Loading...
HomeMy WebLinkAbout2004-136 Council Resolution• CITY OF LINO LAKES RESOLUTION NO. 04-136 RESOLUTION APPROVING AN APPLICATION FOR A RESIDENTIAL PLANNED UNIT DEVELOPMENT STAGE PLAN/PRELIMINARY PLAT, ALLOCATION OF MUSA RESERVE, FOR THE PROPOSED PHEASANT HILLS PRESERVE 12TH ADDITION WHEREAS, the Lino Lakes City Council makes the following findings: Findings 1. Hokanson Development has submitted an application for a residential planned unit development (PUD) and a development stage plan/preliminary plat for the PUD. This would require the allocation of Metropolitan Urban Reserve Area (MUSA) acres by the City. 2. The site includes approximately 30.7 acres. • 3. The comprehensive plan guides the site for Low Density Sewered Residential development . • 4. The site was rezoned from R -X, Rural Executive to Residential Planned Unit Development by Ordinance No. 22 -04. 5. The Lino Lakes Growth Management Ordinance, Ordinance No. 01 -03 establishes a goal to limit new growth n the city to an average of 147 new housing units per year, with the ability to exceed this target by 20% at the City Council's discretion. This project can fit within the 20% if final platted in year 2005. 6. The Planning & Zoning Board held a public hearing on the application on January 9, 2002. NOW, THEREFORE, BE IT RESOLVED that the Lino Lakes City Council hereby approves the application for a planned unit development/development stage plan for Pheasant Hills Preserve 12th Addition. BE IT FURTHER RESOLVED that the City Council approves the allocation of 5.6 acres of MUSA reserve for Blocks 1 and 2 of Pheasant Hills Preserve 12th Addition. BE IT FURTHER RESOLVED that the following conditions of approval apply: • 1. Erosion control and tree protection measures must be installed before grading begins on the project, as required by City ordinance. 2. Individual custom grading of each lot will be examined to minimize impacts to the existing topography and minimize other impacts to the environment. 3. The construction of rainwater gardens in individual lots will be used if possible, increasing infiltration of stormwater runoff. 4. A delineated preservation area on the north side of the island will be clearly marked during clearing and construction on the site. Care will be exercised to not damage valuable trees or disturb designated buffer zones. This area will remain in a natural state. Covenants will be used so property owners cannot remove vegetation in this area. Monuments will be posted delineating this area. Drainage from the rear of the homes will travel through this area allowing infiltration and reducing runoff. The project approval will include a mechanism such as covenants or a conservation easement to protect this area. 5. Covenants shall be included in homeowners' association documents to prohibit the use of phosphorous on the lawns. 6. The posting of signs and other aspects of a protection plan, as recommended by MN DNR, will be required to help protect Blanding's Turtles . 7. The revised project and bridge design shall be submitted for review by the Rice Creek Watershed District. A permit must be obtained from the Watershed District prior to final plat approval by the City. 8. The City Engineer's comments in the memo of September 17, 2004 must be addressed to City Engineer's satisfaction. 9. The developer shall implement the pre - construction survey and monitoring program for noise and vibration prior to any grading or construction work commencing on the site. 10. A small, temporary noise wall must be constructed around any dewatering pump that will run after daytime working hours. 11. Homeowners shall not disturb wetlands beyond 100 feet from the back of their homes. This prohibition shall be included in the homeowner association documents. 12. The bridge, roads, water, and sanitary sewer utilties within the project shall be privately owned and maintained. There must be an inspection and maintenance program for the bridge and utilities. There shall be provisions in the development agreement and homeowners association documents to enable the City to step in and effect repairs to the bridge, road, and water and sanitary sewer facilities if the - 5 6 - Resolution 04 -136, page 2 • • association fails to maintain them, and assess the cost to the property owners without challenge by the property owners. This is not intended to give responsibility for maintenance to the City except in emergency situations. This requirement is intended to protect public health and safety. These provisions shall be executed before work begins on the bridge or utilities. 