HomeMy WebLinkAbout2004-127 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 04 -127 RESOLUTION ACCEPTING BIDS AND AWARDING A CONSTRUCTION CONTRACT — 2004 SURFACE WATER MANAGEMENT PROJECT. WHEREAS, pursuant to an advertisement for bids for the construction of the 2004 Surface Water Management Project, bids were received, opened and tabulated according to law, and the following bids were received complying with the advertisement: Contractor Amount of Bid Jay Bros., Inc. $112,725.00 Penn Contracting, Inc. $158,804.50 Engineer's Estimate $159,490.00 AND WHEREAS, it appears that Jay Bros., Inc. is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The Mayor and Clerk are hereby authorized and directed to enter into a contract with Jay Bros., Inc., in the name of the City of Lino Lakes for the construction of the 2004 Surface Water Management Project according to the plans and specifications approved by the City Council and on file in the office of the City Clerk. • 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted by the Lino Lakes City Council this 13th day of September 2004. Ann J. BI , City Clerk • • AGENDA ITEM 6F STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: September 13, 2004 TOPIC: Resolution No. 04 -127, Accepting Bids and Awarding Construction Contract, 2004 Surface Water Management Project VOTE REQUIRED: 3/5 Vote Required BACKGROUND: Sealed bids were received and publicly opened at 10:30 a.m. on September 2, 2004. The results of the bid opening are presented below. City Council action is required to award a construction contract to the lowest responsible bidder. Contractor Amount of Bid Jay Bros., Inc. $112,725.00 Penn Contracting, Inc. $158,804.50 Engineer's Estimate $159,490.00 The low bid is approximately 29% under the Engineer's Estimate for this project. A copy • of the complete bid tabulation is attached. The substantial completion date for this project is November 15, 2004, with a final completion date of June 1, 2005. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 04 -127, Accepting Bids and Awarding a Construction Contract to Jay Bros., Inc. for the 2004 Surface Water Management Project. 3. Not adopt Resolution No. 04 -127. RECOMMENDATION: Option No. 2 - Staff recommends adoption of Resolution Number 04 -127. • • TKDA ENGINEERS • ARCHITECTS • PLANNERS September 3, 2004 Honorable Mayor and City Council City of Lino Lakes, Minnesota Re: 2004 Surface Water Management City of Lino Lakes, Minnesota TKDA Commission No. 13133.000 Dear Mayor and City Council: 1500 Piper Jaffrey Plaza 444 Cedar Street Saint Paul, MN55101 -2140 (651) 292-4400 (651) 292-0083 Fax www.tkda.com Bids for the referenced project were received on September 2, 2004, with the following results. A complete Tabulation of Bids is enclosed for your information. Contractor Jay Bros., Inc. Penn Contracting, Inc. Engineer's Estimate Recommendation Base Bid $112,725.00 $158,804.50 $159,490.00 We recommend that you award the Contract to the lowest bidder, Jay Bros., Inc., for their base bid of $112,725.00. Please do not hesitate to call me with any questions or comments you may have. Sincerely, Scott A. Brink, P.E. Project Manager SAB :tlb Enclosure An Employee Owned Company Pron _ 8 0 _mative Action and Equal Opportunity 1 1 T ATION OF BIDS 2004 CITY OF SURFACE L WATER MANAGEMENT PROJECTS CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13133.001 BIDS OPENED: SEPTEMBER 2, 2004, AT 10:30 AM 'DENOTES ERROR 114 BIDDERS CALCULATION ENGINEER'S ESTIMATE ITEM UNIT TOTAL 140. DESCRIPTION QUANTITY UNIT PRICE AMOUNT JAY UNIT PRICE TKDA ENGINEERS- ARCHITECTS - PLANNERS BROS., INC. PENN CONTRACTING, INC. BIDDER TOTAL UNIT TOTAL UNIT TOTAL AMOUNT PRICE AMOUNT PRICE AMOUNT A 1 ANDALL STREET (PROJECT LOCATION 1) MOBILIZATION 1 LS $ 2,000.00 $ 2,000.00 $ 1,000.00 $ 1,000.00 $ 1,200.00 $ 1,200.00 $ 2 CLEAR AND GRUB TREES /BRUSH 1 LS $ 500.00 $ 500.00 $ 700.00 $ 700.00 $ 4,500.00 $ 4,500.00 $ 3 DITCH EXCAVATION 350 CY $ 30.00 $ 10,500.00, $ 1,500.00 $ 900.00 $ 16.00 $ 9.00 $ 105.00 $ 5,600.00, $ 800.00 $ 315.00 1. R M U $ 35.00 $ 9.70 $ 192.50 $ 12,250.00 $ 970.00 $ 577.50 $ $ 4 5 CLEAN STORM SEWER PIPE CLEAN CATCH BASIN 100 3 l EA $ 15.00 $ 300.00 $ 6 TRAFFIC CONTROL 1 LS $ 200.00 $ 200.00 $ 300.00 $ 300.00 $ 500.00 $ 1,500.00 $ 500.00 7 SEEDING AND RESTORATION 1 LS $ 600.00 $ 600.00 $ 600.1 I $ 600.00 $ 1,500.00 $ 8 EROSION CONTROL 1 LS $ 100.00 $ 100.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ $ - SUBTOTAL - (A) ANDALL STREET _ $ 16,300.00 i $ 9,815.00 $ 21,997.50 $ - B 4TH AVENUE DITCH (PROJECT LOCATION 2) I 1 1 MOBILIZATION 1 LS $ 800.00 $ 800.00 $ 1,000.00 $ 1,000.00 $ 1,200.00 $ 1,200.00 $ 2 CLEAR AND GRUB TREES /BRUSH 1 LS $ 250.00 $ 250.00 �1 I $ 500.00 � $ 17.80 $ 15;00 I $ 300.00 I $ 800.00 750.00 $ 500.00 $ 3,560.00 $ 450.00 $ 300.00 $ 800.00 $ 750.00, $ 2,000.00 $ 35.00 $ 17.30 $ 500.00 $ 500.00 $ 500.00 $ 2,000.00 $ 7,000.00 $ 519.00 $ 500.00 $ 500.00 $ 500.00 $ $ $ $ $ $ - 3 DITCH EXCAVATION 200 CY $ 30.00 $ 6,000.00 4 CLEAN EXISTING DRIVEWAY CULVERT 30 1 LF LS $ 15.00 $ 100.00 $ 450.00 $ 100.00 $ 200.00 5 TRAFFIC CONTROL 6 SEEDING AND RESTORATION 0 1 LS $ 200.00 7 EROSION CONTROL LS $ 50.00 $ 50.00 1$ ', $ 7,360.00 $ 12,219.00 $ - SUBTOTAL - (B) 4TH AVENUE $ 7,850.00 C I, ('-• 1 ' •' MOBILIZATION 1 LS $ 3,000.00 $ 3,000.00 Ills • 1,000.00 . 150 :00 �� 32.00 $ 1,000,00 $ 1,200.00 $ 1,200.00 CLEAR AND GRUB TREES/BRUSH 1 LS $ 300.00 $ 300.00 $ 150.00 $ 3,200.00 $ 4,000.00 $ 71.00 $ 4,000.00 $ 7,100.00 $ $ $ - 12" RCP STORM SEWER (CLASS 5) 100 LF $ 35.00 $ 3,500.00 12" RCP F.E.S. WITH TRASH GUARD 2 EA $ 800.00 $ 1,600.00 630.00 $ 1,260.00 5 M $ 1,300.00 $ 2,600.00 FURNISH AND INSTALL CATCH BASIN (TYPE 402 2 © 50 30 20 1 50 EA $ 1,000.00 $ 2,000.00 I 720.00. $ 1,440.00 $ 1,800. 