Loading...
HomeMy WebLinkAbout2004-137 Council Resolution• • CITY OF LINO LAKES • • RESOLUTION NO. 04-137 RESOLUTION APPROVING A VARIANCE FROM THE SUBDIVISION ORDINANCE PROHIBITION ON CONSTRUCTING INFRASTRUCTURE PRIOR TO APPROVAL OF A FINAL PLAT, PHEASANT HILLS PRESERVE 12TH ADDITION WHEREAS, the Lino Lakes City Council makes the following findings: 1. Section 1010 -6 of the Lino Lakes subdivision ordinance states: The construction of streets, facilities for sanitary sewer and water, and other improvements beyond grading, wetland, and stormwater facilities shall not begin until approval of a final plat. 2. Mr. Ed Vaughan, the developer of the proposed Pheasant Hills Preserve 12th Addition, has a permit from the Minnesota Dept. of Natural Resources to build a bridge to an island. This permit expires November 30, 2004. The DNR has informed the developer that the permit will not be extended, and the bridge must be finished by the expiration date. 3. The site is within the property described in attachment A. 4. The subdivision ordinance addresses variances in Section 1002 -5: The City Council may approve variances from the requirements of this Subdivision Ordinance. All variance requests from these subdivision regulations shall comply with Section 2, Subd. 4 of the Lino Lakes Zoning Ordinance, as may be amended. 5. Section 2, Subd. 4 of the Lino Lakes Zoning Ordinance lists criteria for variances, stating that in considering all requests for variance or appeal and in taking subsequent action, the City shall make specific findings of fact. 6. The property in question cannot be put to a reasonable use if used under conditions allowed by the official controls. • The subdivision ordinance states that construction of streets, facilities for sanitary sewer and water, and other improvements beyond grading, wetland, and stormwater facilities shall not begin until approval of a fmal plat. If the bridge is not built, there is no access to the island. Without access to the island, the use of the land is questionable. • 7. The plight of the landowner is due to physical circumstances unique to his property not created by the land owner. • The site is a natural island. 8. The hardship is not due to economic considerations alone if reasonable use for the property exists under the terms of the ordinance. Economic do not create._ the need_ for a - variance... - -- -The- issue -is -a permit from the Minnesota Dept. of Natural Resources, which is not controlled by the City. 9. Granting the variance requested will not confer on the applicant any special privilege that would be denied by this ordinance to other lands, structures, or buildings in the same district. • There is no known situation that would involve a permit from a state agency with a deadline to build a bridge to an island. That the proposed actions will be in keeping with the spirit and intent of the ordinance. • • The project itself, once approved by the City Council, is deemed in keeping with the spirit and intent of the ordinance. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Lino Lakes hereby approves a variance to allow the construction of the bridge permitted by Minnesota Department of Natural Resources permit number 2001 -6109 prior to the approval of the final plat for Pheasant Hills Preserve 12th Addition. Adopted by the Lino Lakes City Council this day of 2004. ATTEST: • hi;"o , J. Ber eson a Jo y or - 59 - Resolution 04 -137, page 2 • • ATTACHMENT A: LINO LAKES RESOLUTION 04 -137 Description of PHEASANT HILLS PRESERVE 12TH ADDITION Outlot D, PHEASANT HILLS PRESERVE, Anoka County, Minnesota, EXCEPT that part of Outlot D, PHEASANT HILLS PRESERVE being in the West one half of the Northwest one- quarter, Section 27, Township 31,. Range 22 Anoka County, Minnesota described as follows: Commencing. at the Southeast corner of the West one -half of said Northwest one - quarter, Section 27; thence North 01 degrees 00 minutes 55 seconds West along the East line of said West one -half, Northwest one quarter, Section 27 a distance of 57.73 feet to the Southeast corner of said Outlot D for a point of beginning of the tract to be described; thence North 01 degrees 00 minutes 55 seconds West, along the East. line of said Outlot D a distance of 910.02 feet; thence South 89 degrees 22 Minutes'49 seconds West, a distance of 580.47 feet; thence South 01 degrees 00 minutes 55 seconds East, parallel with the East line of said Outlot -D_, a distance of 548.90 feet; thence North 89 degrees 22 minutes 49' seconds East, parallel with the South line of said Northwest one quarter, Section 27; a distance of 416.00 feet s- . - . . I . - -0 a minutes 55 seconds East, parallel with the East line of said Outlot D a distance of 370.14 feet to -the Northerly right -of -way line of C.S.A.H. No. 10 (Anoka County Right -of -Way Plat No. 11); thence North 85 degrees 24' minutes 36 seconds East along said right -of -way line a distance of 28.66 feet; thence continuing along said right -of -way line along a, curve concave to the- North (which has a radius of 3879.72 feet, a delta angle of 02 degrees 00 minutes 31 seconds, and an arc length of 136.02 feet) a chord bearing and distance of North 86 degrees 24 minutes 53 seconds East, 136.01 feet to the point of beginning. And EXCEPT the North 1100 feet of Outlot D, PHEASANT HILLS PRESERVE, Anoka County, Minnesota. And EXCEPT the South 400 feet of the North 1500 feet of the East 600 feet of Outlot D, PHEASANT HILLS PRESERVE, Anoka County, Minnesota. - 60 - Resolution 04 -137, page 3 TKDA ENGINEERS • ARCHITECTS • PLANNERS MEMORANDUM To: 1500 Piper Jaffrey Plaza 444 Cedar Street Saint Paul, MN 55101 -2140 (651) 292 -4400 (651) 292 -0083 Fax www.tkda.com James Studenski, City Engineer Reference: Pheasant Hills Preserve 12th Addition Copies To: City of Lino Lakes, Minnesota From: Scott A. Brink, P.E. Date: September 17, 2004 The following documents have been received: Comm. No. 12976 -002 Routing: 1. Construction plan set (half -size and full size) titled "Pheasant Hills Preserve 12th Addition" prepared by Loucks Associates, and received by the City of Lino Lakes on September 3, 2004. _Included within the plan set are the following sheets: CO -1, C1 -1, C2 -1, C3 -1, C3 -2, C3 -3 C3 -4, C4 -1, C6 -1, C8 -1, C9 -1, Bridge Typical Section and Quantities, and Bridge General Plan and Elevation. • 2. Letter from the City of Lino Lakes to Ed Vaughan addressing Environmental Assessment Worksheet (EAW) items. 