HomeMy WebLinkAbout2004-126 Council ResolutionI CITY OF LINO LAKES • RESOLUTION NO. 04-126 RESOLUTION APPROVING AN APPLICATION FOR A CONDITIONAL USE PERMIT FOR A RESIDENTIAL PLANNED UNIT DEVELOPMENT AND A DEVELOPMENT STAGE PLAN/PRELIMINARY PLAT FOR THE PROPOSED MARSHAN TOWNHOMES 2ND ADDITION WHEREAS, the Lino Lakes City Council makes the following findings: Findings 1. Hokanson Development has submitted an application for a conditional use permit for a residential planned unit development (PUD) and a development stage plan/preliminary plat for the PUD. 2. The site includes four acres at the northeast comer of Lake Drive and Aqua Lane. The application includes 23 dwelling units, for a net density of 5.99 units per acre. 3. The comprehensive plan guides the four -acre site proposed for development and the existing Marshan Lake Townhomes site for land use category Medium Density Residential: 3 -6 units per acre. 4. The site is zoned R -3, Medium Density Residential, per Ordinance 02 -04. 5. A residential conditional use permit PUD may include a variety of residential units, including single family and multifamily units as long as it complies with the density requirements, as stated in the zoning ordinance, Section 2, Subd. 10.A., Purpose and Intent (for a planned unit development). 6. The maximum allowable density within an urban residential PUD shall be consistent with the density directives of the Comprehensive Plan, as stated in the zoning ordinance, Section 2, Subd. 10.D.3., Urban Residential Planned Unit Development Requirements. 7. The Lino Lakes Growth Management Ordinance, Ordinance No. 01 -03 establishes a goal to limit new growth n the city to an average of 147 new housing units per year, with the ability to exceed this target by 20% at the City Council's discretion . 8. The Planning & Zoning Board opened a public hearing on the application on June 9, 2004 and closed it on July 14, 2004. • NOW, THEREFORE, BE IT RESOLVED that the Lino Lakes City Council hereby approves the application for a conditional use permit/planned unit development and development stage plan. • BE IT FURTHER RESOLVED that the following conditions of approval apply: 1. Additional right of way shall be dedicated to Anoka County to total 60 feet from centerline for Lake Drive (CSAH 23). 2. Right of access shall be dedicated to Anoka County along CSAH 23 on the fmal plat. 3. The fmal plat must include larger individual unit lots to ensure that the eaves and any building projection meets the property line separation to meet fire protection requirements in the building code. 4. The City Engineer's comments in the July 9, August 6, and September 2, 2004 memos must be met to his satisfaction. 5. Park dedication shall be $28,170. A park dedication amount of $28,170 shall be deposited in escrow by the developer prior to approval of the final plat by the city council. The final park dedication amount shall be determined by a neutral arbitrator. 6. Existing buildings on the site shall be removed. 7. The existing well and onsite septic system shall be properly abandoned. 8. Stone or brick veneer base shall be included on all four sides of the buildings. 9. The project shall not be fmal platted until 2005 to comply with the growth management policy. 10. The revised design shall be submitted for review by the Rice Creek Watershed District. A permit must be obtained from the Watershed District prior to final plat approval by the City. 11. Building colors shall be reviewed by staff. 12. Homeowners association declaration/covenants must be submitted for City Attorney review as required by the City's fmal plat requirements. 13. This approval is based on the following submittals: • Existing Conditions, May 5, 2004, received August 20 • Preliminary Plat, revised August 19, 2004, received August 20 • Grading, Drainage and Erosion Control Plan, revised August 19, 2004, received August 20 Resolution 04 -126, page 2 • • Utility Plan, update received August 20, 2004 • Tree Preservation Plan, revised August 19, 2004, received August 20 • Landscape Plan, revised August 19, 2004, received August 20 • Landscape Details, May 5, 2004, received August 20 • Detail Sheets (2), May 5, 2004, received August 20 • Building Elevations and Floor Plans, 2 -unit and 3 -unit Buildings, May 6, 2004, received May 7 • Alternative layouts, faxed July 6, 2004 • Color building elevations received July 14, 2004 14. Developer shall convey to the homeowners association of the existing townhomes abutting the north border of the property an access easement that includes the existing access drive. Prior to approval of the final plat by the city council, developer shall submit a copy of the easement document and proof that the easement document has been filed with Anoka County property records. Adopted by the Lino Lakes City Council this /3111'2 day of • 2004. ATTEST: Ann Blair,jCiJty Clerk Resolution 04 -126, page 3 • i • STAFF ORIGINATOR: C. C. MEETING DATE: TOPIC: VOTES REQUIRED: BACKGROUND AGENDA ITEM 6 C Jeff Smyser September 13, 2004 Resolution 04 -126 Conditional Use Permit/Planned Unit Development and Development Stage Plan/Preliminary Plat Marshan Townhomes 2nd Addition Hokanson Development, Inc. 3/5 Hokanson. Development has submitted a request for a conditional use permit for a residential planned unit development (PUD), and development stage plan/preliminary plat. The subject site is four acres of property at the northeast corner of Lake Drive and Aqua Lane, adjacent to the existing Marshan Lake Condominiums. A PUD is required for multi - family development in a shoreland area. The site was rezoned to R -3 earlier this year, making it consistent with the comprehensive plan. ANALYSIS Land Use, Density, Zoning The table below identifies the existing land use and zoning as well as guided land uses for the area. Location Existing Land Use Guided Land Use Existing Zoning Site single family home and vacant Medium Density Residential R -3 Medium Density Residential North Marshan Lake Condominiums Medium Density Residential R -4 High Density Residential South commercial (Automotive Refinish Technol.) & residential Performance Lane Use and Low Density Sewered Residential GB General Bus. and R -1X Single Family Executive East Marshan Lake Condominiums Medium Density Residential R -4 High Density Residential West Lake Drive, Wenzel Farm townhomes Medium Density Residential R -3 Medium Density PDO i The following is a summary of the of the proposal: Gross Site Area Upland Area Right of Way Dedication Resulting Area Total Units Resulting Density 4.05 acres 4.05 acres 0.21 acres 3.84 acres 23 5.99 units /acre Marshan Townhomes 2nd Addn. page 2 The existing Marshan Lake