13. There shall be no burning of vegetation cleared during construction. Vegetation shall be chipped and the chips disposed of off site. 14. Park dedication shall be cash, calculated based on the park dedication fees in effect at the time of fmal plat. 15. Bridge rails shall be wood or a material of similar appearance, to be reviewed by City staff prior to commencing construction. 16. The project shall not be fmal platted until 2005 to comply with the growth management policy. 17. Homeowners association declaration/covenants must be submitted for City Attorney review as required by the City's fmal plat requirements. 18. Any elements of the project not specifically addressed by the approved plans shall be subject to appropriate requirements of the R -1X zoning district and of other applicable City ordinances and controls. 19. This approval is based on the following submittals: • Existing Conditions, September 3, 2004 • Site Layout Plan, September 3, 2004 • Grading and Drainage Plans C3.1 and C3.2, September 3, 2004 • Erosion Control Plan, September 3, 2004 • Tree Preservation Plan, September 3, 2004 • Utility Plan, September 3, 2004 • Preliminary Plat, September 3, 2004 • Typical Section & Quantitites for bridge, September 3, 2004 • General Plan & Elevation for bridge, September 3, 2004 Adopted by the Lino Lakes City Council this day of 2004. AT'T'EST: Ber son, Mayor - 57 - Resolution 04 -136, page 3 • AGENDA ITEM 6 B STAFF ORIGINATOR: Jeff Smyser C. C. MEETING DATE: September 27, 2004 TOPIC: i. Ordinance No. 22 -04 Rezone From R -X to Residential Planned Unit Development ii. Resolution 04 -136 Planned Unit Development Stage Plan/Preliminary Plat, and Allocation of MUSA Reserve iii. Resolution 04 -137 Variance to Allow infrastructure Construction Prior to Final Plat Pheasant Hills Preserve 12th Addition VOTES REQUIRED: • BACKGROUND • 3/5 for rezoning ordinance 3/5 for CUP/PUD/Plat/MUSA resolution 3/5 for variance Mr. Ed Vaughan has submitted an application to develop property that includes an island near Ruffed Grouse Road. This will require a rezoning from its existing Rural Executive zone (R -X). Under the City's current ordinance, this will require a rezoning to residential planned unit development (PUD) and the corresponding development stage plan/preliminary plat. The project also will require allocation of MUSA reserve acres. The project has been discussed since the original submittal in April 2001. A summary timeline is attached at the end of this report. A petition for the preparation of an Environmental Assessment Worksheet (EAW) prompted the City to require an EAW in 2002. This put the application review process on hold. The City completed the process for an EAW with its decision that no Environmental Impact Statement is necessary. Under the deadline law (MN Stat 15.99), the deadline period begins again after the completion of a process required by statute. The negative declaration occurred August 9th. The 60 -day review period began again then, and expires on October 8th. The last city council meeting before the deadline is September 27th. The subdivision ordinance requires that a final plat approval must be obtained before streets, water, and sanitary sewer infrastructure are constructed. Because of the City's growth management limitations, the project cannot be final platted until 2005. The MnDNR permit for constructing a bridge expires November 30, 2004. Therefore, a • Pheasant Hills Preserve 12th Addn. page 2 variance from the infrastructure timing requirement is needed in order for the project to proceed. ANALYSIS Land Use, Density, Zoning The table below identifies the existing land use and zoning as well as guided land uses for the area. Location Existing Land Use Guided Land Use Existing Zoning Site vacant Low Density Sewered Residential R -X, Rural Executive North regional park PSP Public /Semi -Public PSP Public Semi- Public South single family residential and wetland Low Density Sewered Residential and Rural R -1X Single Family Executive and R -X Rural Executive East regional park, wetland, Rural, PSP R -X, PSP West wetland and single family residential PSP and Low Density Sewered Residential R -X, PSP, R -1 The comprehensive plan guides the island and the end of the "peninsula ", where the proposed lots are shown, for Low Density Sewered Residential land use. The site is within the Stage 1 growth area, which means the City can consider serving the site with utilities prior to year 2010. The following is a summary of the of the proposal: units 8 units /acre total site gross density 