3. Responses to comments in Record of Decision pertaining to plat approval (responses provided by Loucks Associates and received by the City of Lino Lakes September 3, 2004). 4. Letter from STS Consultants, Ltd. To Ed Vaughan dated September 3, 2004 addressing Noise, Vibration and Pre - construction Building Survey in Conjunction with the Road and Bridge Construction. 5. Letter from the Minnesota Department of Natural Resources to Ed Vaughan dated August 31, 2004 regarding DNR Permit No. 2001 -6109. An Environmental Assessment Worksheet (EAW) was previously prepared for this proposed development, and comments provided. This review essentially acknowledges some of the remaining environmental review issues while providing a more detailed technical review of the proposed infrastructure improvements (utilities, roadway, grading, etc.). General Comments The following general comments are provided: 1. The proposed project area essentially extends from the end of an existing cu -de -sac (Ruffed Grouse Road), which is approximately 1500 feet in length when measured from County Road 10. With an An Employee Owned Company P; _ 6 1 _ ffirmative Action and Equal Opportunity • • Pheasant Hills Preserve 12th Addition City of Lino Lakes, Minnesota Page 2 September 17, 2004 additional 1200 feet in length for the proposed improvements, this results in a dead end street roughly 0.5 miles long which significantly exceeds the City's minimum cul -de -sac length of 500 feet. This may be a concern for emergency vehicle and fire access and maintenance, especially when considering that the proposed bridge and new street will not meet City standards for width. Public Safety (Police and Fire) are therefore reviewing the plan as well. In addition, the development will be served from a long dead end (6 -inch diameter) watermain. As a result, adequacy for fire protection (water circulation and pressure) is also being verified. A main environmental concern is the noise and vibration from the pile driving (bridge construction) activity. In addition to work activity allowed only during established hours by the City, temporary noise walls around pumps will be required by the City. As stated in the August 17, 2004 letter to Ed Vaughan from the City of Lino Lakes, the City will require a preconstruction survey and monitoring program based upon specifications used by MnDot. The letter addresses specifics in more detail. 3. The proposed bridge design must address the visual /aesthetic concerns expressed by the City, and shall be subject to the City's approval. The proposed structural bridge plan is also being reviewed further and will be subject to further comments. The bridge must all meet also meet any further applicable requirements of the Minnesota Department of Transportation and Anoka County. Any temporary fill or impacts to the wetland during the course of construction must also be addressed. 4. The Grading. Plan indicates that Soil Borings were conducted by STS on March 6, 2002, and a copy of the boring logs has been attained. However, no report or set of recommendations from a geotechnical engineer has been provided. The boring logs provided show a wide variation of silty sands, silty and sandy clays, and peat throughout the project area. It is therefore expected that at least some soil correction measures will be needed during the course of roadway and utility construction, and construction of the housing units themselves. A report and recommendations from a geotechnical engineer must therefore be provided to further verify the design of the supporting infrastructure, including roadway and utility construction, building foundations, and bridge construction. Groundwater levels and potential impacts on construction must also be known. Grading 1. Because of the environmental sensitivity of the project site, custom grading of each lot must be provided to minimize impacts to the existing topography. The Grading Plan notes should also specify that all grading and disturbance work shall be confined to within the construction limits as established on the plan and approved by the City in the field prior to activity. Erosion control and tree protection measures must also be established prior to any work activity, including the delineation of the preservation area on the north side of the island. The preservation area must be clearly shown on the grading plan, shall be marked in the field by the Developer, and shall be field verified and approved by the City prior to commencing any work activity. 2. Construction traffic and operations shall also be staged with the bridge construction to allow for access to the site and minimize impacts to the natural area. Because the site essentially sits at the end of a very long cul -de -sac, the neighborhood will experience regular intervals of construction traffic ' Phea. ant Hills Preserve 12th Addition Page 3 September 17, 2004 City of Lino Lakes, Minnesota • and activity. An existing condition assessment of Ruffed Grouse Road should be conducted, and the Developer be responsible for any damage or repairs to the street upon completion of construction. 