Condominiums were approved in 1995, with the second phase approved in 1996. They were built at a density of 6.4 units /acre, in accordance with the approved site plans. The City began work on a new comprehensive plan in 1996 -97 and approved it in 2002. The entire Marshan Lake Condominiums site and the remaining four -acres now proposed for development is guided Medium Density Residential. This allows a density of 3 -6 units per acre. The project falls within this range. Zoning: The four -acre site recently was rezoned to R -3, Medium Density Residential to make it consistent with the comprehensive plan. The site is within a shoreland overlay district. The specific requirements relative to the proposed project are discussed below under "Preliminary Plat/PUD ". The shoreland ordinance requires a PUD for multifamily development in a shoreland overlay area. Growth Management: The City's growth management policy (Ordinance 01 -03) implements growth policies of the comprehensive plan. It establishes limits on the number of new units to be approved as well on the use of MUSA reserve. The site is within the existing MUSA, so the MUSA reserve limit is not applicable The 147 units per year have been reached for 2004 and the allowable 20% also has been used (see attached table). As of the August 23 City Council meeting, 133 lots have been approved for 2005, so there are lots available. However, this project will push into the discretionary 20% for 2005. Other projects listed in the table as "proposed" will push even further into the 20 %. PRELIMINARY PLAT/PLANNED UNIT DEVELOPMENT Section 2, Subd. 10 of the zoning ordinance discusses the purpose of a planned unit development (PUD). The application should be compared to these purposes in order to justify any flexibility requested by the applicant. Purpose and Intent. The purpose of this section of the Zoning Ordinance is to provide for the grouping of lots or buildings for development as an integrated, • Marshan Townhomes 2nd Addn. page 3 coordinated unit as opposed to traditional parcel by parcel, piecemeal, or sporadic approach to development. This section is intended to introduce flexibility of site design and architecture for the conservation of land and open space through clustering of lots, buildings and activities, which promote the goals outlined in the Comprehensive Plan or serve another public purpose. It is further intended that planned unit developments are to be characterized by central management, integrated planning and architecture, joint and common use and maintenance of parking, open space and other similar facilities, and harmonious selection and efficient distribution of uses. A residential conditional use permit PUD may include a variety of residential units, including single family and multifamily units as long as it complies with the density requirements. A non - residential conditional use permit PUD may include a variety of commercial and/or industrial uses. A PUD that includes a mix of residential and commercial/industrial uses must utilize the PUD zoning district as described in Sec. 9 Subd. 3 of this ordinance. The PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: 1. A development pattern in harmony with the objectives of the Comprehensive Plan. 2. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 3. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. 4. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. 5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. 6. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. • • Marshan Townhomes 2nd Addn. page 4 The following table summarizes project design elements: Buildings, Units: The layout of the project underwent significant redesign after the July meeting. Based on the direction from the P & Z, the three -unit building now is on the north side of the project site and all units front on private access drives. The proposal still includes eleven buildings. Ten buildings are twin homes, the other is a three -unit. They are all two -story structures. Each unit includes 1633 sf. The garages are similar in size to other recently approved PUD projects. The P & Z directed the applicant to provide guest parking, even if it means the project won't meet the open space or impervious surface requirements. The guest parking now is included. A PUD does allow flexibility for design. The zoning ordinance requirements are as follows (Sec.3, Subd. 4.B.2.b.4)): Exterior Building Finish: The exterior of townhome dwelling units shall include a variation in building materials which are to be distributed throughout the building facades and coordinated into the architectural design of the structure to create an architecturally balanced appearance. In addition, townhome dwelling structures shall comply with the following requirements: a) A minimum of twenty -five (25) percent of the combined area of all building facades of a structure shall have an exterior finish of brick, stucco and/or natural or artificial stone. b) Except for brick, stucco, and/or natural or artificial stone, no single building facade shall have more than seventy -five (75) percent of one type of exterior finish. c) For the purpose of this section, the area of the building facade shall not include area devoted to windows, entrance doors, garage doors, or roof areas. required proposed unit size R-3: 920 sf 1633 sf setbacks local street arterial street side yard rear yard 30 ft or 25 ft from internal streets in PUD 40 ft 10 ft 30 25 ft 40 ft 25 ft 30 ft impervious max 65% shoreland: 35% 33.8% open space 50% for PUD 50.2% height max. 36 ft. 26 ft. at peak Buildings, Units: The layout of the project underwent significant redesign after the July meeting. Based on the direction from the P & Z, the three -unit building now is on the north side of the project site and all units front on private access drives. The proposal still includes eleven buildings. Ten buildings are twin homes, the other is a three -unit. They are all two -story structures. Each unit includes 1633 sf. The garages are similar in size to other recently approved PUD projects. The P & Z directed the applicant to provide guest parking, even if it means the project won't meet the open space or impervious surface requirements. The guest parking now is included. A PUD does allow flexibility for design. The zoning ordinance requirements are as follows (Sec.3, Subd. 4.B.2.b.4)): Exterior Building Finish: The exterior of townhome dwelling units shall include a variation in building materials which are to be distributed throughout the building facades and coordinated into the architectural design of the structure to create an architecturally balanced appearance. In