0.26 units /acre total site net density 0.91 units /acre Block 1 & Block 2 only gross density 0.71 units /acre Block 1 & Block 2 only net density 1.42 units /acre These densities are derived from the following lot data. It should be noted that the private road is included in these lot areas. If the private road easement were subtracted, the density would be very slightly higher, though still well within the range required by the comprehensive plan. • L1 B1 Block 1 subtotal L1 B2 L2 B2 L3 B2 L4 B2 L5 B2 L6 B2 L7 B2 Block 2 subtotal Pheasant Hills Preserve 12th Addn. page 3 gross ac upland ac 3.96 0.90 3.96 0.90 1.02 0.95 0.87 0.60 1.05 0.60 0.70 0.49 0.85 0.55 1.24 0.75 1.60 0.78 7.33 4.72 subtotal Block 1 & Block 2 only 11.29 5.62 Outlot A 2.00 0.16 Outlot B 17.38 3.04 TOTAL 30.67 8.82 Growth Management: • MUSA: The City's growth management policy (Ordinance 01 -03) implements growth policies of the comprehensive plan. It establishes limits on the number of new units to be approved as well on the use of MUSA reserve. The site requires MUSA, so the MUSA reserve limit is relevant. The 36 -acre target has been reached for 2004, but the policy allows an additional 20% (7.2 acres). To date, 36 acres have been approved for 2004. The additional 5.6 acres for this project will bring the total to 41.6, or 15% over the target. Units: The 147 units per year have been reached for 2004 and the allowable 20% also has been used (see attached table). As of the August 23 City Council meeting, 133 lots have been approved for 2005, so there are lots available for 2005 if the City Council is willing to use the discretionary 20 %. Variance: As part of the City's growth management regulations, the subdivision ordinance prohibits infrastructure construction until a final plat is approved. Section 1010 -6 states: The construction of streets, facilities for sanitary sewer and water, and other improvements beyond grading, wetland, and stormwater facilities shall not begin until approval of a final plat. The developer has a permit from the Minnesota Dept. of Natural Resources to build a bridge. This permit expires November 30, 2004. The DNR has informed the developer Pheasant Hills Preserve 12th Addn. page 4 • that the permit will not be extended, and the bridge must be finished by the expiration date. If the bridge is not built, there is no access to the island. • The subdivision ordinance addresses variances in Section 1002 -5: The City Council may approve variances from the requirements of this Subdivision Ordinance. All variance requests from these subdivision regulations shall comply with Section 2, Subd. 4 of the Lino Lakes Zoning Ordinance, as may be amended. The cited section is the normal variance section of the zoning ordinance. Therefore, variances from the subdivision ordinance are handled just like variances from the zoning ordinance. Normally, a variance must go to the Planning & Zoning Board for a recommendation. However, because we are facing a statutory 60 -day deadline, we don't have the time to bring it to the P & Z first. PUD Zoning: The site currently is zoned R -X, Rural Executive. A rezoning is needed if the project is to proceed. The project includes numerous unusual physical aspects. The standard zoning and subdivision requirements of the City's ordinances would not allow the project as proposed. The current zoning ordinance does not allow a conditional use permit for a PUD in a single family zone. Therefore, we can't just rezone to R -1X and use a CUP/PUD. The other alternative is to rczonc to PUD. The following elements are those that don't meet standard requirements. • The project is located within a shoreland management overlay district that includes land within 1000 feet of the ordinary high water level (OHWL) of Wards Lake. Wards Lake has an ordinary high water level (OHWL) of 883.7. Technically everything at or below this elevation is within Wards Lake. This lake is classified as a Natural Environment Lake, and therefore there is a minimum setback from the OHWL of 150 feet. The proposed project does not meet the requirements for setbacks because the island is less than 300 feet wide: There is no spot on the island that is 150 feet from all edges of the island. • Section 1102.09, Subd. 3.B. of the shoreland ordinance states: "Roads, driveways, and parking areas must meet structure setbacks and must not be placed within shore impact zones when other reasonable and feasible placement alternatives exist. If no alternatives exist, they may be placed within these areas, and must be designed to minimize adverse impacts." (The shore impact zone is one -half the setback, or 75 feet.) The proposed private road is within the shore impact zone. In order to place the road elsewhere, the house pads would need to be moved closer to the other side of the island, reducing the setback even further. • Pheasant Hills Preserve 12th Addn. page 5 • The maximum cul de sac length is 500 feet, as stated in Chapter 302.03, Subd. 1.