3. The proposed Grading Plan must be approved by the Rice Creek Watershed District (RCWD). It is our understanding that RCWD reviewed a proposed plan in September of 2001, and the application was tabled with conditions. A re- submittal or application to RCWD shall be submitted as required by RCWD, and a copy of the permit and/or permit application must be provided to the City. 4. The Minnesota Department of Natural Resources (DNR) has reviewed the proposed plan and several requirements of the DNR must be met with regards to construction of the bridge, and working within the bounds of a public water. The Developer must successfully attain all permits and approvals required of the DNR that are needed to construct the improvements as proposed, including re- submittals for any applications that may have expired or been revised. 5. The plan intends to fill 2460 cu.yd. into the floodplain. Any flood plain filling must be approved by the City of Lino Lakes, Rice Creek Watershed District, and Minnesota Department of Natural Resources. 6 Overalls the plan appears to incorporate the balancing of the creation of water quality detention basins with preservation as much as possible. Previous review comments expressed a desire for the construction of iaiiiwaler gardens as possible to encourage infiltration for runoff. The Grading and Drainage Plan provides a note stating that rain gardens are to be constructed as needed. Lots 1 -5 are designated as custom graded with rainwater gardens, although no rain garden locations are actually shown. The plans would therefore seem to suggest that rain gardens may or may not be constructed. If it is desired to have rain gardens installed, it is recommended that they be shown on the grading plan, or that the City review and approve the grading of each individual lot prior to the issuing of a building permit. Utilities 1. The site proposes to utilize existing sanitary sewer and water that currently terminate at the end of Ruffed Grouse Road. This includes 8 -inch diameter sanitary sewer and 6 -inch diameter watermain. Prior to any construction, detailed utility construction plans (including plans and profiles) must be provided in accordance with City requirements. 2. All utility system materials and installation methods shall follow City of Lino Lakes engineering standards, and the requirements of the Standard Utilities Specifications of the City Engineers Association of Minnesota. Notes are provided on the plans to that effect. 3. All trenches (including services) shall be backfilled and compacted and meet 100% maximum Standard Proctor Density in the upper 3 -feet from finished road elevation, and 95% maximum Standard Proctor Density below the upper 3 -feet. • 4. Further details regarding the insulation of water and sewer must be provided. Pheasant Hills Preserve 12th Addition Page 4 September 17, 2004 City of Lino Lakes, Minnesota Watermain The following comments, specific to watermain are provided as follows: 1. Standard watermain details of the City of Lino Lakes shall be provided, including the following: Hydrants Waterous Pacer WB -67; Valves - Mueller A2370 -20 or equal; Corp Stop Mueller H- 15000;- Curb Stop and Curb Box - Mueller- H-15 -154 Marge -2 Oraseal and Mueller H -1300 w/lvlpis. Top. DIP pipe shall be Class 52. 2. The Developer shall provide to the City of Lino Lakes a copy of the completed Minnesota Department of Health (MDH) Permit for watermain installation. 3. All watermain shall be tested, disinfected approved per the requirements of the City of Engineers Association of Minnesota Standard Specifications and Minnesota Department of Health prior to acceptance by the City. 4. With regards to the number and location of hydrants and valves, the plans shall be subject to the review of the City Fire Cluef.- As_previoualy. mentioned, _th development -wi-11 be served from along dead end (6 -inch diameter) watermain (Ruffed Grouse Road), and the pressure adequacy at the end of the main is being ve ified. Sanitary Sewer 1. The Developer shall provide to the City of Lino Lakes a copy of the completed MPCA Sanitary Sewer Permit, including correspondence and approval of Metropolitan Council Environmental Services (MCES). 2. The Utility Plans shall include notes providing for erosion and sedimentation control. The Developer must provide a televised inspection of all sanitary sewer pipes upon completion of installation. Any required cleaning of sediment from the sewer pipes after construction shall be the responsibility of the Developer. 3. All sanitary sewers shall be tested and approved per the requirements of the City of Engineers Association of Minnesota Standard Specifications prior to acceptance by the City. 4. All sanitary sewer services shall be PVC Schedule 40 or SDR 26. 5. The proposed lift station requires some additional information for review, including the following: pump and motor specifications, gate valve specs, wet and dry well elevations and sizes, inlet and force main pipe elevations, etc. If the lift station is intended to be owned and/or maintained by the City of Lino Lakes, the station must meet all City requirements and shall be subject to the review and approval of the City Utilities Superintendent. Pheasant Hills Preserve 12th Addition Page 5 September 17, 2004 City of Lino Lakes, Minnesota Storm Sewer The Standard Catch Basin detail shown shall be replaced by City of Lino Lakes standard Type 406 or Type 409 as appropriate. Other 1. A Tree Preservation Plan has been submitted as required. The Plan shall be subject to further review and approval of the City. 2. Provisions and coordination work for the extension of private utilities to the site (gas, electric, communication, etc.) shall be the responsibility of the Developer. 3. It is suggested that the street entrance radius at the end of Ruffed Grouse Road be enlarged to provide for a smoother turning movement on to the new street (i.e., incoming traffic is routed around the center island area correctly) to mitigate potential vehicle conflicts. 