addition, townhome dwelling structures shall comply with the following requirements: a) A minimum of twenty -five (25) percent of the combined area of all building facades of a structure shall have an exterior finish of brick, stucco and/or natural or artificial stone. b) Except for brick, stucco, and/or natural or artificial stone, no single building facade shall have more than seventy -five (75) percent of one type of exterior finish. c) For the purpose of this section, the area of the building facade shall not include area devoted to windows, entrance doors, garage doors, or roof areas. • i i Marshan Townhomes 2nd Addn. page 5 We received building elevations on July 7th. They show a light brown vinyl siding with a darker brown vinyl shake in the gable ends. A dark brown brick veneer base is shown on the front of the buildings, though none on the sides or backs. At the July 14 P & Z meeting, the applicant agreed to include stone around all four sides of the buildings and submitted revised elevations showing this. Structure Setbacks: We have been experiencing confusion among builders due to the adoption last year of the International Building Code. Fire protection requirements in the code dictate a minimum structure separation from property lines unless the structure includes specified fire protection elements. To meet the code requirements, the furthest projection must be at least three feet from the property line or special fire protection requirements apply. This would include no openings such as windows or soffit vents. Lino Lakes has made the decision that the building must meet the three -foot separation from the actual property line of the unit rather than outer border of the larger common area property line. This includes the sunrooms on the rear of the buildings. The individual unit lots must be platted deep enough to ensure that this three foot separation is met. This must be shown on the final plat. Streets, Access: The plan shows additional right of way to be dedicated for Lake Drive (CSAH 23). This would meet Anoka County's requirement for 60' from centerline. Access to all buildings would be via private drives off of Aqua Circle. The drives are 24 ft. wide, back of curb to back of curb. The Century Farm North project has the same design for the townhome access drives. The existing Marshan Townhomes have wider access drives: 28' back of curbs. The proposal is acceptable. The P & Z recommended a new layout at the July 14 meeting. A new preliminary plat received July 30 shows that layout. At the request of the P & Z, I contacted the Fire and Police Depts. to ask if the length of the driveways in the existing development has created any public safety concerns. The Police Dept. said there have been no problems from their perspective. The Fire Chief also informed me that there have been no problems and since the existing townhomes used this design, he had no concern. Though the new proposed driveway is even longer than the existing ones, the Aqua Lane and Lake Drive are close enough to provide access in addition to the driveway itself. For future new development, we probably should consider turnaround areas on drives of this length. Guest Parking: The P & Z desired that guest parking spaces be added, even though this would reduce the open space and increase the impervious surface area. The applicant has included guest parking stalls in the revised plans. The drive /parking areas would still be at least 20 feet from the new right of way of Lake Drive. The proposed alternative is workable. 1 • Marshan Townhomes 2nd Addn. page 6 Stormwater Management: The existing stormwater management design for the area accommodates development on this site. Even so, the proposal includes some onsite infiltration. The Rice Creek Watershed District requires District review for multi -unit development over 2.5 acres. The Watershed District granted preliminary approval on June 23, though the site was redesigned since then. One of the conditions of approval is that the new design be reviewed by the Watershed. The developer should take note that the current design must be approved by the Watershed. Utilities: The project will be served with water and sanitary sewer via existing facilities in Aqua Circle. The pipes in the private drives will be private utilities, owned and maintained by the homeowner association. Landscaping: The existing townhomes screen this site from the lake, so screening is not an issue as it might be for lakeshore property. The proposed landscaping is adequate, Several species were changed according to the Environmental Board's recommendations, and planting locations on the new plan would not create sight line issues for the Aqua Lane /Lake Drive intersection. Lighting: No street or yard lighting is shown on the plans. There is no reason to provide any such lighting. Park Dedication: The following information was discussed at the July 14 meeting and is reiterated here. The applicant has maintained that land dedicated with the larger development included the dedication for most of the current four -acre site. Staff has researched the file for the Marshan condominiums project. The situation is complicated because there is some, but not complete overlap of the two project areas, the original project was not completely built, and the ordinance requirements for park dedication have changed. The 1995 project included 29.9 acres. A total of 139 units were approved for the project. The density then was 139/29.9 = 4.65 u/a. Part of the site included an area of 1.5 acres labeled "future commercial" in which no dwelling units were shown. One 5 -unit building did not get built, as it was on land not ultimately platted as part of the project. Both of these areas are within the four -acre site of the current proposal. At the time, the subdivision ordinance included a progressive scale: the percentage of land for park dedication increased as the density of a project increased. (This was adopted with Ordinance 05 -91.) A density of 3 to 5 units per acre required a park dedication of 12% of the land. Twelve percent of 29.9 acres is 3.6 acres. The developer dedicated a 3.0 acre park and a trail corridor of 0.6 acres, for a total of 3.6 acres. i Marshan Townhomes 2nd Addn. page 7 Current park dedication is $1665 per unit when land is not needed. For the 23 units currently proposed, this would total $38,295. The developer maintains that he should not be charged dedication for the 1.5 acres "future commercial" area or for the area where the five units didn't get built. It is reasonable to give credit for the five units that did not get built, and staff recommends doing so. This reduces the dedication by 5 x $1665 = $8,325 . However, it is not appropriate simply to give credit for the 1.5 acres by completely eliminating it from any new dedication. There were no units shown in that area on the 1995 plan. Though the land was included in the calculations for the original project, the additional units were not. Removing the 1.5 acres from consideration for additional dedication would be like not charging park dedication for new units being built in the spaces between the existing buildings. (There are 11 units in that area on the new proposal. Had there been another 11 or 12 units there, it would have raised the density of the 1995 project to 5+ units /acre, which would have required a 14% park dedication (139 + 11 = 150 and 150/29.9 acres = 5.02 u/a). This would have required a dedication of 29.9 acres x 14% = 4.19 acres. Since 3.6 acres was dedicated, there would have been a shortage of 0.59 acres of park dedication.) It is appropriate to get additional park dedication since the additional units generate additional demand for park services. It also is reasonable to consider giving some credit for the past park dedication on the 1995 project. The ordinance at the time included an equation for calculating cash dedication. It used a land value of $10,000 per acre. This seems reasonable. The project density fell into the 12% park dedication category. Applying this to that land value yields 1.5 acre x $10,000 = $15,000. $15,000 x 12% _ $1800. This is a reasonable credit for the past dedication. Summarized, this all results in the following: 23 new units x $1665 = $38,295 less credit for 5 units: 5 x $1665 = ($8,325) less credit forpast dedication on 1.5 acres = ($1.800) total new park dedication $28,170 Staff recommends a park dedication of $28,170 for the new project. ENVIRONMENTAL BOARD The Environmental Board reviewed the application on May 26th. The comments are attached. Changes to species that were not done on the July 30 landscaping plan are included in the conditions of approval. Inspection of imported soils is required by • 1 Marshan Townhomes 2nd Addn. page 8 development agreements. Irrigating the sod areas is listed in notes on the landscaping plan. PLANNING & ZONING BOARD The P & Z reviewed the application and recommended approval, with conditions, on August 11t. The conditions are included in Resolution 04 -126. OPTIONS 1. Approve Resolution 04 -126, approving the Conditional Use Permit/Planned Unit Development and Development Stage Plan/Preliminary Plat. 2. Deny the application. RECOMMENDATION Option 1 • LOTS /UNITS as of August 18, 2004 41. Marshan Townhomes 2 "d Ad. Development Name approved prelim. plats Prelim Plat Phasing plans by year (lots /units to be final platted) year end 2002 2003 2004 2005 2006 2007 2008 2009 page 9 2003 -09 total max. 1029 Stoneybrook 103 51 0 2nd Addn 0 52 52 Century Farms North 249 56 65 52 43 33 249 Keefe: prel plat, not final plat 1 1 1 Morton (minor subdiv) 0 1 0 1 Ravens Hollow 56 0 56 56 Haley Manor (10 new lots) 10 10 0 10 Crystal Cove 3 3 0 3 Millers Crossroads 152 22 47 51 32 152 Lakeview Estates (2 new) 2 2 2 Snell (minor subdivision) 0 1 1 Pheasant Hills Pres. 13th 1 1 1 Justin's Preserve 1 1 1 Marshan Estates 4 4 4 Rice Creek Church duplex 2 2 2 Rice Church: Oakwood View 10 10 10 Junes Addn 2 2 2 Highland Meadows East 2nd 18 18 18 0 proposed 0 Pheasant Hills 12th island 8 8 8 West Shadow Ponds 2nd Add 1 1 1 Marshan Townhomes 2nd 23 23 23 Fox Den Acres (resubmittal) 56 11 45 56 total 51 148 176 176 120 33 0 0 653 remaining of annual 147 remaining of 1029 for pre -2010 exceeds target of 147 by percent -1 1 -29 -29 27 114 147 147 29 29 0.7% 19.7% 19.7% 376 TKDA ENGINEERS • ARCHITECTS • PLANNERS MEMORANDUM 1500 Piper Jaffray Plaza 444 Cedar Street Saint Paul, MN 55101 -2140 (651) 292-4400 (651) 292 -0083 Fax www.tkda.com To: James Studenski, City Engineer Reference: Marshan Lake Townhomes Copies To: 2nd Addition City of Lino Lakes, Minnesota Comm. No. 12701 -002 From: Scott A. Brink, P.E. Routing: Date: September 2, 2004 Engineering Reviews for this proposed development were previously prepared and presented in memorandums dated December 5, 2003, June 4, 2004, July 9, 2004, and August 6, 2004. The following documents have been received since the August 6, 2004 review: 1. Cover letter from Schoell and Madson, Inc. dated August 20, 2004. 2. 10 -year storm frequency calculations dated August 20, 2004. 3. Application for General Stormwater Pennit for Construction Activity 4. Rice Creek Watershed District Infiltration Worksheet dated June 21, 2004. 5. Copy of Rice Creek Watershed District Permit Application Number 04 -075, dated August 20, 2004. 6. Storm sewer drainage area sheet dated August 19, 2004. 7. Cover letter from Ronald Fuchs dated August 20, 2004. 8. Full size and half size preliminary plan sets dated August 19, 2004. Comments provided per the previous review memorandums remain effective as applicable. Additional comments are as follows: 1. The property is adjacent to the Anoka County Roadway. Therefore, the Preliminary and Final plats will require the review of the County. It is not expected that any construction related permits from Anoka County will be required. However, any side grading into the Anoka County right of way would require a permit. II,. . The Landscape Plan does not appear to show any nQ lanti p b locations that would interfere with underground utilities. However, there are at least some trees shown located within swaled or infiltration areas. Special care must be taken during actual construction and subsequent plantings to assure that plantings will not be installed over any underground utilities or within drainageways. It is suggested that i Marshan Lake Townhomes Review City of Lino Lakes, Minnesota Page 2 September 2, 2004 plantings be installed a minimum of 7 -10 feet from underground utilities in the event any maintenance or excavations should be needed in the future. 3. The Grading Plan has been revised since the previous review. The most current plan now provides for surface water runoff to essentially be retained on the site (for infiltration) prior to discharge to the existing City storm sewer system. The drainage system shown is acceptable, subject to any further comments or requirements of the Rice Creek Watershed District. However, a construction detail for the drain tile must be provided, i.e., specification of pipe, crushed rock/fabric encasement details, etc. 4. A copy of Rice Creek Watershed District Permit Application Number 04 -075, dated August 20, 2004 has been provided. A conditional approval pending receipt of changes (CAPROC) has been received. All conditions of the RCWD C .PROC must be met as stated. These conditions generally include revisions to the grading plan to incorporate runoff infiltration, along with several administrative related requirements. The grading plan shall also be revised to include catch basin inlet protection as specified. 