(8). The existing cul de sac, Wild Turkey Trail and Ruffed Grouse Rd., is over 1000 feet. The proposed project would extend this nonconforming situation. Because of these inconsistencies with standard ordinance requirements, the proposal includes the use of a planned unit development (PUD). A PUD is not intended simply to be a way to avoid development ordinance standards. A PUD offers the opportunity to deviate from strict application of ordinance requirements to achieve goals —such as more efficient use of land and preservation of desirable site characteristics—that would not be possible when adhering to normal ordinance requirements. Several elements, such as a preservation area buffer along one side of the island and the swales, would promote environmental goals. An important question for the proposed project is whether the proposed design meets enough of such goals to justify the many deviations from normal requirements. The specific requirements relative to the proposed project are discussed below. PRELIMINARY PLAT/PLANNED UNIT DEVELOPMENT Section 2, Subd. 10.A. of the zoning ordinance discusses the purpose of a planned unit • • I ... -. • D • .... - • • 11 • - 1 d 11 • 1 application should be compared to these purposes in order to justify any flexibility requested by the applicant. Purpose and Intent. The purpose of this section of the Zoning Ordinance is to provide for the grouping of lots or buildings for development as an integrated, coordinated unit as opposed to traditional parcel by parcel, piecemeal, or sporadic approach to development. This section is intended to introduce flexibility of site design and architecture for the conservation of land and open space through clustering of lots, buildings and activities, which promote the goals outlined in the Comprehensive Plan or serve another public purpose. It is further intended that planned unit developments are to be characterized by central management, integrated planning and architecture, joint and common use and maintenance of parking, open space and other similar facilities, and harmonious selection and efficient distribution of uses. The PUD, by allowing deviation from the strict provisions of this Ordinance related to setbacks, heights, lot area, width and depths, yards, etc., by conditional use permit or a mixture of uses by rezoning to a PUD District, is intended to encourage: 1. A development pattern in harmony with the objectives of the Comprehensive Plan. e • • Pheasant Hills Preserve 12th Addn. page 6 2. Innovations in development that address growing demands for all styles of economic expansion, greater variety in type, design, architectural standards, and siting of structures through the conservation and more efficient use of land in such developments. 3. The preservation and enhancement of desirable site characteristics such as existing vegetation, natural topography and geologic features and the prevention of soil erosion. 4. A creative use of land and related physical development which allows a phased and orderly transition of varying land uses in close proximity to each other. 5. An efficient use of land resulting in smaller networks of utilities and streets thereby lowering development costs and public investments. 6. Promotion of a desirable and creative environment that might be prevented through the strict application of City zoning and subdivision regulations. Urban PUD Purposes: a. Preservation of wildlife habitat and unique natural resources. b. Reduction of negative impacts on the environment. c. Creation of common open space that provides a unified landscape for the use and enjoyment of the neighborhood community and/or the general public. d. A variety of urban residential lot sizes, configurations, and neighborhoods. While a PUD allows for flexibility from standard zoning requirements, it can be useful to compare certain design elements to the standard requirements. The following table summarizes selected project design elements and compares them to related requirements. proposed lot size R -1X: 12,825 sf 21,697 (smallest lot) setbacks local street 30 ft or 25 ft from internal streets in PUD 30 ft impervious R -1X: max 65% shoreland: 