4. Per the requirements of the City of Lino Lakes, basement floor elevations must be at least 4 -feet above the normal water elevation and 2 -feet above the design flood level. The lowest building opening must be a minimum of 1 -foot higher than the emergency overflow elevation. According to the plan, the ordinary high water line of the surrounding wetland is 883.7. The minimum basement floor elevations as shown on the plan (888.6 and greater) would therefore appear to be adequate based on comparison to the ordinary high water mark. However, the 100 -year elevation of the surrounding wetland (as shown on the plan) is 887.6. The minimum floor elevation would therefore be required to be at least 889.6 for all units. In addition, the high water elevations of Pond 1 and Pond 2 are 888.32 and 888.61 respectively. Therefore, proposed units adjacent to those ponds must be at least 2 feet above those respective elevations. In addition to the pond and wetland elevations, a geotechnical report must be provided in order to ascertain if there are any further concerns with regards to groundwater elevations. 5. The proposed street serving the property (including the bridge) does not meet standard City requirements for width and other design requirements such as curb and gutter. In addition, a geotechnical recommendation is not available to confirm if the existing subgrade material is adequate, or if it should be removed and replaced with a suitable granular base. It is therefore expected that the street will be designated as a private street, and this must be clearly established in an Agreement between the City and the Developer (including all subsequent and future property owners). In addition, all roadway and bridge maintenance including snow plowing would not be the responsibility of the City. Pheasant Hills Preserve 12th Addition City of Lino Lakes, Minnesota Page 6 September 17, 2004 6. In addition to erosion control requirements, all graded and disturbed areas must be seeded and established as soon as possible. The City of Lino Lakes has adopted a specific seed specification for environmentally sensitive areas. The Developer shall attain a copy of the seed specification from the City and shall seed and restore all graded areas in accordance with the requirements of the City of Lino Lakes. 7. The Grading Plan includes a note that addresses NPDES permitting requirements. The Developer shall be aware of recent revisions in the law that has introduced further requirements with regards to NPDES permitting, including the submittal of a Stormwater Pollution Prevention Plan (SWPPP) to the City of Lino Lakes. 8. A certified as -built survey must be provided by the Developer's Engineer upon completion of grading that certifies that all grading complies with the Grading Plan. This certification shall be required prior to the issuance of any building permits. 9. Standard platted drainage and utility easements are provided along all property lines and wetland and detention areas as required. Maintenance activities must be clearly defined in an agreement between the City and the Developer and the eventual Owners and/or Association. • • • September 3, 2004 Mr. Ed Vaughan 1432 Pheasant Hills Drive Lino Lakes, MN 55038 Re: Work plan for Noise, Vibration and Pre - construction building Survey in conjunction with theBridge and Road Construction at Pheasant Hills Preserve 12th Addition in Lino Lakes, Minnesota; STS Project 98623 -B Dear Mr. Vaughan: The site of the proposed Pheasant Hills Preserve 12th Addition is a ridge of higher and or "island" totally encircled by a wetland. In order to construct this project, it will be necessary to build a bridge across the wetland. Because of the depths of compressible organic soils at the bridge site, we have recommended that the bridge should be supported on driven piles. Your consulting engineer for this project, Loucks and Associates, Inc., has asked us to provide for the planned activities to monitor and control the potential noise and vibration impacts to the adjacent residential neighborhood to the west, associated with the pile driving during this construction. We will also comment on the planned pre - construction building survey of structural conditions of these houses. Pre - Construction Building Survey Prior to the actual construction of any of the earthwork or pile driving for the bridge construction, STS Consultants, Ltd. on behalf of the developer will conduct an on site observation of each of the residences within 200 feet of the proposed construction. We anticipate that eight houses will be observed. Permission to enter into the individual residences will be arranged with the home owner. The inspection of the home will be conducted by an experienced building condition inspector from STS in conjunction with a representative of the City of Lino Lakes and the home owner. Photographic, video and written records of the interior and exterior of the residence will be made, with any existing cracks or distress to the house detailed. If cracks are observed, crack monitoring gaugesdevices will be installed and photographed as initial conditions and monitored during the construction. A representative of STS will be available on site during the pile installation activities to receive communication from the residents and further assess potential complaints of distress. Noise For this project, the use of steel pipe piles have been recommended for support of the bridge. The pile driving hammer creates impulsive noise (series of repeated sounds) which would slightly exceed the noise standards for a Noise 1 classification area, namely 60 to 65 decibels. Thus the pile driving should be restricted to no earlier than 8 AM, and no later than 4 PM, with no pile driving on Saturdays and Sundays. STS will monitor ambient sound levels within the neighborhood prior to start of construction to determine a base level of background noise. During the pile