00 $ 145.00 $ 3.00 $ 35.00 $ 3,600.00 $ 435.00 $ 240.00 $ $ $ $ RIP RAP (CLASS II) CY $ 100.00 $ 300.00 M1111 Ml.. M1i I; 120.00 !+ 5.00', 20.00; 30.00' 130.001 500.00 , 8.00; $ 360.00 REMOVE BITUMINOUS PAVEMENT SY CY TN TN LS SY $ 10.00 $ 20.00 $ 18.00 $ 100.00 $ 150.00 $ 5.00 $ 800.00 $ 1,000.00 $ 540.00 $ 2,000.00 $ 150.00 $ 250.00 $ 400.00 $ 1,000.00 $ 900.00 $ 2,600.00 $ 500.00 $ 400.00 • COMMON EXCAVATION (STREET AND PIPE CULVERT) AGGREGATE BASE, CLASS 5 (100% CRUSHED) 3" BITUMINOUS PAVEMENT (LVWE45030B) PATCHING TRAFFIC CONTROL $ 1,750.00 $ $ 70.00 $ 145.00 $ 2,100.00 $ 2,900.00 $ $ $ 500.00 $ 6.00 $ 500.00 $ 300.00 - $ $ $ 12 SODDING AND RESTORATION 13 EROSION CONTROL 1 LS $ 100.00 $ 100.00 ' 500.001 $ 500.00 $ 500.00 $ 500.00 - SUBTOTAL - (C) BALD EAGLE/WOODCHUCK $ 15,540.00 $ 13,710.00 $ 27,225.00 $ - D 1 2 3 SOUTHWEST AREA (PROJECT LOCATION 4) 1 I I 46 ® ® EA $ 4,000.00 $ 10.00 $ 4,000.00 $ 55,000.00 E CE 3,475.00 2.00 $ 3,475.00 $ 11,000.00 $ 1,000.00 $ 1.80 $ 1,000.00 $ 9,900.00 $ MOBILIZATION CLEAN STORM SEWER PIPE (12' - 27" DIA.) CLEAN /OPEN STORM SEWER OUTFALL $ $ 50.00 $ 2,300.00 ME 500.00 120.00 400.00 1,200.00 '• 10.00 $ 23,000.00 $ 13,320.00 $ 2,000.00 $ 1,200.00 $ 1,000.00 $ 570.00 $ 103.00 $ 600.00 $ 1,000.00 $ 19.00 $ 26,220.00 $ 11,433.00 $ 3,000.00 $ 1,000.00 $ 1,900.00 $ $ $ $ 4 CLEAN CATCH BASIN/MANHOLE STRUCTURE 111 EA $ 250.00 $ 27,750.00 5 REPAIR CATCH BASIN/MANHOLE STRUCTURE TRAFFIC 5 EA $ 400.00 $ 2,000.00 $ 500.00 6 CONTROL 1 LS $ 500.00 7 SELECT TOPSOIL BORROW (LV) ' I CY $ 15.00 $ 1,500.00 8 SEEDING AND RESTORATION AC $ 1,500.00 $ 150.00 [ 8,000.00 6.00 $ 800.00 $ 600.00 $ 6,000.00 $ 8.00 $ 600.00 $ 800.00 $ $ 9 SODDING AND RESTORATION 100 SY $ 5.00 $ 500.00 10 EROSION CONTROL 1 LS $ 600.00 $ 600.00 500.00 $ 500.00 $ 1,500.00 $ 1,500.00 $ SUBTOTAL - D) SOUTHWEST AREA $ 94,300.00 $ 56,895.00 $ 57,353.00 $ - Pagl 1 Page 2 1 TAAATION OF BIDS 2004 SURFACE WATER MANAGEMENT PROJECTS CITY CITY OF LINO LAKES, MINNESOTA TKDA PROJECT NO. 13133.001 BIDS OPENED: SEPTEMBER 2, 2004, AT 10:30 AM *DENOTES ERROR IN BIDDERS CALCULATION ENGINEER'S ESTIMATE ITEM UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT TKDA JAY UNIT PRICE ENGINEERS - ARCHITECTS - PUWNERS BROS., INC. PENN CONTRACTING, INC. BIDDER TOTAL UNIT TOTAL UNIT TOTAL AMOUNT PRICE AMOUNT PRICE AMOUNT E 1 4TH AVENUE CULVERT REPLACEMENT (PROJECT LOCATION MOBILIZATION 5) 1 LS $ 2,000.00 $ 10.00 $ 2,000.00 $ 500.00 $ 1,000.00 $ 5.00 $ 1,000.00 $ 250.00 $ 1,200.00 $ 4.00 $ 1,200.00 $ 200.00 $ - $ - 2 REMOVE BITUMINOUS PAVEMENT 50 SY 3 REMOVE EXISTING CULVERT 30 LF $ 15.00 $ 450.00 $ 8.00 $ 240.00 $ 10.00 $ 300.00 $ - 4 DITCH EXCAVATION 100 CY $ 30.00 $ 3,000.00 $ 15.00 $ 1,500.00 $ 30.00 $ 3,000.00 $ - 5 18" RCP STORM SEWER (CLASS 5) CULVERT 30 LF $ 38.00 $ 1,140.00 $ 2$.09 $ 840.00 $ 76.00 $ 2,280.00 $ - 6 18" RCP FES WITH TRASH GUARD 2 EA TN $ 1,000.00 $ 18.00 $ 2,000.00 $ 360.00 $ 800.00 $ 30.00 $ 1,600.00 $ 600.00 $ 1,400.00 $ 60.00 $ 2,800.00 $ 1,200.00 $ - $ - 7 AGGREGATE BASE, CLASS 5 (100% CRUSHED) 20 8 3" BITUMINOUS PAVEMENT (LVWE45030B) PATCHING 10 TN $ 100.00 $ 1,000.00 $ 135.00 $ 1,350.00 $ 145.00 $ 1,450.00 $ - 9 TRAFFIC CONTROL 1 LS $ 300.00 $ 300.00 $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ - 10 SEEDING AND RESTORATION 1 LS $ 100.00 $ 100.