5. Because the site area exceeds one acre, the development also falls under the new rules requiring an NPDES permit, and a copy of the application has been provided. A Stormwater Pollution Prevention Plan (SWPPP) must also be provided to the City in accordance with NPDES requirements. Silt fence and erosion control as shown and detailed on the plans shall be installed accordingly. . Per the Survey and Existing Conditions Plan previously submitted, several buildings including houses, barns, sheds, and a garage all exist on the site. Demolition, removal, and grading of the site will therefore be required. The applicant will be responsible for the complete removal of all buildings, foundations, underground and above ground items, capping of any existing utility connections and wells, and removal of any underground, fuel storage or septic systems that may exist. All debris and unsuitable material must be removed from the site. Any material imported to the site must be approved by the City Engineer. 7. Geotechnical information was previously provided. As previously stated, additional excavation of fine alluvial silts and replacement with compactable granular material may be required for construction of the buildings and private drives. Suitable granular material must also be placed beneath the designated infiltration areas. Groundwater levels may also necessitate dewatering for the utility installations. Any imported topsoil, fill material, or granular materials for roadway, building foundation, or other use (material and source) must be approved by the City Engineer. 8. The preliminary plat provides for standard drainage and utility easements (10 feet in width) around the perimeter of the property as required.. In addition, 44 foot wide drainage and utility easements covering the private driveways are also provided. As previously stated, the driveway easements shown (drainage and utility) must also be dedicated to include access. The utility plan has been revised per the comments provided in the previous review. All utility installations (including sanitary sewer and water), shall be considered private and will not be owned or maintained by the City of Lino Lakes. In addition, the proposed streets /driveways do not meet the minimum width requirement of the City of Lino Lakes and shall also be owned and maintained privately. Private ownership and maintenance responsibilities must be addressed and detailed in the Developer Marshan Lake Townhomes Review City of Lino Lakes, Minnesota Page 3 September 2, 2004 Agreement between the City and the Applicant. The utility plan shall also show the specific locations of individual valve boxes and their service termination points (between street and building). Individual sanitary sewer and water services must also meet minimum separation distances. 10. In addition to the requirements of the City of Lino Lakes, all utility work shall be performed in accordance with the Standard Specifications of the City Engineers Association of Minnesota (CEAM). Water pipe and appurtenances shall meet the requirements of the City of Lino Lakes, and as follows: Hydrants - Waterous Pacer WB -67; Valves - Mueller A2370 -20 or equal. DIP pipe shall be Class 52. All sanitary sewer service pipes shall be SDR 26 or Schedule 40. The location and number of hydrants will be subject to the review of the City Fire Chief. Safety and traffic control during construction must be provided in accordance with the State of Minnesota Manual of Uniform Traffic Control Devices (MUTCD). 11. Catch basin/manhole castings for the swale /turf areas must be specified, subject to the approval of the City of Lino Lakes. 12. The applicant shall be responsible for obtaining permits from the Minnesota Department -of Health and - the Minnesota Pollution Control Agency for the water and sanitary sewer installations as required. 113. All street restoration shall be performed in accordance with the requirements of the City of Lino Lakes. • Memo Environmental To: Jeff Smyser From: Marty Asieson CC: Michael Grochala Date: June 1, 2004 Re: Environmental Board Recommendations From 5/26/04 The Environmental Board made the following recommendations at the May 26, 2004 Marshan Townhomes 2 "d Addition 1. Ensure that the lighting plan conforms to the City code. 2. Make changes to the landscape plan species list as per December Environmental Board recommendations: • Change Black ash to Green ash or one of the native.oak species. • Change Colorado spruce to white spruce. • Change Austrian pine to Red or White pine. • Change Autumn applause to Northern pin oak. 3. Reduce impervious parking surfaces if possible. 4. No soils should be imported or exported with out City permission. 5. Deep tilling should occur on all planting areas. • 3rd S 6. Re -seed native seed in pond area. Use the City specifications. This should be coordinated between the City, Developer, and the existing town home association. 7. All sod areas should be irrigated. Motion made recommending to approve by Grundhoffer, 2"d by O'Connell, all were in favor. West Shadow Ponds 2"d Addition 1. Wetland areas and buffer areas proposed are identified with signage describing no fill, cutting or dumping. 2. The City should approve all imported or exported soils. 3. All soils to be restored with plantings should be deep tilled to a minimum depth of 6 to 8 inches before planting. 4. Item 5a of deed restriction document include language that includes specifications for City native seed mix in buffer areas if disturbance occurs or replanting occurs. 5. Show the location of tree preservation fences on the plan. Motion to recommend approval with suggestions made by Bauman, 2nd by O'Connell, All were in favor. • Page 2 -59- MARSHA[ SAN I5 /8/ 10W S GSA TONE. 8 RICE LAKE - 6 0 - PROPOSED LAND USE PLAN LINO LAKES COMPREHENSIVE PLAN Pubfic/Serrti-ipubric'' Medturrt Density _ Residential • ZONING MAP I, Iimuzullf millnalmor ro 21) sizscar rat 1NRL -:_ Numbs IWv.M9 abbo._1 estimated diameter M Mahn than loaf above d. 1M e.000d number If any) donate, the number of bunk. et that location 1 Modes a dead bee). . Number /Moons owing shrubs dmas Its diameter In feet Demise deciduous bas. Q Denotes shrub. Denotes awdemus bee. r'- %Denotes bee en. A Denotes Ash Diomede M Donates Arbor Vitae 6E62 BF Vendee Banam 14 BA Denotes Basswood 0 Denotes Birth BE Denotes Des Elder Be Denotes Butt.mot o tU Denotes Duet, CA Denies Catalpa CR Dense. Cedar Cherry CH Donato. 