35% < 30% open space 50% for PUD Outlots: 63% • • • Pheasant Hills Preserve 12th Addn. page 7 Lots: The proposal includes eight lots. One lot would be on the "peninsula" at the end of the existing Ruffed Grouse Road. Seven lots would be on an island. It is difficult to say exactly what is included in the "upland" data submitted for each lot. The wetland is one edge, but the ordinary high water level, which establishes the lake edge, is a different line. However, they are in close proximity to one another. According to the submitted data, the smallest lot, Lot 4 on the island, is 21,697 sf of upland. This upland figure includes the private easement for the road , which would cover about 3,000 sf on that lot. Even subtracting this private easement, and some area that is below the OHWL but above the wetland edge, the lots will be large. Streets, Access: Access to site is via Ruffed Grouse Road and Wild Turkey Trail to Birch St. The addition of eight single family homes will pose no problems for these roadways. The proposal includes a short extension of Ruffed Grouse Road and a bridge to the island. A road would then run along the south side of the island to provide access to lots there. It is not advisable for the City to take on the expense of maintenance and repair for the bridge. In addition, it is City policy that landscaped islands are not allowed in cul de sacs, as is proposed on the extension of Ruffed Grouse Rd. Therefore, the road extension, bridge, and the island road will be private facilities. They will be owned and maintained by a homeowner association made up of property owners in the development. A private easement will be established across all the lots to contain the road and bridge. How to allocate costs between island owners and Lot 1 Block 1 would be a matter to be worked out by the developer in the association documents. The road design will need to be revised as recommended by the City Engineer to ensure emergency vehicle access. This refers to radii on curves and other details. The submitted bridge design corresponds with the latest information submitted as part of the EAW review. The City will require provisions in the development agreement to enable the City to step in and effect repairs, should the association fail to maintain the bridge and roads, and assess the cost to the property owners. The City also would require an inspection and maintenance program. Residents have raised the question of possible damage to the roads by construction vehicles. It is standard practice for the City Engineer to examine roads before and after construction and charge any damage to the developer. Stormwater Management: There will be a small collection area in Lot 1, Block 1, within a small landscaped area in the road. There will be two ponds on the island, one at each end. In addition, stormwater will be collected in several areas prior to running into the ponds. This will allow more infiltration and filtering of stormwater. Pheasant Hills Preserve 12th Addn. page 8 The lots will be custom graded, which means that the grading will be determined as part of the individual building permit. This allows close attention to the trees, slopes, and other features of the lots. The normal mass grading typically devotes less attention to these details in order to be more cost effective for the developer. Utilities: The project will be served with water and sanitary sewer via existing facilities in Ruffed Grouse Rd. A sanitary sewer lift station is proposed on the island, at the east end of the bridge. These utility extensions, like the roads and bridge, will be private utilities, owned and maintained by the homeowner association. How to allocate costs between island owners and Lot 1 Block 1 would be a matter to be worked out by the developer in the association documents. The City will require provisions in the development agreement to enable the City to step in and effect repairs, should the association fail to maintain the utility facilities, and assess the cost to the property owners. The City also would require an inspection and maintenance program. Park Dedication: Park dedication would be calculated based on the number of lots. Because the dedication fee may change prior to final plat approval, this report does not include a calculation of the total dedication. Additional EAW Issues: The EAW process identified the following issues to be addressed as part of the plat review and approval: 1. The City will require a specific and extensive tree preservation plan for the plat and individual plans for custom graded lots. These are required in the City's newly adopted subdivision and zoning ordinances. An overall plan was submitted, individual lots will be addressed with the building permits. This is a standard requirement, but is included as a condition of approval. 