140 (651)292 -4400 (651) 292-0083 Fax www.tkda.com Bids for the referenced project were received on June 3, 2004, with the following results. A complete Tabulation of Bids is enclosed for your information. Contractor Base Bid Arnt Construction, Inc. Forest Lake Contracting, Inc. Magnum Company, LLC Engineer's Estimate Recommendation $677,698.79 $688,682.92 $747,500.23 $560,078.10 Based on the City Charter, any project receiving bids in excess of 10% over the Engineer's Estimate must be rejected. Therefore, we recommend that the City Attorney review the bids and make a recommendation to the City. Please do not hesitate to call me with any questions or comments you may have. Sincerely, Scott A. Brink, P.E. Project Manager. • SAB:art Enclosure An Employee Owned Company Pry - 12 1 - native Action and Equal Opportunity TABULATI OF BIDS Nor BIRCH STREET AND HODGSON ROAD IMPROVEMENTS CITY OF LINO LAKES, MINNESOTA COMMISSION NO. 12993 -01 BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ARNT ENGINEER'S ESTIMATE CONSTRUCTION CO., INC. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT ■ TKDA ENGINEERS • ARCHITECTS • PLANNERS FOREST LAKE CONTRACTING, INC. UNIT TOTAL PRICE AMOUNT BIRCH STREET AND HODGSON ROAD STREET IMPROVEMENTS 1 MOBILIZATION 1 LS $ 15,000.00 $ 15,000.00 $ 52,000.00 $ 52,000.00 $ 34,000.00 $ 34,000.00 2 CLEARING 64 TR $ 75.00 $ 4,800.00 $ 190.00 $ 12,160.00 $ 150.00 $ 9,600.00 3 GRUBBING 66 TR $ 65.00 $ 4,290.00 $ 40.00 $ 2,640.00 $ 30.00 $ 1,980.00 4 REMOVE FENCE 55 LF $ 2.00 $ 110.00 $ 4.00 $ 220.00 $ 4.00 $ 220.00 5 REMOVE CONCRETE CURB 430 LF $ 3.00 $ 1,290.00 $ 3.00 $ 1,290.00 $ 2.50 $ 1,075.00 6 REMOVE STORM SEWER PIPE (ALL TYPES & SIZES) 56 LF $ 11.00 $ 616.00 $ 16.00 $ 896.00 $ 9.00 $ 504.00 7 REMOVE WOODEN LANDSCAPING POST 10 EA $ 12.00 $ 120.00 $ 25.00 $ 250.00 $ 15.00 $ 150.00 8 REMOVE BIT SURFACE - STREET /DWY/TRAIUSHOULDER (ALL DEPTHS) 6628 SY $ 2.00 $ 13,256.00 $ 1.50 $ 9,942.00 $ 1.75 $ 11,599.00 9 MILL 2" BITUMINOUS - STREET 1311 SY $ 1.00 $ 1,311.00 $ 4.00 $ 5,244.00 $ 4.00 $ 5,244.00 10 1' 1: 1:_ 1 REMOVE CATCH BASIN, MANHOLE 5 EA $ 400.00 $ 2,000.00 $ 320.00 $ 1,600.00 $ 500.00 $ 2,500.00 AW CUT. BITUMINOUS PAVEMENT (FULL DEPTH) 5524 LF $ 3.00 $ 16,572.00 $ 0.01 $ 55.24 $ 2.00 $ 11,048.00 N ALVAGE AND REINSTALL MAILBOX SUPPORT 7 EA $ 110.00 $ 770.00 $ 150.00 $ 1,050.00 $ 75.00 $ 525.00 N ALVAGE AND RELOCATE HYDRANT & GATE VALVE _YSTEM 1 LS $ 1,550.00 $ 1,550.00 $ 3,700.00 $ 3,700.00 $ 2,000.00 $ 2,000.00 14 SALVAGE AND REINSTALL 12' PIPE SEWER CMP 37 LF $ 18.00 $ 666.00 $ 26.00 $ 962.00 $ 25.00 $ 925.00 15 SALVAGE AND REINSTALL 15" RCP 61 LF $ 20.00 $ 1,220.00 $ 32.00 $ 1,952.00 $ 25.00 $ 1,525.00 16 SALVAGE AND REINSTALL 15" FES (RCP) 3 EA $ 100.00 $ 300.00 $ 580.00 $ 1,740.00 $ 500.00 $ 1,500.00 17 SALVAGE AND REINSTALL 24" FES (RCP) 1 EA $ 130.00 $ 130.00 $ 890.00 $ 890.00 $ 500.00 $ 500.00 18 COMMON EXCAVATION (P) (STREET /DRIVEWAY) 7537 CY $ 7.00 $ 52,759.00 $ 13.38 $ 100,845.06 $ 9.00 $ 67,833.00 19 COMMON EXCAVATION (P) FOR TRAIL 840 CY $ 10.00 $ 8,400.00 $ 13.38 $ 11,239.20 $ 14.00 $ 11,760.00 20 SUBGRADE EXCAVATION 700 CY $ 7.00 $ 4,900.00 $ 13.38 $ 9,366.00 $ 9.00 $ 6,300.00; 21 SELECT GRANULAR BORROW (CV) (P) 3,208 CY $ 12.00 $ 38,496.00 $ 0.01 $ 32.08 $ 11.00 $ 35,288.00 22 TOPSOIL BORROW (LV) 2,100 CY $ 9.00 $ 18,900.00 $ 0.01 $ 21.00 $ 11.00 $ 23,100.00 23 CRUSHED ROCK -6" DEPTH (TRENCH STABILIZATION) 100 LF $ 3.00 $ 300.00 $ 5.00 $ 500.00 $ 5.00 $ 500.00 24 EXPLORATORY DIGGING 5 HR $ 300.00 $ 1,500.00 $ 170.00 $ 850.00 $ 150.00 $ 750.00 25 AGGREGATE BASE CLASS 5 (100% CRUSHED) (STREET, DRIVEWAY) 6,050 TN $ 11.00 $ 66,550.00 $ 11.52 $ 69,696.00 $ 12.00 $ 72,600.00 26 AGGREGATE BASE CLASS 5 (100% CRUSHED) FOR TRAIL 1,123 TN $ 11.00 $ 12,353.00 $ 12.00 $ 13,476.00 $ 14.00 $ 15,722.00 27 TYPE MV AGG. 3 WEARING COURSE (C.S.A.H. 10, C.S.A.H. 49) 1,224 TN $ 35.00 $ 42,840.00 $ 42.25 $ 51,714.00 $ 42.00 $ 51,408.00 28 TYPE MV AGG. 3 NON - WEARING COURSE (C.S.A.H. 10, C.S.A.H. 49) 1,809 TN $ 34.00 $ 61,506.00 $ 42.25 $ 76,430.25 $ 42.00 $ 75,978.00 29 TYPE LV AGG. 3 WEARING COURSE (WARE RD) 230 TN $ 31.00 $ 7,130.00 $ 42.00 $ ' 9,660.00 $ 42.00 $ 9,660.00 30 TYPE LV AGG. 3 NON - WEARING COURSE (WARE RD, COMMERCIAL DWYS) 253 TN $ 30.00 $ 7,590.00 $ 42.00 $ 10,626.00 $ 42.00 $ 10,626.00 31 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR TRAIL 324 TN $ 37.00 $ 11,988.00 $ 57.00 $ 18,468.00 $ 56.00 $ 18,144.00 Page 1 TABULAIMIN OF BIDS ■ BIRCH STREET AND H ROAD IMPROVEMENTS CITY OF LINO LAKES, MINNESOTA COMMISSION NO. 12993 -01 BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ARNT ENGINEER'S ESTIMATE CONSTRUCTION CO., INC. ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT Noir TKDA ENGINEERS • ARCHITECTS - PLANNERS FOREST LAKE CONTRACTING, INC. UNIT TOTAL PRICE AMOUNT 32 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAY 400 SY $ 12.00 $ 4,800.00 $ 9.00 $ 3,600.00 $ 14.00 $ 5,600.00 33 BITUMINOUS MATERIAL FOR TACK COAT 1,100 GAL $ 2.00 $ 2,200.00 $ 1.40 $ 1,540.00 $ 1.40 $ 1,540.00 34 CONNECT TO EXISTING STORM SEWER PIPE (ALL SIZES AND TYPES) 5 EA $ 500.00 $ 2,500.00 $ 520.00 $ 2,600.00 $ 225.00 $ 1,125.00 35 12" RC PIPE APRON W/ TRASH GUARD 1 EA $ 700.00 $ 700.00 $ 840.00 $ 840.00 $ 800.00 $ 800.00 36 18" RC PIPE APRON W/ TRASH GUARD 5 EA $ 800.00 $ 4,000.00 $ 970.00 $ 4,850.00 $ 900.00 $ 4,500.00 37 12" RC PIPE SEWER CLASS V DESIGN 3006 63 LF $ 23.00 $ 1,449.00 $ 42.00 $ 2,646.00 $ 36.00 $ 2,268.00 38 15" RC PIPE SEWER CLASS V DESIGN 3006 24 LF $ 24.00 $ 576.00 $ 44.00 $ 1,056.00 $ 41.00 $ 984.00 39 18" RC PIPE SEWER CLASS V DESIGN 3006 .