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ - 11 EROSION CONTROL 1 LS $ 100.00 $ 100.00 $ 500.00 $ 500.00 $ 350.00 $ 350.00 $ - SUBTOTAL - (E) 4TH AVENUE CULVERT REPLACEMENT $ 10,950.00 $ 8,680.00 $ 13,780.00 $ - i F 1 PELTIER LAKE DRIVE CULVERT REPLACEMENT (PROJECT MOBILIZATION LOCATION 1 6) LS $ 2,000.00 $ 2,000.00 I $ 1,000.00 $ 1,000.00 $ 1,200.00 $ 1,200.00 $ - 2 REMOVE BITUMINOUS PAVEMENT 50 SY $ 10.00 $ 500.00 $ 5.00 $ 250.00 $ 4.00 $ 200.00 $ 3 REMOVE EXISTING CULVERT 30 LF $ 15.00 $ 450.00 $ 8.00 $ 240.00 $ 10.00 $ 300.00 $ - 4 18" RCP STORM SEWER (CLASS 5) 30 LF $ 38.00 $ 1,140.00 $ 30.00 $ 900.00 $ 76.00 $ 2,280.00 $ - 5 18" RCP F.E.S. WITH TRASH GUARD 2 EA $ 1,000.00 $ 2,000.00 $ 800.00 $ 1,600.00 $ 1,400.00 $ 2,800.00 $ - 6 AGGREGATE BASE CLASS 5 (100% CRUSHED) 20 10 TON TON $ 18.00 $ 100.00 $ 360.00 $ 1,000.00 $ 30.00 $ 135.00 $ 600.00 $ 1,350.00 $ 60.00 $ 145.00 $ 1,200.00 $ 1,450.00 $ - $ 7 3" BITUMINOUS PAVEMENT (LVWE450308) 8 TRAFFIC CONTROL 1 LS $ 300.00 $ 300.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ - 9 SEEDING AND RESTORATION 1 LS $ 100.00 $ 100.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 10 EROSION CONTROL 1 LS $ 100.00 $ 100.00 $ 500,00 $ 500.00 $ 500.00 $ 500.00 $ - SUBTOTAL - (F) PELTIER LAKE DRIVE CULVERT REPLACEMENT $ 7,950.00 $ 7,440.00 $ 10,930.00 $ - G WENZEL FARMS DITCH CLEANING (PROJECT LOCATION LS $ 600.00 $ 500.00 $ 600.00 $ 500.00 +. 1,000,00 900,00 $ 1,000.00 $ 900.00 $ 1,200.00 $ 3,000.00 $ 1,200.00 $ 3,000.00 $ - $ 1 MOBILIZATION 1 2 CLEAR AND GRUB TREES /BRUSH 1 LS 3 DITCH EXCAVATION 100 CY $ 30.00 $ 3,000.00 19.00 $ 1,900.00 $ 30.00 $ 3,000.00 $ 4 TRAFFIC CONTROL 1 LS $ 100.00 $ 4.00 $ 100.00 $ 400.00 $ 200.00 ' 500;00 5.00, 1,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 500.00 $ 6.00 $ 500.00 $ 500.00 $ Boom $ 500.00 $ $ $ - 5 SEEDING AND RESTORATION 100 SY 6 EROSION CONTROL 1 LS $ 200.0 $ - $ - $ SUBTOTAL - (0) WENZEL FARMS DITCH CLEANING $ 4,800.00 $ 5,800.00 $ 8,800.00 $ - 11 1 CENTURY FARMS (RIP RAP) (PROJECT LOCATION 8) MOBILIZATION 1 L5 $ 500.00 $ - $ 500.00 i 1,000.00' 700.001 $ - $ 1,000.00 $ 700.00 $ 1,200.00 $ 3,000.00 $ - $ 1,200.00 $ 3,000.00 $ $ $ 2 CLEAR AND GRUB TREES /BRUSH 1 LS $ 300.00 $ 300.00 3 INSTALL RIP RAP (CLASS II) 5 CY $ 100.00 $ 500.00 145.00', $ 725.00 $ 300.00 $ 1,500.00 $ 4 SODDING AND RESTORATION 100 SY $ 5.00 $ 500.00 6.00', $ 600.00 $ 8.00 $ 800.00 $ - $ - $ - $ - $ SUBTOTAL - (H) CENTURY FARMS $ 1,800.00 $ 3,025.00 $ 6,500.00 $ - TOTAL 2004 SURFACE WATER MANAGEMENT PROJECTS $ 159,490.00 : ''. $ 112,725.00 • $ 158,804.50 $ - Page 2