2. Erosion control and tree protection measures must be installed before grading begins on the project. The City has begun strict enforcement of these requirement. This will be addressed as part of standard project inspection by the City Engineer. This is a standard requirement, but is included as a condition of approval. 3. Individual custom grading of each lot will be examined to minimize impacts to the existing topography and minimize other impacts to the environment. Plans must clarify where mass grading is proposed, if any, and where custom grading is proposed. An overall plan was submitted, individual lots will be addressed with the building permits. This is a standard requirement, but is included as a condition of approval. 4. The construction of rainwater gardens in individual lots will be used if possible, increasing infiltration of stormwater runoff. • • Pheasant Hills Preserve 12th Addn. page 9 5. A delineated preservation area on the north side of the island will be clearly marked during clearing and construction on the site. Care will be exercised to not damage valuable trees or disturb designated buffer zones. This area will remain in a natural state. Covenants will be used so property owners cannot remove vegetation in this area. Monuments will be posted delineating this area. Drainage from the rear of the homes will travel through this area allowing infiltration and reducing runoff. The project approval will include a mechanism such as covenants or a conservation easement to protect this area. A covenant will be required as part of the homeowner association documents as a condition of approval. 6. Using roof leaders to direct runoff away from impervious surfaces will reduce the volume of runoff from the site. This will be considered with house and lot design. 7. Covenants will be included in homeowners' association bylaws to prohibit the use of phosphorous on the lawns. A covenant will be required as part of the homeowner association documents. 8. The posting of signs and other aspects of a protection plan, as recommended by MN DNR, will be required to help protect Blanding's Turtles . This is a condition of approval. 9. A flat bridge design will minimize the visual impacts compared to a truss bridge. The clearance under the bridge will be approximately 12 feet above ordinary high water level, and approximately six feet during 100 -year flood conditions, which allows for canoe access. The new design includes these features. 10. Any fill activity in the lake (below the ordinary high water level) or dewatering must conform to DNR standards. This will be addressed with project inspection. 11. If any wetland fill does become necessary due to the revised bridge design, the developer must obtain necessary approvals from the Rice Creek Watershed District prior to City Council approval of the preliminary plat. The bridge design must be reviewed by the RCWD. 12. The City will require utility and roadway specifications that demonstrate compliance with current City standards. These will be of greater detail than have been submitted to date. The City Engineer has reviewed the submittal. 13. The City will require a pre - construction survey and monitoring program for noise and vibration (as noted above). A plan has been submitted and must be executed as part of construction. • • • Pheasant Hills Preserve 12th Addn. page 10 14. Damage to existing streets will be considered in the establishment of financial securities for a development agreement for the project. It is standard procedure to observe roads before and after construction to determine any damage. Any damage will be charged to the developer. 15. A small, temporary noise wall must be constructed around any dewatering pump that will run after daytime working hours. This is a condition of approval. 16. A condition regarding no disturbing wetlands beyond 100 feet from the back of their homes will be included in the project requirements and recorded against all properties as a platting requirement. This is a condition of approval. 17. The City will require provisions in the development agreement to enable the City to step in and effect repairs, should the association fail to maintain the infrastructure, and assess the cost to the property owners. The City also would require an inspection and maintenance program. This will be included in the development agreement and/or homeowner association documents, as determined by the City Attorney. 