000600ood DD Dandles Dogwood EL Denotes Em J FA Denote. fruit CH Denote. Ong. N Oman. Flo INC Denotes Ron. 0Mslnut N� Denote. Ironwood Doman dunlper RC Donato. Northing coffee g Denotes 1.0.e LO Denotes east - - - - -M Oman Maple VP Denote. pogo Plot O Dent. a • Denotes PO Denotes Poplar BO Denote. Russan 01.. SM Denote. Sear Morn 5P Innate. Spun N 1D Denote. Tree Deciduous lE Demise t Evergreen 6A Denote, Ennui M Denotes Snow .� — —00-- S 00 °18'08 °W mod,-• ---\ 1 233.22 9l'bBt w L- ' Mk\ �5\ 00°18'08tW �g e d I \ 417.58 st § lie / g OI 1 \1 r - \� 1 J 1 1 l I. III 1\ m lip11�� OOINL" / nN� \/ N �V / rorn - ITLY frArt W. Line of Gov't. Lot 2, Sec. 20, T. 31, R. 22 STATE 2 L 1 ` 1LUNic y� e,, 111.01 Fob Right oowhW�l' tk, �� 63 St to T take OP1Ve \ M 1 No. 4.91 leddne 1.440 6561046.40 OWE Wain k6® PUS 110 1010 hsa4p4.M 1!d 1000 7710/00010 01 Iberia ratify Wt eb Ma we pinned 0 ws re one ✓ duvet nnnbh D s aM 6d I be o aoed trelmind le et Mu >Y. ..P,AY t live& Meg D ec 1/6/10 god. Re. 0011 Pena M One 0 60 *Schoen & Madison, Inc. Engineering • Bervq..6 • nennhvg E SOB Testing • vIto mmMel Serving. �Y�wd w.,d..esa.,ea, Lineepon, ghee. Et Feer.lareween 85070-04 Mee 062) Nb- R6- ba Deg 50400 thmaoetoware- hm5M1548-2060 mod Hokenson Development, Inc. 004 Meng ebv.1 Nt Mein MN. 66464 7763) 0116-3100 RECEIVED AUG 2 0 2004 CITY OF LINO LAKES LEGEND gg. ----- EXISTING CONTOUR 6OIINOARr UNE oRANACE/MT m El5MA' 4< ! 1 EXISTING STORM SEVEN ERISMO RURONC 00010)0 STORM 78441E/01 EXISTING EES /IES 6100 ItIPRAP E%5m.D 01714INOIM 0psnli 00NCRE,E 000.7 FEET no4d teenfLoM sh.n Te6M,a 0.6 led Addeo. LM Lek... Mbee.0l. wales EXISTING CONDITIONS Od. 6/06/04 3, 11 MB Project 6embm: 60500 -00 (gyp Aa Ar 60' 1� <4 As Jr o • 49) BUILDING SET C.SAJI. No. 23 - 40 N. min AQUA INC 30 N: min. AQUA CIRCLE - 25 IL min. PERINE020 - 30 R. PRIVATE STREET TO c*RACE DOORS - 70 R min 561E (000dine x.0.0000. ) - 25 R nen SITE AREAS: 00000 AREA, 176.36176 sq ft 405 acres R0V IEDICAT11116 9,392.45 s4 Ft. 021 aces NET OREN 166,96931 sq. ft 104 acres IMPERVIOUS SURFACE 3300 GREER AREA - 6622 OPEN AREA - 50.201 t COMM AREA y Zoned: 0 -3 Guide Plan: Ned 0meiy gannet le Rome to P110 SITE DENSITY: TOTAL UNITS • 23 NET 0000177 • 23/4.05 • 5.6 UNITS/ACRE LAKE DRIVE MEDICATION NET 0015177 • 23/304 a 6.0 UNITS /ACRE LOT AREAS: 100 /01.11 1/1 Area. 2.605.70 s4 0e. 0.0616 .ores LOT /0.K 2/1 Area. 1,900.29 s4 Ft 0.0456 acres LOT /MK 3/1 Areal 2.605.73 MI Ft. 0.0616 acres L0T /5LK 4/1 Area, 06550 s4 ft 0.0616 acres LBT /OLK 5/1 Area. 2.6010 s4 Ft 50606 acres 107/313 7/1 Via, 24005.0 ssq. ft 0.0616 66 acres LOT /OLK 0/1 Area. 2.605.0 sq. Ft 00616 acres MDT /HLK 9/1 Men 2.607.0 sq. Ft 00606 sore. LOT /5LK 10/0 Pr ear 2405.0 04 7t 00616 acres 107 /OLK II/0 Area. 2.60570 s4 ft 0616 ewes LOT /ILK 12/1 Area. 2,60570 sq Ft. 1616 acres 107/010 13/1 Area, 2.665.70 sq Ft 0.616 acres L0T/B.K 15/1 Area, 102/310 16/1 Area, LOT/111.K 17/1 Area. L0T/HLK 10/1 Area. L0T /OLK 19/0 Mon 102 /310 20/0 Area, L0T /HLK 2111 Area. LOT /0.K 22/1 Area. LOT /OLA 23/1 Area. 1OT /6LK 04/1 M.,. DESCRIPTION, 2.6650 sq. Ft 0.616 acres 24050 sq ft 0.0616 sores 2,605.0 sq. ft 00616 CO'., 2405.0 sq. 75 0.616 acres 24050 s4 Ft 0A616 acres 2,665.0 sq. ft 00616 acres 2.605.70 s4 ft 0616 acres 2.60570 sq Ft 0.616 acres 105,095.62 sq ft 2.430 saes SEE LEGAL OE 0011 ON SHEET 2 et 11 LEGEND 07180307 UNE - DENOTES PROP05E0 7.03131 NIS - - - - - OFHOES MIMIC SETBACK Sall Type . 2NA, 200 = 76mernen Fite Send SCALE BENCHMARK' R FEET *Mop 000 Hydrant A N.N. quadrant of the ges of Elewibn - 00727 leapt (N.G 2.p 1929) IO. lablers kW Dernirll.B 031 kW Oessi001 OT, I finny ferny Bd UM gas .r renal yen or men or 4054 mpmMee eel 16.11 es a Neon..70fedmd miner mw Se he d By ONO d 16..4.4. em.e.e1Y 0 - ennae eF IS Schoell & Manson Inc. _ _ Engineering • Surveying • Planning Sag ThlOq • • Environmental Service* Oriel ierele es OiFSpRenee Bnln.d MINI s ittamn.002. BAe 00 peenO16- ]mi-b� Nor060 10620041-0000 Can Hokaneon Development, Inc. P 637.0 0000.13 1130.0 NE Blades M. 61434 0761! 736-5130 Aged NemAxNOF Yvdm. Teem6em.e Sad Ad.3 , 1 Lino LaKSa. 0lamoaalA 1 06. Q N 6 /BB /O6 Q 1/6/M m ®PW 303 me 4 m 1/21/01 MEI BAT 00 Bad T0• PRELIMINARY PLAT Bret �6 K y 11 '/21/61 ma PIE Oro Kneen AdeO Ale 6MPo1 Oq. Ne. IBB nand 6F A Opp 0160000/e10p 0e roenNNG 42. Q\ 0 GROOM FLOOR 13. 1 C(RM 5 RE041444 lE F RAORO ALAI 5 �IO THE POSMV 20045.E 10 A0 TO ONO PUNS ARE 14. corarort 5 pEOPONSOL�IT111CNI0N..P"O' NSIWp O - ANC GUIDER SMOOTH 1 SLOPES 1 H., PRWME � h� ORAWBGE. COOT IF FWlp E RE[NINEA \' �/V � 'i��y \�� 13. INSTALL A MINIMUM 4 IES�' dA4 5 M.,GREA4TE I B ` \ \`AjyyY.,, �'`�. EEG 7D `\ I -t �ag` 00101ES 80111141741 UNE - - -90 <2'4. - EXI5TRIO SlM{TL. - - - - - - 004016 0OANAGE/ 115142 FA5E4400! ..\ 998 pAppgglik - ;;;E poD6 ERosEN -C CC DENOTES EASRJG STORM SEVER NC 4' OR4RN ME 3ERMAN CONTOUR CK wow IREZERgaggEMSDLIOPOSED RO LOL lw ENTRANCE PERCENT DP-CRADE Y„ PERCENT OF PROPOSED EEVA1l0 - TUNA- OENO6 CURB CUT CONSTRICTION. S4WCUF- \ MARRO S FO RESTORE SECTION. R CURB AND CUTTER REMOVALS.- iT EET TO LURCH 0 a DENOTES COSM0 STOR 0 DENOTES EMSON SANITARY DEVOTES DAME HYDRANT E%5TIN0 PAVEMENT \ .(1 ,I /�TAB ON GRADE • iF� OARa0E FLOOR (SMOOTH DENOO 2' -0' CURB CUT (SEE DEAR) EROSION CONTROL NOTES 1. ALL PERIMETER SRI FENCE N!0 ROOT SHALL BE 145TALUO PRIOR TO CDI 111011ION. 2. 144E CONTRACTOR SIAM CONSTRUCT ORNNA0L . TO SIDE GRADING. 3. THE CONTRACTOR SHALL GRADE SITE AND DISTAL URURES. 4. WITHIN TWO BEERS OF SITE GRADING. ALL DISTURBED AREAS STALL BE STAMl12ED MTN SEED. SOD OR ROCK BASE. RHEA TO lANDSC1P41 PLANS FOR MATERIALS. 5. ALL EROSION CONTROL MEASURES 9419.1 BE INSTALLED AND MM4TNNEO M ACCORDANCE 4801 0442, ARb WAIER511E0 DISTRICT PHAM.5 S. THE CONTRACTOR MOLL MAROR ALL. EROSION CO0IROL MEASURES. INCLUDING THE REM02AL 00 ACCU1RAA1E0 51.T N FRONT Q SGT FENCES 1040010 THE OURA110N OF TIE CONSTRUCTION. 7. ANY EXCESS SEDIMENT N PROPOSED BASINS SHALL BE REMOVED BY THE CONTRACTOR. B. REMOVE ALL EROSION CONTROL MEASURES AFTER VEGETATION 5 ESTA(SHE0. 9. TIE 410010254115 91211 READVE ALL 5005 AND SEM4ENT TRACNFD ONN 1%4510NG 5400040 AND PAVED AREAS. 10. IF BLOWING MOST SECONE5 A NUISANCE, THE CONTRACTOR 50011 APPLY WATER FROM A TARN TRUCK TO ALL CON51NUC50N AREAS 11. SWEEP ADJACENT STREET N ACCORDANCE WRH 0141 REOUE0EMDRS. EROSION & SEDIMENT CONTROL MAINTENANCE: 1. INSPECT SILT FENCES AFTER EAOI RAINFALL ARIA AT LEAST MIRY MTRRG PROI3NGED RAINFALL MOEDMIE1Y REPAIR FACED OR FAILING FENCES. 2. REPLACEMENT - FABRIC SNAIL BE REPLACED PROMPTLY WHEN R DECOMPOSER OR BECOMES NEFFECIRE BEFORE THE BARRIER 5 NO LONGER NECESSARY. 3. SETAMFNT REMOVAL - SEDIMENT GEPDSRS SHALL BE REMOVED 04411E EACH MOM EVENT. 