- 75 LF $ 26.00 $ 1,950.00 $ 47.00 $ 3,525.00 $ 41.00 $ 3,075.00 40 36" C.S. PIPE 3 LF $ 50.00 $ . 150.00 $ 160.00 $ • 480.00 $ 250.00 $ 750.00 41 4; 36" 45 DEGREE ELBOW FOR C.S. PIPE 1 EA $ 800.00 $ 800.00 $ 525.00 $ 525.00 $ 750.00 $ 750.00 6" METAL APRON FOR C.S. PIPE 1 EA $ 700.00 $ 700.00 $ 370.00 $ 370.00 $ 600.00 $ 600.00 4: F'' 4, 4; 1 ULKHEAD 36" C.S. PIPE 1 EA $ 500.00 $ 500.00 $ 170.00 $ 170.00 $ 300.00 $ 300.00 W DJUST EXISTING G.V. BOX 4 EA $ 200.00 $ 800.00 $ 300.00 $ 1,200.00 $ 300.00 $ 1,200.00 " WATERMAIN DUCTILE IRON CL. 52 78 LF $ 20.00 $ 1,560.00 $ 26.00 $ 2,028.00 $ 25.00 $ 1,950.00 46 INSULATION (4" THICKNESS) 20 SY $ 20.00 $ 400.00 $ 21.00 $ 420.00 $ 30.00 $ 600.00 47 DUCTILE IRON FITTINGS 31 LB $ 3.00 $ 93.00 $ 5.00 $ 155.00 $ 2.50 $ 77.50 48 CONSTRUCT CATCH BASIN 27" DESIGN 403 (W/ SALVAGED CASTING ASSEMBLY) 3 EA $ 1,300.00 $ 3,900.00 $ 840.00 $ 2,520.00 $ 900.00 $ 2,700.00 49 CONSTRUCT CATCH BASIN -MH 48" DESIGN 406 (W/ SALVAGED CASTING ASSEMBLY) 1 EA $ 1,500.00 $ 1,500.00 $ 1,365.00 $ 1,365.00 $ 1,300.00 $ 1,300.00 50 CONSTRUCT STORM SEWER MH 48" (W/ SALVAGED CASTING ASSEMBLY) 1 EA $ 1,500.00 $ 1,500.00 $ 1,260.00 $ 1,260.00 $ 1,300.00 $ 1,300.00 51 RANDOM RIP RAP CLASS III 31 CY $ 80.00 $ 2,480.00 $ 120.00 $ 3,720.00 $ 95.00 $ 2,945.00 52 CONCRETE CURB AND GUTTER DESIGN B418 253 LF $ 8.00 $ 2,024.00 $ 12.60 $ 3,187.80 $ 18.00 $ 4,554.00 53 CONCRETE CURB AND GUTTER DESIGN B618 427 LF $ 10.00 $ 4,270.00 $ 12.60 $ 5,380.20 $ 13.00 $ 5,551.00 54 4" CONCRETE DRIVEWAY PAVEMENT 144 SY $ 36.00 $ 5,184.00 $ 30.00 $ 4,320.00 $ 35.00 $ 5,040.00 55 MAILBOX SUPPORT 3 EA $ 125.00 $ 375.00 $ 200.00 $ 600.00 $ 175.00 $ 525.00 56 TRAFFIC CONTROL 1 LS $ 10,000.00 $ 10,000.00 $ 5,000.00 $ 5,000.00 $ 7,000.00 $ 7,000.00 57 FULL T ACTT CONTROL SIGNAL SYSTEM 1 SIG SYS $ 50,000.00 $ 50,000.00 $ 101,200.00 $ 101,200.00 $ 92,000.00 $ 92,000.00 58 EMERGENCY VEHICLE PREEMPTION SYSTEM 1 LS $ 5,000.00 $ 5,000.00 $ 4,800.00 $ 4,800.00 $ 5,000.00 $ 5,000.00 59 REMOVE PAVEMENT MARKING - PERMANENT 4,000 LF $ 0.50 $ 2,000.00 $ 0.60 $ 2,400.00 $ 0.50 $ 2,000.00 60 REMOVE SIGN TYPE C 29 EA $ 30.00 $ 870.00 $ 21.00 $ 609.00 $ 20.00 $ 580.00 61 SALVAGE SIGN (INCL. POST & ASSEMBLY) 12 EA $ 30.00 $ 360.00 $ 129.00 $ 1,548.00 $ 125.00 $ 1,500.00 62 SIGN PANELS TYPE C (F & I) (INCL. POST & ASSEMBLY) 248 SF $ 25.00 $ 6,187.50 $ 22.00 $ 5,445.00 $ 22.00 $ 5,445.00 63 