18. The City would impose a prohibition on the burning of vegetation cleared during construction and require that vegetation be chipped and the chips disposed of off site. This is a condition of approval. ENVIRONMENTAL BOARD The Environmental Board reviewed the proposal in December 2001. The Board recommended denial of the application . PLANNING & ZONING BOARD The P & Z Board reviewed the proposal in January 2001. The Board recommended denial of the application because of the numerous departures from zoning and subdivision requirements and, in the Board's opinion, the failure to meet the purposes of a planned development. Pheasant Hills Preserve 12th Addn. page 11 OPTIONS 1. Approve the application by approving the following: i. First Reading of Ordinance No. 22 -04, approving rezoning to Residential PUD. ii. Resolution 04 -136, approving PUD Development Stage Plan/Preliminary Plat and MUSA Reserve Allocation. iii: Resolution 04 =137, approving variance from requirement that a -coal plat must be approved before infrastructure can be constructed. 2. Deny the application by denying the ordinance and two resolutions. RECOMMENDATION Option 1 • • • Pheasant Hills Preserve 12th Addn. page 12 Summary History of the Pheasant Hills Preserve 12th Addition Project: April 2001 September 2001 December 2001 January 2002 February 2002 March 2002 August 2002 August 2003 October 2003 April 2004 May 10, 2004 June 1, 2004 July 9, 2004 July 15, 2004 August 9, 2004 Project submittal for comprehensive plan amendment, rezone to planned development, and preliminary plat. Submittal incomplete. New submittal, incomplete. Additional information received over following weeks. Environmental Board voted to recommend denial of project as submitted. P & Z voted to recommend denial of the project as submitted. City received petition requesting preparation of EAW. City Council required preparation of an EAW. Comprehensive plan adopted, which includes site in Low Density Sewered Residential area, eliminating the need for the comprehensive plan amendment. EAW completed and distributed for public comment: notice in EQB Monitor Sept. 1, comment period ends October 1. Comments raised questions, City notifies applicant that more info needed on specific items. Information received over next months. City Council work session, Council instructs applicant to provide more information with specific info needed by staff (bridge, noise). Bridge images submitted. Bridge piling /abutment sketches submitted. Draft Record of Decision distributed to Env. Bd., applicant, neighborhood (petitioner) representative Environmental Board recommends negative declaration. City Council holds a public hearing. Council makes a negative declaration: an Environmental Impact Statement is not warranted. September 3, 2004 New plans submitted. • • • Pheasant Hills Preserve 12th Addn. page 13 KtJIUtN 1 IAL MUSA ALLOCATION 2003 2004 2005 2006 2007 2008 2009 TOTAL annual target 36.0 36.0 36.0 36.0 36.0 36.0 36.0 252.0 27.7 55.0 20.9 3.7 1.4 0.7 Stoneybrook 27.7 Century Farms North 15.3 11.4 13.5 5.4 9.4 Ravens Hollow 20.9 Justin's Preserve 3.7 Junes Addition 1.4 proposed West Shadow Ponds 2nd 0.7 Pheasant Hills 12th Addn 5.6 Speiser /Sawyer 1.5 5.0 total 43.0 43.1 20.6 5.4 9.4 0.0 0.0 121.5 remaining of annual 36 -7.0 -7.1 15.4 30.6 26.6 36.0 36.0 130.5 exceeds target by 19% 20% • as of September 14, 2004 LOTS /UNITS • , Pheasant Hills Preserve 121' •n. Development Name approved prelim. plats Prelim Plat Phasing plans by year (lots /units to be final platted) year end 2002 2003 2004 2005 2006 2007 2008 2009 2003 -09 total max. 1029 Stoneybrook • 103 51 0 2nd Addn 0 52 52 Century Farms North 249 56 65 52 43 33 249 Keefe: prel plat, not final plat 1 1 1 Morton (minor subdiv) 0 1 1 Ravens Hollow 56 0 56 56 Haley Manor (10 new lots) 10 10 10 Crystal Cove 3 3 3 Millers Crossroads 152 22 47 51 32 152 Lakeview Estates (2 new) 2 2 2 Snell (minor subdivision) 0 1 1 Pheasant Hills Pres. 13th 1 1 1 Justin's Preserve 1 1 1 Marshan Estates 4 4 4 Rice Creek Church duplex 2 2 2 Rice Church: Oakwood View 10 10 10 Junes Addn 2 2 2 Highland Meadows East 2nd 18 18 18 Marshan Townhomes 2nd 23 23 proposed Pheasant Hills 12th island 8 8 8 West Shadow Ponds 2nd Add 1 1 1 Fox Den Acres (resubmittal) 56 11 45 56 total 51 148 176 176 120 33 0 0 653 remaining of annual 147 remaining of 1029 for pre -2010 exceeds target of 147 by percent -1 -29 -29 27 114 147 147 1 29 29 0.7% 19.7% 19.7% 376 page 14