4. ANY REDREW REMAINING N RACE AFTER 111E SILT FENCE OR FILTER FABRIC 5 140 LONGER REQUIRED SHALL BE GRADED TO CONFORM WITH ME EXISTING GRADE. PREPARED. AND SEEDED WITH THE APPROPRIATE 5® UM AS 000EOTED BY THE OWNER -E-4 \f� AUG 2 0 2004 CITY OF LINO_ KI GRADING NOTES: 1. CONTRACTOR SHALL CONTACT 'GOPHER STATE ONE CJVL WIT1*4 TWO *ORNNO OATS PRIOR TO EXCAVATION/ CONSTRUCTION, FOR UNIUTY LOCATIONS TARN 571E5 METRO AR ES I- 454 -0002 OR 751 -FREE: 4 -1100- 252 -1404. 7. CONTRACTOR SHILL FIELD VERIFY 144E LOCATIONS NO EEVA110415 04 0050440 0113116 NO TOPOGRAPHIC FEATURES PROP TO START OF SITE GRADING. THE CONTRACTOR SAIL IMMEDIATELY NOTIFY THE PROJECT ENONEEi OF ANY 0SCREPN4CIF5 OR VARIA11515. 3. SUITABLE 0000440 MATERML SHALL CONSIST OF ALL SOIL ENCOUNTERED ON THE SITE MITI DEMON OF TOME, BESTS. ORGANIC MATERIAL NM OTHER UNSTABLE MATERIAL S4000NE TOP50I1. AND GRANULAR GIL AT LOCATIONS DIRECTED BY CONTRACTOR. 4. SUBGRADE EXCAVATOR SHALL BE B4CKFBLED IMMEDIATELY AFTER EXCAVATION TO HELP OFFSET ANT STAMI/1Y PROME45 DUE TO WATER SEEPAGE OR STEEP SLOPES. WHEN MACRO NEW SURFACE MAMMAL ADJACENT 10 E OM= PAVEMENT. 171E EXCAVATOR 54411 BE BACN0LLE0 PROMPTLY TO AVOID UNDERMNMG O THE ENSUE PAVEMENT. 5. CONIIUCT544 51441L BE RESPONSIBLE FOR AIJ. HORIZONTAL N10 VERTICAL CONTROL I. GRADES SHOWN ARE FINISHED GRADES. CON11501OR SHALL ROOM GRADE TO S000RADE ELEVATOR. LEAVE STREET RENT FOR SUBBASE. 7. ALL EXCESS MATERIAL. BTRMNOUS SURF-ACM. CORCRETE ITEMS. ANY ABANDONED 4111.111 REVS. A140 OTHER UNSTABLE 1.NTEMALS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SRAM BE DISPOSED OFF THE L'ONSOUCIION SITE B COMPLETION OF SITE GRADING OPERATIONS SHALL RESULT IN ALL AREAS BEING GRADED TO 'PLAN SIMGTUDE ELEVATION'. BUILDING PAO AREA, AWL BE DETERMINED BY REFERRING TO THE ARCHITECTURAL DRAWINGS. THE PARKING LOT AND DRIVEWAY AREAS MIMI BE 0(0004NED WY RESEALING TO THE SUE PLAN AND PAVEMENT SECTION DETAILS FOR LOCATION AO LAIRS OF 00U4050115 PAVEMENT SECTOR. B. REFER T1 THE m040410415 511E PINT FOR MOST CURRENT HORIZONTAL 11/0400415 AND 511E LAYOUT. 10. REFER 10 MUTT PLAN FOR SMEARY SEWER LIMN. WATER MAN SERVICE LAYOUT AND 9.05110715 AND CASTING AND STRUCTURE SCHEDULE 11. 144E MNIARRI GRADED SLOE FROM EDGE OF BULDN0 SHALL BE RCN6 IN l0 F1ET IeAd°°e Ole: AmmiN m Br Ale: INN,0.., 45, I Mehl •TIM UN Oh No n. P0<5' M m N TENT 9 Meet ..FN.itl.. NM Awl l u , , M1afd„d Wear .. Ow Mnd the TAMMIAFn.M. 'r,a.10a Q Ong. IA I Sehoell & Madson, Inc. _ _ EnTil T..Tl1M • Surveying • w.NRINB Soli Testing • Environmental Services ve4d,eLld.w. IDYL WW.M..1M.,.dW1 M4SIMNANA Bl _RD 1w oo MT571101-15 i CYTA Hokanson Develo nlant, Inc. r.,..............‘ p N... Melee MN. 5540 17631 7116 -3130 Frepol.e.Asaem PERM Te�wNan.. Mod ARUM.. LA. Lak.y Mko...l. OM. 5/06/041 e/Y!N RIMY MD MO p,,, WI GRADING, DRAINAGE AND. EROSION CONTROL PLAN 011= ...... 5 m �i //./II 61® TYTATMM OA r®e. MA Ed. erosNl pg. IA IEell - O.a.N TP M - • NO. NO IX 6.OIPN BUILD OVER END OF EXISTING 6' SERVICE RIM.800.3 *4V-684.50 VERIFY EI5TNG AVERT ELEVATION PRIOR TO TRUCTION 7 SUED MN- OVER END ERKtm1 6 910.8969 *40.99650 VERFY EXISTING AVERT ELEVATION PRIOR TO T9TRCLE CE EX TOR NT BUILD 011-1 OVER END OF EXISTING 6' SERVILE 401.890.66 m0.e65.6. VERIFY EXISTING EEIA CONSTRUCTOR Ce CT 5410 EX GEO HYDRA 90' BEND 'EXISTING STRUCTURE e• •.6'.TEE VALVE'". X 12' DIP WATERM4 8.6 TEE Er DIP MM 2 "TEE.--6 -6 DIP J CBUH-102 B• VALVE 11i71.697 O- N-" -- c4 CL56057 vim' 6.61NCREASE �f • 6. 90' BEND W' BEND 0 1. J, A ERLY \ No 0114411911. 1Ae8811 34 r` - 1 - - - -- HYDRANT 6- VALVE ITS =I 'Emit NV_094.2 6• VINE TREE PROTECT L, f FENCE (TM) T 8.6 TEE A 1W -2 RM- 999.05 NV.B86.60 H. lT RM B9T 05 Av, 4.0 RW1094 0. a 0EH0 24 L 1 1 I", I -J L SCALE WARNING TIE CONTRACTOR SHALL CONTACT ALL RAMC FOR LOCATIONS OF ALL UNDERGROUND WIRES. CABLES. 9D9N115. PIPES. MANHOLES. VALVES. OR OTHER BURIED STRUCTURES BEFORE 01CGIN6 HE SHALL REPAIR OR REPLACE TIE ABOVE WHEN DAMAGED DURING CONSTRUCTOR AT NO COST TO D9NE01. SrA're �� rRUN 6P Au 2 2004 Oft OF 010 LWES 0 0 1 I 0 _.A. 3 1 II iI A z CONSTRUCTION NOTES 1. PRIOR TO CONSTRUCTOR, S CONTRACTOR S ALL SWING UTILITY LOCATIONS AND AVERTS. E ANY DISCREPANCY BETWEEN PLANS 401 AND FIELD E REPORTED TO THE OWNER IMMEDIATELY. . THE UIRIIY CONTRACTOR SHALL VERIFY THE LOCATIONS AND ELEVATIONS Of THE BUILDING PIPE SYSTEM PRIOR TO CONSTRUCTING SERVICE CONNECTIONS. 3. ALL UTILITY WORN SHALL BE PERFORMED N ACCORDANCE WIT1 NE Orr OF 161D LANES IPFOFI *0005 NM OUIDNG PERMIT REWA65FH15. 4. 6' WATERMAN SHALL BE CLASS 52 MP CONFORMING TO THE REQUIREMENTS OF AN51 /AWWA 0151/021.01 0110 C104 /121.4. HYDRANTS SHALL RE THE PACER AS MANUFACTURED 0Y RATER015 CO. OR APPROVED (MAL COMPLYING 0110 THE THE COY OF IINO LANCS. GATE VANES SHALL BE SINGLE DISC TYPE WITH RE5RIEN1 SEAT MEETING THE REQUIREMENTS OF AMY* 0509 AND THE REQUIREMENTS OF THE MINNESOTA 6EPARTMENT OF HEALTH. 5. SOLITARY SEWER SHALL IE 8' AND 0' PVC - 504 -55 UNLESS 010100 DIFFERENTLY. 1AM17101E5 STALL LE 46' OMIETER PRECAST REINFORCED ED CONCRETE N ACCORDINCE 0601 /51M a74. CASTING SHALL BE NEENAH 11-1642 WITH TYPE '0" COVEN. THE CONTRACTOR 001NL. VERIFY TYPE OF CONNECTOR MN CRY ENGm4ERING DEPARTMENT AND COORDINATE ANY REQUIRED CRY INSPECTIONS NEEDED FOR CRY ACCEPTANCE. 6. UTILITY TRENCHES SHALL BE COMPACTED TO 9577 STANDARD PROCTOR NAXMPA 041 DERRY (A5144 0699.76 OR 4251070 1 -99) FROM THE PPE ZONE TO WIIMIN THREE FEET OF THE GROUND SURFACE AND 10077 STANDARD PROCTOR N THE LIPPER THREE FEET. 7. CONNECTION 10 THE IXISn10 SANITARY SEWER MD WATER REWIRES *45PECTUR BY 11E CRY OF Imo TARES. 0. CONTRACTOR SHALL NOM' 09 CRT OF UCI LAMES 40 HOURS N ADVANCE OF WORKING MORN THE RIGHT OF WAY. CRY INSPECTORS 1451 OBSERVE AU. WORK COMPLETED ON TOWN CENTRE 1R0VE ITCL1101NG RE00VAL OF EKISIAO MIU6ROU5 PAVEMENT. EXCAVATION OF TRENCHES, PLACEMENT OF WATER NM AND SANITARY SEWER, UTILITY CONNECTIONS NI EX61M. LINES. BACKMR .015 AND PLACEMENT Of BITUMINOUS PAVEMENT. 9. CONTRACTOR SHALT INSTALL. INSPECT, NAINURN AND REMOVE THE NECESSARY MIRAGE FOR LANE GLORIFIES. AL TRAFFIC CONTROL DEVICES 110 SOONG SHALL CONFORM TO THE 69001 0. INCLUDING FETID WNJ11AL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS, .ANUARY 1990. ONE ELEVEN F000 1499(446 001(4 LANE IN EACH DIRECTION STALL BE PROVIDED AT 141 TIRES. 10. THE EXISTING BITUMINOUS PAVEMENT SHALL BE SAWOD IN ACCORDANCE WITH Mn /001 SPECIFICATIONS. 11. CONTRACTOR WILL RE RESPONSIBLE FOR OBTAINING 111E APPROPRIATE SEWER, WRIER AND PLUMBING PERMITS FROM 111E OI95 BUILDING DEPARTMENT. 12. GENERAL CONTRACTOR SPINE COORDINATE WORK WITH ALL VERY COMPANIES. 