HAZARD MARKER X4 -2 6 EA $ 65.00 $ 390.00 $ 47.00 $ 282.00 $ 45.00 $ 270.00 64 PAVEMENT MESSAGE (LT ARROW) POLY PREFORM 10 EA $ 210.00 $ 2,100.00 $ 180.00 $ 1,800.00 $ 175.00 $ 1,750.00 65 PAVEMENT MESSAGE (RT ARROW) POLY PREFORM 11 EA $ 210.00 $ 2,310.00 $ 180.00 $ 1,980.00 $ 175.00 $ 1,925.00 66 4" SOLID LINE WHITE -PAINT 10,470 LF $ 0.10 $ 1,047.00 $ 0.08 $ 837.60 $ 0.06 $ 628.20 67 24" SOLID LINE YELLOW -PAINT 636 LF $ 4.00 $ 2,544.00 $ 1.68 $ 1,068.48 $ 1.63 $ 1,036.68 Page 2 TABULATIM OF BIDS w w BIRCH STREET AND HODGSON ROAD IMPROVEMENTS CITY Y OF LINO LAKES, MINNESOTA COMMISSION NO 12993 -01 TKDA ENGINEERS • ARCHITECTS • PLANNERS BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION ARNT FOREST LAKE ENGINEER'S ESTIMATE CONSTRUCTION CO., INC. CONTRACTING, INC. ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 68 24" STOP LINE WHITE -POLY PREFORM 130 LF $ 20.00 $ 2,600.00 $ 15.70 $ 2,041.00 $ 15.26 $ 1,983.80 69 4° DOUBLE SOLID LINE YELLOW -PAINT 6,898 LF $ 0.20 $ 1,379.60 $ 0.16 $ 1,103.68 $ 0.13 $ 896.74 70 ZEBRA CROSSWALK WHITE -POLY PREFORMED 828 SF $ 7.00 $ 5,796.00 $ 7.90 $ 6,541.20 $ 8.00 $ 6,624.00 71 SILT FENCE, TYPE PREASSEMBLED 6,300 LF $ 2.00 $ 12,600.00 $ 1.40 $ 8,820.00 $ 2.25 $ 14,175.00 72 INLET PROTECTION AT CB 2 EA $ 100.00 $ 200.00 $ 25.00 $ 50.00 $ 100.00 $ 200.00 73 SODDING TYPE SALT RESISTANT 4,000 SY $ 2.25 $ 9,000.00 $ 3.00 $ 12,000.00 $ 2.25 $ 9,000.00 74 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, & DISC ANCHORING) 2 ACRE $ 900.00 $ 2,070.00 $ 1 ,000.00 $ 2,300.00 $ 900.00 $ 2,070.00 TOTAL BIRCH STREET AND HODGSON ROAD IMPROVEMENTS $ 560,078.10 $ 677,698.79 $ 688,682.92 Page 3 TABULATOR OF BIDS W BIRCH STREET AND HODGSON ROAD IMPROVEMENTS CITY OF LINO LAKES, MINNESOTA COMMISSION NO. 12993 -01 BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION MAGNUM COMPANY LLC ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT TKDA ENGINEERS - ARCHITECTS • PLANNERS UNIT TOTAL PRICE AMOUNT BIRCH STREET AND HODGSON ROAD STREET IMPROVEMENTS 1 MOBILIZATION 1 LS $ 2,500.00 $ 2,500.00 $ - $ - 2 CLEARING 64 TR $ 208.00 $ 13,312.00 $ - $ - 3 GRUBBING 66 TR $ 135.00 $ - 8,910.00 $ - $ - 4 REMOVE FENCE 55 LF $ 4.45 $ 244.75 $ - $ - 5 REMOVE CONCRETE CURB 430 LF $ 3.35 $ 1,440.50 $ - $ - 6 REMOVE STORM SEWER PIPE (ALL TYPES & SIZES) .56 LF $ 16.23 $ 908.88 $ - $ - 7 REMOVE WOODEN LANDSCAPING POST 10 EA $ 150.00 $ 1,500.00 $ - $ - 8 REMOVE BIT SURFACE - STREET /DWY/TRAIUSHOULDER (ALL DEPTHS) 6628 SY $ 2.90 $ 19,221.20 $ - $ 9 MILL 2" BITUMINOUS - STREET 1311 SY $ 3.45 $ 4,522.95 $ - $ - 10 1 1 1 N cji 1. 