driving operations, STS will monitor and record noise levels intermittently adjacent to the pile driving equipment, at a distance of fifty (50) feet from the equipment and at adjacent to the exterior of selected houses in the neighborhood, closest to the construction. The letter from the City dated August 17, 2004, sets a sound level limit criteria of 90 decibels when measured at 50 feet from the equipment. If this sound level is exceeded, modifications to the pile driving hammer, cushion block or fuel setting will be implemented to reduce the noise level. STS will coordinate with the piling contractor and developer to verify implementation of any such modification, and record retesting of the system. Vibration • • Company STS Project # Date Page 2 With respect to vibration effects from pile driving, we have reviewed actual seismograph data taken adjacent to pile driving operations. This material was provided to us courtesy of LH Bolduc Company and Carl Bolander and Sons Company. The seismograph tests indicate that the frequency of the vibrations is less than 2 cycles per second and the maximum particle velocity recorded, even as close as 15 to 20 feet from the pile driver, is generally Tess than 1 inch per second. On this basis, there should be no damage to the nearest house, which is 70 feet from one end of the bridge. It should be noted that the human body is quite sensitive, and thus occupants of the house might feel some small vibrations, or some crockery may rattle during the pile driving, but the effects on the structure should be none or negligible. STS will provide a continuously recording seismograph to the site during all pile driving operations. We will also establish pre - existing vibration levels in the neighborhood resulting from street traffic such as garbage or delivery trucks. During construction, vibration levels (amplitude and frequency will be recorded at the closest house to the pile driving operations and at any nearby home where a complaint is made. If vibration levels exceed 1 inch /sec particle velocity, modifications to the pile driving will be necessary. Records of vibration events will be submitted to the City upon completion of the piling operations, or as any issues or complaints arise. The pre- condition survey, and pre - construction noise and vibration studies can be initiated upon your request The results of these surveys can be forwarded to the City if you desire. If we can be of further service, please call us. Sincerely, STS CONSULTANTS, LTD. James H. Overtoom, P.E. Principal EngineerNice President JHO/ cc: Mr. Jeff Shopek — Loucks and Associates, Inc. C623B001.doc CENTERVILLE LAKE oP ®® ®II!® M�E�pMpE�IM :e d� ®I® ® ®I 94 5 d� P ®e c; "" I'�iar -off re Am) 1•I1�3��a i ", W "�T1' mt ®IlllaoIRlJv '" i ®�11� a�.� SHADED AREA DENOTES PARK LOCATION MAP -69- imm- OF • •i • w • ® • .s® • DETAIL OF PROPOSED LAND USE PLAN LINO LAKES COMPREHENSIVE PLAN Note: The island is intended to be Low Density Sewered Residential. A mapping glitch superimposed the Rural area over the island in the existing maps. The map below shows the project site as it should have been mapped. . ■1 i: ,,,,,k`t--!1',.. ,..C.....',E ... ■ t.,,,,,a *,,E1.. .1',.......Vit,,'_. ....I..3,...... 'L. '■•■ " , r.'"--' ' r • 1 i ', - 7 0 - Birch Street !ND 'EY 12 ...IE NB ...IN NE • 5 Line Of N. 1100 P1. Of Oullol 0, PHEASANT HILLS PRESERVE - NH9 °42'31 "E 1306.53 ORDINARY WGN WATER LINE (6617) E X C E'P EDGE OF WOODS @ CATTAILS AS SHOWN ON PLAT OF — PHEASANT HILLS PRESERVE 'O U N T Y C O N D E M N A T I O N Nis >? 569 °22'45 "W 72 t "E" €t S 2004 (. Ct r Y F5j_ Levi,..; -5. Line Of N. 1)00 IF 00 Oul/ol 0. PHE easant Hills Preserve 12th Addition Lino lakes, Minnesota I u.meroe.ehaverNe°w: WETLAND I Ise,wres. Edge 01 - -Edge 01 Weflond Lovcs ASSOCIATES Edge 0 ORDINARY WATEP. LINE (0617) h I saes .. 0, II laYer uwaletan a, Selma Aninfnotl Re EDGE OF TREES AT TALL GRASSES 000113 0 00 120 SCALE IN FEET EXISTING CONDITIONS WETLAND Frown No: 911331 C1 -1 S2 • S. Line 01 0. IMO Ft. 01 Outlet 0, PHEASANT HILLS PRESETWE—,.. Edge 01 de 111 ill. 110°1011 -III■■IZr ......•_ Sali -.11.111 -- Ilf\ 441i Md.) ! ,111. — ..1 Irv, mar' ^KI 1:i ,- , •,, , .... , • V \ \ • -' / '• --',-- --.. .?,,...... • ''< / ,-,\ ,,,,,,,, ,, N / 1.. , \ ': , F.. / \ ,' \ ,,' ■ , ,,, \ \ i / •.; ■ V- ---- -- '' , \ / Outlot A E X C E10 T. UNTY CONDEMNATION AS SHOWN ON PLAT OF — PHEASANT HILLS PRESERVE , 1 2(04 ern' °F 4:4 LAN-Pc, Line 0/ N. 1100 0. ,• Outlet 0, PHE easant Hills • • Preserve 12th Addition Lino lakes, Minnesota ED VAUGHAN 1431Plieasi:st Hills Dike MNSSOMI LOUCKS ASSOCIATES rum • 0d* • lands* urn., Awhile* • buisen* Oda • 270•11.ack -5vbe Wm..* I.••••n 11.{.1=17E3100.8135 00■124•360 unnehr•Maptuam Pg-24F-1 11°772g \ 'S .. ■ . 1 1 ----- ' , ---) --- , i SleniMsre• r r • r - I L _ 132036 WETLAND Outlot B ...a Mt LEGEND Pismo - • - NORTH 00 120 %MUM= SCALE 10 FEET Misname 5ITE LAYOUT PLAN 911331 C?-1 • • heasant Hills I Preserve 12th Addition Lino Lakes, Minnesota ORDINARY HIGH WATER LINE Outlot A Li Rie4.m lo- a18€F0P- AESEAVA1IO0 /eI TBUCIIIM LIMITS Svs erk �g: er ED VAUGHAN 1432P102104 NM One Lim lakes, MN SAM LOUCKS ASSOCIATES • ~ MM.gn aeYrwn tnem�a.ts Ono 4lmfeen4441 o A.M. +,nA.e+gT�.vn I CAM 4Inlem REMOVE AND RECON5JROC,T, 40 CITY STANDARDS. r, / \ \ \. / / / NORTH ,oeeersw..anl 00 120 E GRADING, DRAINAGE & EROSION CONTROL NOTES 1. TM ...too meI relar %1004 mnllec 44, pen lm =rims e twits p•vlw.s vla a �a1 Pe e.P. nn vmeles..mnm. Iruex Pent A cN- m see «� we rope a wee 1» mlm. ar I e e ri eIrt. n i11 see m .ter .1°." m Pr =5 neon-• l' „V prrmerlY "-ma In n,r..lrrr�ltn pmeIme Pebm eek�� v.memrilb. lveerrnbv 4. Tm mama.. . 6! .m.. let me.. me mpn4*444 IMIk eon. ilmicss much rf spry m iMnNHmatymP, Ibgm me me 14 x e1.Y r ,YY .nvry mime. vl Itemapor.11.0 feenemm. m- emrM sM' rA >mubemlYm smAllime m M Ise Ms9 �•m ne t mpY emelP•wsD mre >nei ee I not ro wmm •m*PW nwna. N M�•vrvsl 4ne4 er - MnWentlrrmr Iv 4neael emntMbn -eev vi r Nr emrrmen s e Y nmvmnvs h ot mm M. emmlAmlen sae. 