13. SANITARY SEWER SERVICE SHALL BE 6- PVC MO RATER SERVICE SCULL BE I' COPPER. LEGEND 31; 1• \ 49) DENOTES BWNO4NY LINE - - - DENOTES DWNADE/ U1UTY EASEMENT «' 0EN00E5 EXISTING STORM SEWER <: DENOTES PROPOSED SIDRN SEWER - - - - - DENOTES PROPOSED 4' DRAIN THE DENOTES DISTRICT WATER /ANN DENOTES PROPOSED WATERMAN DENOTES EXISTING SANITARY SEWER INHERES PROPOSED SANITARY SEWER DENOTES PROPOSED BUILDING O 9 DENOTES D5050 STORM NRNIIO.9/ CB S • DENOTES PROPOSED SCORN MANHOLE/ 09 4 4w - DENOTES PROPOSED FES / FES 0 /17IPRAP o DENOTES EXISTING SANITARY MANHOLE • DENOTES PROPOSED WORRY 0ANHOLE 4. ROOKS PROPOSED HYDRANT DENOTES PROPOSED CATE VALVE DENOTES EXISTING HYOPA01 1 1 -o- chew k 9MR1911rM Bl NIG 9ocliplNn: BT I hey bah WA ub M w rhea ET e. W weer N EinM WAe49Tee 010 UM 1 u ■ Tama PTMeN.4M When e h De MW M U. R.11 M 16eeeM.. .yyy ,R ,�{ /F1 ..4aL IePN FA M Schnell & Medson Inc. _ .. _ EndneeFRw • surveying • PI9Do9Hg DON Teeing • F virOnmAAM Service. CNN Hokanson Development, Inc. 6174 Wadi Street ILL Shine MN. 66494 17031 76eNT9O Rohl6RA+AP. Marsh* TP- 99.1»• Lure Lake., ,FHmiWePb OM. 6/06/04 MEN MSS FIAT n ,,,,,, W, ,e Beeetlitle UTILITY PLAN • �M M -11 /1./01 OMB Mt /cM6M n a nun eddencem. IONRMyeg 6eYeh WWI SW THE MAN BM Oe M.CVe905L9.I.o7 Sg0 5404 RMR4164Ce.ah Ohm ORD 5M- 7101 -Re NM M6906S IlmsOce 2/FOd -b MD SWAM Lemma MAR NAC sPoS/01 944 An 141E Ghee By N rope 0040900. '1 XXXXXXALL 7REE 71770 I.TOH� 9x15 ALONG 1REE (FORM. .p- 1' - ERL- No STATE TRUNK -114, ; N —_ _ No 49) z MELIEGIMI Number fel.e.g ebbrado estimated diameter in three feet above 9 .M. The d mnnbar (fl oyj denotes the number of 7171.4. al Not beetles t denotes dead t Humber foUawkq shrub. denotes ire dbmebn In foul Denotes deciduous bee Q Dante. shrub. Denotes coniferous bas. ' '. ' Denotes bee brie. Exempla•. BE0.2 A Denotes A h AV Denotes Pekoe Woe BF Moot* Beau 8. BA Denotes Baanaod 81 Dante. Birch BE Denotes Box Elder EN Daub. Butter*, 60 Denotes Brit CA Dote. Catalpa CR Denotes Cedar CH Denotes Cherry CN Denotes Cottonwood DC EL Denote. Dogwood En 7 FR Denotes Run CN Denote. Gingko H Denotes Hackberry 1.EDEtlD Denotes tree renurt Donut.. bee meeervad `) 0enote. tree preeer0.0on Units HC Denote. Hare Modred N Denotes Ironwood Al Denotes JuNpx 07 Denote. Kentucky Cones o Denotes IA= LO Denote. Locust M Denotes Map. MP Denotes Yugo Pine O Denotes Oak Pi Demote Poo PO Owed* Poplar RO Owneta Roe** 04ma SI Denotes Skean Mop. SP Denotes Spruce m Denotes Tree .eduo0e lE Demotes Inset Omni* Wal BI Denotes UllIow cm, 2 200i /,Am O ]0 60 90 SCALE N Ftff am Yew edr em 116*0 Bre .rile INNlldi.m N0 Ibvey red* let Db .be me meprel b v. mile , Amt mask.. .d 0W 1 a a Hmrtd nelm.W a l.ea w. 6».70 e1 w elm w 6.N... fJJ -�. ``�� 6rdfred Ix 0 Schnell & Madsen Inc. _ _ raroerwwr.re • 6urveybq • Pl.ru;.r6 8aB Red0t0 ° � N 6srVlew pam3mrmeafra909-Ir BHnres.ao 6.m Me. Meets. 6909-Ira ntlb.Ye.eels �0J?UO6 pwIWN66. 7031 -Hs WS aN+oefi ohm. MA keen -tan WS M.65 C e* HOkonson Development, Inc. 0174 M.wU Bbwe1 N.E. awn. MW. 86434 neat 796 -sae het. ll..eAmtloa N.relra. Te.nhom« be Adaeen Yee eeheer Iepwewb Dele 8/06/04 II/15/61 WSW nee WS ONE s/N/e1 BM NX/CM® NW ...."TREE PRESERVATION PLAN sear 7 11 ol jT' Ids s/NAl Ike. Ne. Inn ��; 16 010 Project Number. 02006-00 0 00 CV (I'pRME�L 01 STATE UNk am SUGGESTED PLANT SCHEDULE CODE OTT COMMON NAME/WIN NAME SZE ROOT WASDIES SNOWM I SHE PUNiIG REMARKS A TB ADRIAN BLAZE MAPLE Mr . x•mnonp Uld rred' 2' CAL B00 STRAIGHT LEADER *450 NU. CROWN 0 e NORTHERN PIN OAK 2' B&B STRAIGHT LEADER 00005. ...waddle CAW" AND Flu CROW C 0 PASCOE STEEN ASH Y B&B STRAIGHT LEADER Marlow Prinedvonim YON...•' CAL ANO Flu CROWN 0 B RED OAK 2' BAB 00*504T LEADER Gurus roar. CAL AND FULL CROWN E F 10 14 HARVEST GOLD CRABAPPLE WW2 2 'Chown Most' THORNLESS HAWNO04 1.5" CAL. L5• BBB BBB MU.D -STEM TREETOPS AND FULL 000504 MOLD -SHEAR TREEFORM Mateoen aneeell vat Manx CAL AND FULL CROWN 0 15 BLACK NUS SPRUCE IF C0N1 FIAT. FORM TO GRADE Mom OI.u'Masotti HT N t0 MOTE SPRUCE IF CONE 11A1 FORM 10 GRADE Pico Wow HT 1 15 WHITE PINE e' COST FULL FORA 10 GRADE Pines strobe. N1 SCHEDULE ARE FOR THE CONTRACTOR S CONVENIENCE. 0141040100 TO VERIFY GUANINES SHOW OM THE RAN. RECEIVED AUG 2 0 2004 CITY OF LINO LAKES No• �T 49) LANDSCAPE NOTES • ALL LANDSCAPE TREES, SHRUB, ER SHA*I. OE IRRIGATED. • 500 AND IRRIGATE ALL 0151URBE0 AREAS. • ALL IANHISCAPE ISLANDS NTH PLANT MATERIAL SHALL BE IRRIGATED. • REFER 10 LANDSCAPE 1101A1. SEE1 FUR GENERAL PLASTIC NOTES. IRRIGATION NOTES. PLASMIC DET40.5. • REFER 1G GRADING RAN FOR !RAGES AHD EROSION CONTROL • LANDSCAPE CONTRACTOR SHALL SUOMI' A ATOP DRAWING OF IRRIGATION PLAN TO THE LANDSCAPE ARCHITECT FOR REVIEW. ALL SHRUB BEDS AND TO REEVE 5' SHREDDED HARWOOD MULCH, NM 111FE5 10 00040E 4. OEP1H OF SHREDDED 11A OW00D MUCLN. • REMOVE WHIG, TINE CR ROPES AND BURLAP FROM THE TOP MO SIDES OF 1NE ROOT BALL FOR BARIED AND OUTS APPED PL.AN75. • REMOVE CONTAINERS AN0 GUT CIRCLING ROOTS IF P40.105 ARE CONTAINER • HEAVY COMMERCIAL GRADE EDGING SHALL BE USED M0UN0 THE PERIMETER OF ALL SHRUB AND ORGRDCOM.A MA59NG5 • AU. TREES NOT IN PLAN1040 BEDS TO RECEIVE 440LC4 RINGS S I DIA. • IF PLANTS ARE TO BE PRUNED. BRANCHES SHALL BE BRINED AT THE BRANON BARK RIDGE NOT FLUSH INN THE mum. • MULCH DEP1N SHALL BE A MANMUM OF FGU INCHES, ANO SHALL BE KEPT AT LEAST TW0 INCHES ARAM FROM THE STEM OF 111E TREES. • THE LANDSCAPE CONTRACTOE 51/411 REPAIR ALL DAMAGE TO ME STE CAUSED BY DIE PLANTING OPERATION AT NO COST TO THE DATER. • ALL RANDOM SHALL OECEIYE FERTBI&TT AS FOLLOWS •0 -0-20 GRANULAR FERDUZER APPLIED AT THE DARE 07 PLANTING AT A RATE OF 12 OZ PER 2.5 LAUFER ACHES OF THEE AND W 02 PER SHRUB. •10 -0-10 FERTILIZER APPLIED 7NE MIMES ESSIG AT SAE RATE MI PLANT LEGEND OVERSTORY OECIDUDOUS TREE ORNAMENTAL TREES CONIFER TREES SHRUBS \GROUNDCOVER AVG. ZS OA •P1 AVG. 5.5" DNA. WC. HT IT AVG. HT IB' Lam. S0YE FEET WARNING THE CONTRACTOR SHAT CONTACT ALL PUBLIC DALLIES FOR LOCATIONS OF ALL LNOERGR0IND INE5. CABLES. CONDUITS. PIPES. M00DLE5. VALVES, OR OTTER BURIED STRICTURES BEFORE DIGGING. HE SHALL REPAST OR REPLACE THE ABOVE THEN WAGED DURING CONSTRUCTION AT NO COST TO OWNER. Sends. 1 0205.01* 5-s-4 1-10.14 SAWN taint BFe Int 2 p0.* 01 P. SAT 1 bed11Wel Deter Flu we repeal s es or ado lay Mel *op.lbe awl and (.n • Mond d aal1r,• 4ebl1,1.ebr the xR d Be RAs el IOVVmx. ..d ASawn. Ode 5/RAN W NO. nom A.•. 50 95 Schnell & Madson, Inc. N• • Surveying • B,11 memo • Environmental 0.54v4* a . .• WSIO Wm... SObmd Bb 1 I41HdB,.NN6. OW DO LO.rpeylevenl. 530666 g en* 80011ni orne ESE Abr.- ke(5521546.65 phone 055*040. -0d -SWIMS M-9955 OW Hokanson Development, Inc. 0,74 aamm MN..l WE Mann. MALL 56404 me61 700-9130 Pa°d Moorhen T.r.W.e... 2nd Addlbn Lae Lake.. 07...05. B.d TIe LANDSCAPE PLAN De* 8/06/04 80, 11 SRI Project Number. 1."1.5144 -0,4 Rost. a.er V212/4, S wr Yeab' 4CHW OM O\JME ESIGN g-YiQ , Finny e!?*_zh