1 REMOVE CATCH BASIN, MANHOLE 5 EA $ 325.00 $ 1,625.00 $ - $ - ;AW CUT BITUMINOUS PAVEMENT (FULL DEPTH) 5524 LF $ 2.75 $ 15,191.00 $ - $ - ;ALVAGE AND REINSTALL MAILBOX SUPPORT 7 EA $ 158.00 $ 1,106.00 $ - $ - ;ALVAGE AND RELOCATE HYDRANT & GATE VALVE ;YSTEM 1 LS $ 3,787.00 $ 3,787.00 $ - . $ - 14 SALVAGE AND REINSTALL 12" PIPE SEWER CMP 37 LF $ 27.05 $ 1,000.85 $ - $ - 15 SALVAGE AND REINSTALL 15" RCP 61 LF $ 32.46 $ 1,980.06 $ - $ - 16 SALVAGE AND REINSTALL 15" FES (RCP) 3 EA $ 595.00 $ 1,785.00 $ - $ - 17 SALVAGE AND REINSTALL 24" FES (RCP) 1 EA $ 920.00 $ 920.00 $ - $ - 18 COMMON EXCAVATION (P) (STREET/DRIVEWAY) 7537 CY $ 11.55 $ 87,052.35 $ - $ - 19 COMMON EXCAVATION (P) FOR TRAIL 840 CY $ 14.40 $ 12,096.00 $ - $ - 20 SUBGRADE EXCAVATION 700 CY $ 11.80 $ 8,260.00 $ - $ - 21 SELECT GRANULAR BORROW (CV) (P) 3,208 CY . $ 18.00 $ 57,744.00 $ - $ - 22 TOPSOIL BORROW (LV) 2,100 CY $ 15.00 $ 31,500.00 $ - $ - 23 CRUSHED ROCK -6" DEPTH (TRENCH STABILIZATION) 100 LF $ 3.25 $ 325.00 $ - $ - 24 EXPLORATORY DIGGING 5 HR $ 250.00 $ 1,250.00 $ - $ - 25 AGGREGATE BASE CLASS 5 (100% CRUSHED) (STREET, DRIVEWAY) 6,050 TN $ 11.70 $ 70,785.00 $ - $ - 26 AGGREGATE BASE CLASS 5 (100% CRUSHED) FOR TRAIL 1,123 TN $ 14.85 $ 16,676.55 $ - $ - 27 TYPE MV AGG. 3 WEARING COURSE (C.S.A.H. 10, C.S.A.H. 49) 1,224 TN $ 43.00 $ 52,632.00 $ $ - 28 TYPE MV AGG. 3 NON - WEARING COURSE (C.S.A.H. 10, C.S.A.H.49) 1,809 TN $ 41.80 $ 75,616.20 $ - $ - 29 TYPE LV AGG. 3 WEARING COURSE (WARE RD) 230 TN $ 42.90 $ 9,867.00 $ - $ - 30 TYPE LV AGG. 3 NON - WEARING COURSE (WARE RD, COMMERCIAL DWYS) 253 TN $ 42.20 $ 10,676.60 $ - $ - 31 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR TRAIL 324 TN $ 52.65 $ 17,058.60 $ - $ - Page 4 TABULATIM OF BIDS BIRCH STREET AND HOES ROAD IMPROVEMENTS CITY OF LINO LAKES, MINNESOTA COMMISSION NO. 12993 -01 BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION MAGNUM COMPANY LLC ITEM UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT W TKDA i ENGINEERS- ARCHITECTS • PLANNERS UNIT TOTAL PRICE AMOUNT 32 TYPE LV AGG. 4 WEARING COURSE 2" THICK FOR DRIVEWAY 400 SY $ 13.60 $ 5,440.00 $ - $ - 33 BITUMINOUS MATERIAL FOR TACK COAT 1,100 GAL $ 1.40 $ 1,540.00 $ - $ - 34 CONNECT TO EXISTING STORM SEWER PIPE (ALL SIZES AND TYPES) 5 EA $ 541.00 $ 2,705.00 $ - $ - 35 12" RC PIPE APRON W/ TRASH GUARD 1 EA $ 865.60 $ 865.60 $ - $ - 36 18" RC PIPE APRON W/ TRASH GUARD 5 EA $ 1,000.00 $ 5,000.00 $ - $ - 37 12" RC PIPE SEWER CLASS V DESIGN 3006 63 LF $ 43.28 $ 2,726.64 $ - $ - 38 15" RC PIPE SEWER CLASS V DESIGN 3006 24 LF $ 45.45 $ 1,090.80 $ - $ - 39 18" RC PIPE SEWER CLASS V DESIGN 3006 75 LF $ 48.69 $ 3,651.75 $ - $ - 40 36" C.S. PIPE 3 LF $ 162.30 $ 486.90 $ - $ - 41 36" 45 DEGREE ELBOW FOR C.S. PIPE 1 EA $ 