'mmOeY v 1, a e l le e r e emnang em e e h b n Menem melec4 Fey 540 Peei Lnirmee Poe bvelbn p t prober. n tlpeW er st.e as: i�Me ae�l p a. Om. mn 44 4414 mnen cm. Innmmes NM be o14Mn. emu.. 54 min MIOm me s emvmmWe vNn NPOES wmmH r Scene I uu. Be M- lemmep PrvelOO. • .r emmu m me nl.a t n m e v ben ten. m mlrmees me mPr Me ellmra m - a. eU Iq InMn; vmlm ay. n .nPmame Im p ovmva m! mllrc W. See Only pion end peem imago kr Partner de. rem., ere plump nw, Q. v mnvmwr. . Fee. may not /Mew. M m pew. sees .mtrm rot meets eansMeree m n•ee. Ie. each b. 1p, mammy a Ins •e se tan to ...nee Moms Ie In eFlmq r••e•y LOWEST BASEMENT OPENING.1189.6 LOWEST BASE1AENT =808.6 DNR PROTECTED ELEVe=883.7 100 YP, ELEV =887.6 LOWEST BASEMENT OPENING =809.6 LOWEST BASEMENT =088.6 506 BORINGS DRILLLEO BY 515 CONSULTANTS p! 3/6/2002 F0 — DENOTES A PLAT HOUSE PAD THAT WIlt AL ON CONSTRUCTION DF A 1W0 STORY, RAMBLER. SPLIT ENTRY. FOUR LEVEL AND MODIFIED TWO STORY HOME5. FBLO — DENOTES A NOOSE PAD WITH Feat FEET ELEVATION DIFFERENCE BETWEEN THE FRONT HOUSE PAD AND REAR H0115E PAD. 1145 WALL ACCOL400ATE TWO STORY LOOK —IRS, RAMBLER LDDR—OUTS. FOUR LEVEL. 1400■IE0 1W0 STORIES AND SLIT ENTRY WALKOUTS. FBWO — DENOTES A HOUSE PM WITH E16H1 FEET ELEVATION 014FERENI1 BETWEEN 11E FRONT HOUSE PAD AND THE REM HOUSE PAO. 1045 WILL ACC044000 E TWO 5TOR1 WALKOUTS. RAMBLER 04100415, POUR LEVEL NAL0DUTS AN0 MOWED TWO STORIES. SCALE IN FEET - TAe..t . 2 tp ;;EP 0 2004 f CITY OF, Lt, yet LAKE* i I PmI®Mnals� � •.mn n., l mom CIVIL LEGEND SPOSIPPIT UAW. n P W AMI W R `e 014.6 SPIT 1[11.11011 5711171.1 50•11 SPPRAOP LOA 4 Amman • O -» - GRADING & DRAINAGE PLAN 911331 O U N T Y C O N D E M N A11I O N CUSTOM GRADED AREAS LOTS 1 -5 WITH RAIN \\ GARDENS WETLAN ,100 YEAR FLOOD LINE Edge Of etlond Pheasant Hills • Preserve 12th Addition Lino Lakes, Minnesota dbevemperNene ED VAUGHAN 1133 Phasml1NB Drive Lino Lakes MN MOM 00010:0301 semae loucKs ASSOCIATES /03010011. 5.. LO 3 .ms 00TeP _ :� 453 FB —. DENOTES A PLAT HOUSE P00 1HAT VAL. ALLOW CONSTRUCTION OF A TWO STORY, RAMBLER. SPLIT ENTRY. FOUR LEVEL 0310 100DRIED TWO STORY HOLIES. FB1.0 — DENOTES A HOUSE PAD WITH 10133 0E01 ELEVATION D IFFERENCE BETWEEN THE FRONT 0005E PAD AND REAR HOUSE PAD. 1105 WILL ACCOHO0ATE 1010 STONY 1000 -01/15. RAMBLER 01115, FOUR LEVEL. 3000000 TWO STORIES ARI Sill ENTRY 1 4115. • DENOTES A HOUSE PAD WITH EIGHT FEEL ELEVATION ONCE BETWEEN THE FROM H005E PAD AND THE REAR HOUSE 01 THIS PALL ACCMODATE 100 STORY WALKOUTS. RAMBLER U15. FOUR LEVEL WALKOUTS ANO MOODEO TWO STORIES. GRADING. DRAINAGE & EROSION CONTROL NOTES l�•an mlw » veer h the 00eelum Wm Iv erect NMI. and 0003 a 0003030. 00 . m 00An9. •.I wen n. tern, fives ewes 0etl w e�un a tome aeu 3x03 ee .nlvrW e�x One vmlrnelm unlP�Iw wtl w mM n300 100 0000 3 0009 eI e• iwi wannmWN Ie anY."00;00 9 �N:e:I : e0e.;i naa.99 dv :, • • Pwnhge em 491101..44 x03 rental s le rah °ohm neeevwY. Peeemml ellhme ant. sheP l9 axwnanT. Troth mnbe ld= •Pen aa� von 33 00ex penal,' .MS IM 003 r 20lm 00 Ieeelbe a44 lsmeme9 anl� be 91 ihe mire. 1. requirement .aI mess an00 .0.03 end mI ha 0.00.., 11900401 nee. evee met M m w9q em e. seNNts manures M. a nem We construe. Me. e Temper. Red Entrance 00.1 u m Pa.s aI .emel�e ii u� pe al em t. me project. En ,. Pete. 00 Ss. 9m an . e° E.3.3 el el In prefect o.e. Mellen el S. Lecertes and Sed.entegm contra Memo. Snon be est... awed Per en. Alentrances and tenaCPtmem Icite•eet.aa peek Red Per axenlmeteem. rumba, by e ell, rte er e ON sp peon. sod N. se. u WIT men and Mom 00.03 0°190 la 10e15a m9a 11000x9 Ilse •term sees. K el*. are as node. N eP/anwl4n pone 11 0 0 311 ea S 030x03 met ban rt... end P. peal. 93.., 1R E PRESERVATION ZONE/CONS 11.1311133 0111.111 ROT 1500003: OONR0 Caad: VIA P1000PLAIN FILL: 2400 Cu M. 50L BORINGS PRIMED BY 515 CON51A1 ANTS ON 3/6/2002 51000.00:' AIL OVIL LEGEND PROPOSES 3(0.9 Steens MKT. 0 II RPM. 112 112 nP000 00 nRN SPOT UM. �'�• —i STOW SEM — > >�— MOP if EMI@ MAME MALL EMMEN, tea TREE Surf /03x11121Iw 11011S PIS la Edge 01 Welland ORDINARY HIGH WATER LINE (883.7) MTV LOWEST BASEMENT OPENING =889.6 LOWEST BASEMENT .4386.6 NORTH SCALE IN FEET ONR PROTECTED ELEV =883.7 100 YR ELEV =BE7.E LOWEST BASEMENT OPENING =889.6 LOWEST BASEMENT =006.8 1 51001100 GRADING & DRAINAGE PLAN 0001 50.: 911331 C3.2 • MIN DOR SILT ta.■ FOR DETRE C o UNT Y CONDEMNATION :-TE!"' 6 ZON • .____ \ „r< -- _-- „ «;-I -.‘ ■•,'_.-. :_,—\ _- _ -..,'”; .• - __ '\ ----\ -:- - \.\ - '.-'-\ .-:-:: - \ \ , Y — - \' \ _, \ V — 1 \ \ \ ' \ 1 I 1 \v;r '\ \ ) , ) I I 07)7T 661 FEM. EROSION CONTROL NOTES. 1 AMC SOR COOMIONS AMWOR MLLPIG row,,Fri.,. O-6.11g Oil.. TM TOP TIOM EMT Ms Or 1. UM- PIRE MM. SM. 12 C01.170 10 Oft ..111. 0111,7n1g1RAIIRIALI. e ennierme SIMS MSIALR SILT mixt PRIOR TO MOILOCI. ammo ernemrs we smut M.A. SAID KM OLOA11. 0.1.110, ntrIZIA TSTRIVS Tt:C"OrtrarlISML"7141... T•E v.. ...ALL AS riMMICO sm Exop.E. 7a MUM" 7 1117 01110011*7 SMIRS SOM.. MS OPERATE. TO .1./. DIST)RMCD ARCA AT S. 1:11141:117.IRCEI WAS SO 11010020 VOX MOM or r. 10P SOIL r.r.1.47 11144,1)1= 14.7,1LITIC,11 ollislo 72 1.03.3 Or .1.11. or arir.nrolsnolIV."firo otts"A "."'" u"" r'"‘"' 17La OR PLLOMMIE .10.1. 11,1 SEED ""Y'brkr.comoT 7 SOP 11.1.4,1% KATI 191110,..11.1 IMEAMILLY removoio 105 71( SEM OMILVE mom or A .P.ATI M MUSS MOM WE- ... Do 1st PR. 7. MEM. SMCCI COMIRLETti 7,11A,VEVELDPER SHALL MAN Too MEETS DI An DR- .ERI AME MU.. M. ARC 1110 80 . (0(1105)711 017 71110710 RIP-RAPIP... Pa3.1 .01-rEZICILITI WILMS siNOCR 7MC MILI7T MOM" 11.1 MED. V170 APPLILAVLE at77 YA7017111C0 II1370ILT SIANBARDS le. jiiiiilk0,076.113.0.113. SuAti. 1711,11,1 MI Or R■PlaT/013 It Mc PA1rS C.STROMM AS PART Cr C.... MOMMIN mom CIVIL IDIOM wocem 136.111 mummer nee emus WO • WM wit al *I IR pen.. mono. NNE 77111100 oristmE 1.10/1 N. • Oro. e. Pe—establish top.. disturbed [seas 171.°Z 'errnuirn" dbivrbed Isem c. Mum.. posbio "1.7"tel and mulch mos 0101740gr7*l0074 IA be comoleled MIM 10 artIrP,„°,1 "ErliTaF". ' 10.74.11V7.17.„ ORENNAM HIM (7ATER LOIS (503.7) 8111 ((NU CONSTRUCTION or A SILT EKE SILT MACE .IIITMAKE 111055011 7.r.r:ar....477.1"p:JarrgarnorecUsspn"47.::=1 CAM ORM ORS.COTION (tn.) MR OEMS VIC NORTH 0 00 120 SCALE 15 FEET 7 7777 ;4'17" ROCKENTRMOC17 TO CONSTRUCTION SITE easant Hills Preserve 12th Addition Lino Lakes, Minnesota ED VAUGHAN ND Phnom Nth Dine Lino Lakes, 00 55030 IoucKs ASSOCIATES Plamlo • • M... .7 IssiadobtATZestrEmasAmeemels. OvafilvEnno. OMR I Ow. Indo_ LIO ▪ Rest 0..flom EROSION CONTROL PLAN 911331 I Nos • ORDINARY HIGH WATER LAM (1383.7) \ / 1 I ( S. 1 \\ \ ( C c :.„.,/ / ( ,' ) ' -,, • -7 -- ' ' - , ‘•• 'A.. ) NI -1 ( ' \ ' I .1 ' / ) , \ i i 1 1 1 „.-1,- -- -k -- ' 1 1 ill ' / /' ,, , i ! —7 r; 7oim TREE PRESERVATION GENERAL NOTES CONTRAC7OR shob en see. coulee Ow cons1.1.n ImIls NA... convect. st Nes reels. Ine CONTRACTOR prelectIen cea. specific 1.111cent Nees .....11en by fv=141154"jrn"lii701 li:711;IiSiS• Ism CIVIL MEMO nom Tee CONTRACTOR ANA have Nees poinr en slIe el ell 11 en Dalt Is wounded soeslrueli.. Aye CONTRACTOR 17"r1W":"D7e7s:s"1.1:171.1=1:iii"rf 'Arron".0%ns reltree7"; Ofeclee _O. NAL 1. TRACTOR .. Anm.lely unto, Me OMER. Oro AD 4. torn pontos! the CIO ENDO. son. entl/eir elher 10008 PROTECTOR ZONE - XEEP OUT ,TREE PROTECTION TYPICAL PLASTIC TAPE (NTS/ TREE PREITECTION AREA Ass.s.so nes • AA. tnnt 134S700 GRADING AREA: LOTS 1-5 EACH LOT PILL FE EXAMINED 10 mmesizr TREE ROADV A PLAN DEMING TREE PRESERVATION WILL BE PRESE TED WHEN BUILONG PERMIT 15 APPLIED FOR 7 1. V A 7 0 SPECIFICATIONS. MONUMENT h1012711 0 70 120 SCALE 114 FEET CONSISTS IN A POST ARD 0 TREE PRESERvATION SIGN TREE PRESERVATION SIGNS NOUNTED OLISH NON WE TOP or TIC P0810 rATIEMED VIM NMREMOVADLC SERENA OR R.NETS POST MAT S SOLIARE TREATED AILIOR OR GOER LITT APPROVED MATERIAL POST INSTALLATION 11071140E0 TO m 1E100 DE FOUR FEET AMINE GRADE SET AT LEAST 12 MRCS IN THE GROUND INSTALLER AT VON LOT LIIE WHERE IT CROSSES A 10110 A MAXIM*, SPAC/NG Or 200 0001 107*00* 5(814* 10 ro.t0u 000410 (85100 VitV""' TREE PRESERVATION MONUMENT heasant Hills Preserve 12th Addition Lino Lakes, Minnesota 1*00100000(000410070 20 VAUGHAN 1432 Ph000r4 041142.10 Moo lak44 AN 54032 Loucks ASSOCIATES riaa* • le.341,Ing • .amlls.1.11maka 1147130*17001100 Aleppyl CA000... / "Itge 11773, ":43r±er ii.:Frietr7;'=r "Z:Ey WAX 1,9■1+ C1:1 Sheam kantmdan lahomMi. 40.70404,4.04na m mow, 1 51100 Tok. TREE PRESERVATION PLAN (70400 5,., 911331 I sm..: C3.4 OUNT Y CONDEMNATION ,, , „ t •-■ ■.- V , - WETLAND 44 — . t- ■ . ti .?-4) .,,:. .. , , a - a.. ' ' ', / ' sE. 41' ,,`S7'ttk,‘ I -•• . tk.,,AL . - -r----4%,.....`V., '''' ...''... ....I24.: , /,_ . ',.,,,Lc., la•C a, -'7, V ---, .,■ ,, \ - ' ''• \ \ •., „ % ,i lg.& _ \p, .. ' 4 PRESERVA3 •:--4, ... ■■%0 A , , • * s ' !-----„,' , 6 '', ' 4-,- -' rt - _;.- , ---,,.k.7"--/ '••• ' " --, ' - *": ,,-,.-:,-'. :‘ -. '' , $ ',`,' t , 1 • 6.. , r -7 — . , . '- ', ' 4 ' ' i 1.' ,, '-i se_ , ,' ;-• Ti- 1 / ,„; . CC .1v. " • ' • ■ th,---,w.,--' .: ' ' *-- —____. ...-... -----_____ si,,,,..„.y,--,.• ____ .4.--_,,,,, _.......„ TREE PRESERVATION GENERAL NOTES CONTRAC7OR shob en see. coulee Ow cons1.1.n ImIls NA... convect. st Nes reels. Ine CONTRACTOR prelectIen cea. specific 1.111cent Nees .....11en by fv=141154"jrn"lii701 li:711;IiSiS• Ism CIVIL MEMO nom Tee CONTRACTOR ANA have Nees poinr en slIe el ell 11 en Dalt Is wounded soeslrueli.. Aye CONTRACTOR 17"r1W":"D7e7s:s"1.1:171.1=1:iii"rf 'Arron".0%ns reltree7"; Ofeclee _O. NAL 1. TRACTOR .. Anm.lely unto, Me OMER. Oro AD 4. torn pontos! the CIO ENDO. son. entl/eir elher 10008 PROTECTOR ZONE - XEEP OUT ,TREE PROTECTION TYPICAL PLASTIC TAPE (NTS/ TREE PREITECTION AREA Ass.s.so nes • AA. tnnt 134S700 GRADING AREA: LOTS 1-5 EACH LOT PILL FE EXAMINED 10 mmesizr TREE ROADV A PLAN DEMING TREE PRESERVATION WILL BE PRESE TED WHEN BUILONG PERMIT 15 APPLIED FOR 7 1. V A 7 0 SPECIFICATIONS. MONUMENT h1012711 0 70 120 SCALE 114 FEET CONSISTS IN A POST ARD 0 TREE PRESERvATION SIGN TREE PRESERVATION SIGNS NOUNTED OLISH NON WE TOP or TIC P0810 rATIEMED VIM NMREMOVADLC SERENA OR R.NETS POST MAT S SOLIARE TREATED AILIOR OR GOER LITT APPROVED MATERIAL POST INSTALLATION 11071140E0 TO m 1E100 DE FOUR FEET AMINE GRADE SET AT LEAST 12 MRCS IN THE GROUND INSTALLER AT VON LOT LIIE WHERE IT CROSSES A 10110 A MAXIM*, SPAC/NG Or 200 0001 107*00* 5(814* 10 ro.t0u 000410 (85100 VitV""' TREE PRESERVATION MONUMENT heasant Hills Preserve 12th Addition Lino Lakes, Minnesota 1*00100000(000410070 20 VAUGHAN 1432 Ph000r4 041142.10 Moo lak44 AN 54032 Loucks ASSOCIATES riaa* • le.341,Ing • .amlls.1.11maka 1147130*17001100 Aleppyl CA000... / "Itge 11773, ":43r±er ii.:Frietr7;'=r "Z:Ey WAX 1,9■1+ C1:1 Sheam kantmdan lahomMi. 40.70404,4.04na m mow, 1 51100 Tok. TREE PRESERVATION PLAN (70400 5,., 911331 I sm..: C3.4 1 RE,C,EIVED I ::;EP 2004 CITY OF 1 iN Outlot A .513. 3 ENTRY. INPIATEN row NATETILM/5 IMOLA. INP•C • .4E Sin TENNANT 5 MATE VALVE NH 4 ;Fe 14.'41 ,, T „ ,-'-_-' \. '0,, / ,,. .x ---._ -- , / `i,- , — \ , / \ . \ , \ / , , , . \ / ,' , \ V- ---- — ■ e 1 1 .' . \ ,, / .S li 1 , / . \ 1 1 1 / \ . . \ I , IC UTILITY GENERAL NOTES son.. leen.. elerm saver end notermeln .1411. shod lurnhhed env se7 me 017*000040 o■ 1110 opeNnerobene. *77 .100 N. WAN. specilitaNen 97 Ow SANnare Walton el *sm. (ESANT, 11199 adllIaN Ad TOPE toenectio. le emcee. men... JEN be mended .1111 trr...111,11T'.':,11::7.:M=1'17 st\ 00000 ""'" 2 Sae Pad C8-1 end Me awned edeolikolla. sped. v0512 dela. and WAIN sere. Moth .1 least 45 nol e• nod lenoeellne nub. 9t415.. 