541.00 $ 541.00 $ - $ - 4 1 4 I•' 4 rn 4 , 6" METAL APRON FOR C.S. PIPE 1 EA $ 378.00 $ 378.00 $ - $ IULKHEAD 36" C.S. PIPE 1 EA $ 162.00 $ 162.00 $ $ - �DJUST EXISTING G.V. BOX 4 EA $ 185.00 $ 740.00 $ - $ - WATERMAIN DUCTILE IRON CL. 52 78 LF $ 27.05 $ 2,109.90 $ - $ - 46 INSULATION (4" THICKNESS) 20 SY $ 21.64 $ 432.80 $ - $ - 47 DUCTILE IRON FITTINGS 31 LB $ 5.41 $ 167.71 $ - $ - 48 CONSTRUCT CATCH BASIN 27" DESIGN 403 (W/ SALVAGED CASTING ASSEMBLY) 3 EA $ 920.00 $ 2,760.00 $ - $ - 49 CONSTRUCT CATCH BASIN -MH 48" DESIGN 406 (W/ SALVAGED CASTING ASSEMBLY) 1 EA $ 1,460.00 $ 1,460.00 $ - $ - 50 CONSTRUCT STORM SEWER MH 48" (W/ SALVAGED CASTING ASSEMBLY) 1 EA $ 1,352.00 $ 1,352.00 $ - $ - 51 RANDOM RIP RAP CLASS III 31 CY $ 108.00 $ 3,348.00 $ - $ - 52 CONCRETE CURB AND GUTTER DESIGN B418 253 LF $ 19.37 $ 4,900.61 $ - $ - 53 CONCRETE CURB AND GUTTER DESIGN B618 427 LF $ 13.96 $ 5,960.92 $ $ - 54 4" CONCRETE DRIVEWAY PAVEMENT 144 SY $ 29.21 $ 4,206.24 $ - $ - 55 MAILBOX SUPPORT 3 EA $ 160.00 $ 480.00 $ - $ - 56 TRAFFIC CONTROL 1 LS $ 5,500.00 $ 5,500.00 $ - $ - 57 FULL T ACT T CONTROL SIGNAL SYSTEM 1 SIG SYS $ 105,000.00 $ 105,000.00 $ - $ - 58 EMERGENCY VEHICLE PREEMPTION SYSTEM 1 LS $ 5,100.00 $ 5,100.00 $ - $ - 59 REMOVE PAVEMENT MARKING - PERMANENT 4,000 LF $ 0.54 $ 2,160.00 $ - $ - 60 REMOVE SIGN TYPE C 29 EA $ 21.64 $ 627.56 $ - $ - 61 SALVAGE SIGN (INCL. POST & ASSEMBLY) 12 EA $ 135.25 $ 1,623.00 $ - $ - 62 SIGN PANELS TYPE C (F & I) (INCL. POST & ASSEMBLY) 248 SF $ 23.26 $ 5,756.85 $' - $ - 63 HAZARD MARKER X4 -2 6 EA $ 48.70 $ 292.20 $ - $ - 64 PAVEMENT MESSAGE (LT ARROW) POLY PREFORM 10 EA $ 190.00 $ 1,900.00 $ - $ - 65 PAVEMENT MESSAGE (RT ARROW) POLY PREFORM 11 EA $ 190.00 $ 2,090.00 $ - $ - 66 4" SOLID LINE WHITE -PAINT 10,470 LF $ 0.06 $ 628.20 $ - $ - 67 24° SOLID LINE YELLOW -PAINT 636 LF $ 1.76 $ 1,119.36 $ - $ - Page 5 TABULATIM OF BIDS w ■ BIRCH STREET AND HODGSON ROAD IMPROVEMENTS TKDA CITY OF LINO LAKES, MINNESOTA COMMISSION NO. 12993 -01 ENGINEERS • ARCHITECTS • PLANNERS BIDS OPENED: JUNE 3, 2004, AT 10:00 AM *DENOTES ERROR IN BIDDERS CALCULATION MAGNUM COMPANY LLC ITEM UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT 68 24" STOP LINE WHITE -POLY PREFORM 130 LF $ 16.51 $ 2,146.30 $ - $ 69 4" DOUBLE SOLID LINE YELLOW -PAINT 6,898 LF $ 0.14 $ 965.72 $ - $ - 70 ZEBRA CROSSWALK WHITE -POLY PREFORMED 828 SF $ 8.26 $ 6,839.28 $ - $ - 71 SILT FENCE, TYPE PREASSEMBLED 6,300 LF $ 1.35 $ 8,505.00 $ - $ 72 INLET PROTECTION AT CB 2 EA $ 210.00 $ 420.00 $ - $ 73 SODDING TYPE SALT RESISTANT 4,000 SY $ 2.65 $ 10,600.00 $ - $ - 74 SEEDING (INCL. SEED MIX 50B OR 60B, FERTILIZER, MULCH, & DISC ANCHORING) 2 ACRE $ 968.00 $ 2,226.40 $ - $ - TOTAL BIRCH STREET AND HODGSON ROAD IMPROVEMENTS $ 747,500.23 $ - $ - Page 6 AGENDA ITEM 6G • STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: June 14, 2004 TOPIC: Resolution No. 04 -81, Rejecting All Bids and Authorize Re- Bidding, Birch /Hodgson Street Improvements Project • VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:00 a.m. on June 3, 2004. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $ 560,078.10 The low bid is approximately 21% over the Engineer's Estimate for this project. A copy of the complete bid tabulation is attached. The overrun in project costs appears to be contributed to the issues of maintaining traffic during the project work while meeting Anoka County design requirements, the traffic control signal system, and the trail system. According to the City Charter, if bids exceed the estimated cost by the engineer by more than 10 %, the City may not award the contract but may rebid the project one time only. It is staffs recommendation to review the design requirements with Anoka County including their funding of the project and make the appropriate adjustments. The project would then be rebid. Depending on the review with Anoka County, an estimated substantial completion date for this project would be October 30, 2004, with a final completion date of November 15, 2004. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 04 -81, Rejecting All Bids for the Birch /Hodgson Street Improvements project. 3. Not adopt Resolution No. 04 -81. RECOMMENDATION: • Option No. 2 - Staff recommends adoption of Resolution Number 04 -81. e. CITY OF LINO LAKES RESOLUTION NO. 04 -81 11. RESOLUTION REJECTING ALL BIDS AND AUTHORIZE RE- BIDDING — BIRCH /HODGSON STREET IMPROVEMENTS PROJECT. • • WHEREAS, pursuant to an advertisement for bids for the construction of the Birch /Hodgson Street Improvements project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Arnt Construction Co., Inc. $ 677,698.79 Forest Lake Contracting, Inc. $ 688,682.92 Magnum Company LLC $ 747,500.23 Engineer's Estimate $ 560,078.10 AND WHEREAS, according to City Charter, the City can not award a contract that exceeds the engineer's estimate by more than 10 %; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized to reject all bids for the construction of the Birch /Hodgson Street Improvements project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. 2. The Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for re -bid for the making of such improvement under such approved plans and specifications. Adopted by the Lino Lakes City Council this 14th day of June 2004. Ann J. Elf ir, City Clerk