5. A.LITemllz= and water Amnion Mad terminate at Me properly One on.. 5 The matrix. Mal NEIN GOPHER STATE OK CALL al 051-454-01302 al leost de hem pr.. ony ammo.. • underground mak. 00000007.0,41000*7010*0191*0*0.9010*0.00.1* the ...Yarn al Me ON- E, tralhe contra! PINT be provided h. The contractor and Mae he retobroPed Pa rmoimments el Me Emma. Wm.! el L.Ionn Nellie Centro, NeuTees (PINCI4) V. eba IN 1.0,41,0.,. daehers and baggers ot and Me DI Ned le • AenetnTat trl ."" A. nen nenerrne• muel nave o relemeal al 7, lea al ea., crrn" "..- 174.7 ME SINES Serae, 5.er Pet 4" SerNee la ereopty tfer11:'"' RCP CLASS 5 P3' diameter. POLYETHYLENE Beet el ewe. MN 2 INPVC 7C so-St • did 52.50 MANTLE EE PVC Outlot B NORTH 0 BO 120 SCALE IN FEET SLEW. EXTEND TO MARIAM ARO LENITY EASPENT. 2 SP( PESTS C3.1 AND C3.3 POP PORN St•IER SESEN Nam OPT MVP oonnomon.mme 0 =Ea • • eme•Rvt • >> ETE —1-1 1— 1 heasant Hills „ Preserve 12th Addition Lino Lakes, Minnesota NP • ED VAUGHAN 1437 Phnom Drive Lino Lake; MN 5503B LOUCICS ASSOCIATES el.,mme • o■liendreeft • Lerelaemenliens. • 1,...e1 • Trial.....e.dedefoo eme•pele. NANdentoDUR3.1.3.5 foe •••••■•22 Nye. 1 Ihologinnal SWAIM 1 Umld v exertnii ldereEmPeen ET INA.eceadann CIT BeimalkfmeMn C3.3 *Neva. [Yr cm N... ole: 1 UTILITY PLAN 911331 1 moo no • C4.1 I x ' X 1 0. 1 ' , 10. Of WWI PKAPPIP INDEME tfla OP P4 tr. n AM OPPIPAPAPIP PIUS PPLPS1771,, • 141.0,12.3,r UMW \LS- MP nso- tsr,,o4==arts,u 's.'• °idiot A -It k •-=-, • • ‘.; T E 5 C 1 1 0 N • .~a'a NORTH r i ' r 100 200 SCALE IN FEET 5804744 "313.a3,---_,.s, ? 7— T -T• P4 le. Par 170lal PRCIPLAW -■-. • a fit 2004 CTV O I.San.:—.S I t Ip 1 - _ ; " I sia.stn,. I I • I - somas — EXCEPTION P .)>-= ,.....',;,—.„41.4„--_—.;ie.,..,‘!,•.,,,-„,t7---,...... -., i- A' .-.,-.:::.......r,f4;. -,k,, --::•<,;y,:"....,-., \ /' '1 ' 1 , 1 '-c`•-•'`, 'N'---::.- ----.. -•:-..• '''. Ff.: V,' 'Z's_■-•..-- - 4•,:,z:•':-. •Z`'•:-.:•:•>: \ (.__--•:I'.--), --X '■.::;;','--:‘,-• ‘ ri,' ( , • , /-z------;(:--___.„- -- -,.<, \ \ , v. ',J.,..• ',...-7-----7/--------:-,:;•,',:,\ ,. ' ,•-• ■ , i: 1 ,' \ ‘.-:->:'\\,:::, 112 I --' 1 ' = , - --- irLA• .--) k -------/ • ,j -• r.-2.`-.-;•:‹' . . , 1 L.....--,-;.; , ;.•„:z E: 2,F17,1 tc• refs zotesud As Oak,/ — CanZI. PIrlfrc 0 • Ifta ZZ.',1r7CP °,41.tr' SEI0222.451T 80001 easant Hills Preserve 12th Addition Lino Lakes, Minnesota 000000100003006.00 1 ED VAUGHAN IlllObSl5010101IlSSjoS 1001ake5001550311 Loucks ASSOCIATES Ph., • 1.111piare.f Pr.brarwa 4.Paamesol PPP • Tteoltanktrilme•Me ISIte• 1051000000100601 Pas PILMOLSIPIP "mmlnrrhamr■praunno WEILAND SZIS.22,91f. 380.47 OuBot B EXCEPTION WEILAND ... -. , '7 '' ----- • X / 3--- '11 / /1 ----'' \ ,/ X ,/ - 1 , 1 / •\ / i j ' I ----V ••• courouu ••.•• SPITT ELM CORRENT ZONING: R-X EXECIMM) PRITINTREO num. M-X MINGLE EMMY) PROPOSED DIDLERIC SETBACNS, MONT . 30 MET SIDE 10 FEU REIM 30 0207 580224020 309.80 269.2&111, MoN mom ass s. sus a rer 40616.;30430100!!8 el 01" 51- ssz r._ Mrg..18P.0211FT rrgre. taw or__ Clmt29.31 Rtrx 0—Assx. i or3F,A7.- 1110.V..7 ^ i 1,"16""MBA.PC,V. Na2.41151" 302.40 1,129.J2 I Fin! 11 — 5 sup. termer 1 S PRELIMINARY PLAT 91-1331 C6-1 4, O^I EDGE OF DECK (TYP.) NORTH B.M. ELEV. 894.32 LOCATION: TOP OF COVER OF EXISTING MANHOLE AT ENO OF EXISTING RUFFED GROUSE ROAD. 20' -0" ROADWAY 1 • -0" 70• -O' 1 f0• -O" 7' -O" RAIL - LANE jl C RUFFED GROUSE ROAD & —.- - - WORKING - UNE 6' -O" LANE 6• -O" CLUED RAIL • �__�`�� w rt- p TIMBER CURB (Typ,) FL FORCE SEWER �— MAIN SYSTEM 9" MIN. -2.0X FE WATER MAIN �1 SYSTEM 1 PROP. FINISHED PROFILE GRADE -2_01T LAMINATED RAIL (TYP.)� 'r ; ri „, •,__. ... 3" FORCE SEWER MAIN ® O8" WATER MAIN SYSTEM SYSTEM W/ INSULATION W/ INSULATION 3 SPACES 8 6' -0" = 78' -0" 2 -0" NOTE: ABUTMENT PILES ARE TO BE 72" DIA C.I.F. CONCRETE PILING. PIER PILES ARE TO BE 16" OM. C.I. P. CONCRETE PILING. RECTANGULAR PRESTRESSED CONCRETE BEAMS, TRANSVERSE SECTION THRU DECK SCALE: p• Y' 4 SCHEDULE OF QUANTITIES FOR THE ENTIRE BRIDGE ITEM NO. 2021.507 MOBILIZATION ITEM 2401.501 STRUCTURAL CONCRETE (7443) 2401.507 STRUCTURAL CONCRETE (3143) 2401.512 BRIDGE 5749 CONCRETE (37'33) 2401.541 REINFORCEMENT BARS 2401.547 REINFORCEMENT BARS (EPDXY 0047ED) 2401.601 STRUCTURE EXCAVATION 2401.601 SLOPE PREPARATION 2402.590 ELA5TOMERIC BEARING PAD TYPE 1 2402.597 EXPANSION JOINT DEVICE TYPE 4.0 OUANRTY UNIT LUMP SUM X (P) CU. 7'0. X (P) CU YD. 6714 (P) 50. FT. X (9) POUND X (P) POUND LUMP SUM LUMP 5U14 40 EACH 44 (9) LIN. FT. 3x12 TIMBER FASCIA ON DECK, BETWEEN R477 POC75 (71P ) 3x12 TIMBER FASCIA ON BEAMS BETWEEN PIER CAPS (91P.) SOUTH 0 ARCHITECTURAL TEXTURE TREATMENT AND COLOR SYSTEM SHALL BE AS DETAILED BY LOUCKS & ASSOCIATES. SEE ABUTMENT AND PIER SHEETS FOR PLACEMENT DETAILS. () INCLUDES ALL TIMBER, HARDWARE AND STRUCTURAL STEEL REQUIRED FOR RAILING. () INCLUDES ALL TIMBER, HARDWARE AND STRUCTURAL STEEL REOUIRED FOR TIMBER FASCIA. 'J INCLUDES ALL PIPE, CONNECTORS, INSULATION AN0 PIPE HANGERS REOUIRED FOR FORCE SEWER MAIN SYSTEM. 0 INCLUDES ALL PIPE, CONNECTORS. INSULATION AND PPE HANGERS REQUIRED FOR WATER MAIN SYSTEM. ITEM NO, ITEM 2402.595 BEARING ASSEMBLY 2403.502 TREATED TIMBER 071ANTITY UNIT EACH 2403.603 GLUED LAMINATED RAIL TYPE 1 O X (P) 2405502 RECTANGULAR PRESTRESSED CONCRETE BEANS 22' 1205 (P) 241 1.604 ARCHITECTURAL TEXTURE TREATMENT 2417.604 ARCHITECTURAL COLOR SYSTEM 0 x 2452.507 C.I.P. CONCRETE PILING DELIVERED 12" X 2452.507 C.I.P. CONCRETE PILING DELIVERED 16" X 2452.508 C.I.P. CONCRETE PILING DRIVEN 72" 2452.500 C.I.P. CONCRETE PILING DRIVEN 76" X 2452.519 C.I.F. CONCRETE TEST PILE X FT. LONG 12" X 2452.519 CAP. CONCRETE TEST PILE X FT. LONG 16" X 2503.601 FORCE SEWER MAN SYSTEM 4 1 2504.601 WATER MAIN SYSTEM 2511.501 RANDOM RIPRAP CLASS If X M BOARD FT LIN. FT. LIN. FT. 50. 7'0. 50. YD. LIN. FT. LIN. FT. LIN. 17. UN. T1. EACH EACH LUMP SUM LUMP 5U Cu. YD. DESIGN D� 2002 A.A.S.H.T.O. DESIGN SPE LOAD FACTOR DESIGN METHOD - H520 LOADING INCLUDES 77 P5F DEAD LOAD ALLOWANCE FOR FUTURE WEARING COURSE MODIFICATIONS. MAXIMUM ALLOWABLE DESIGN STRESSES: REINFORCED CONCRETE: Fc = 4000 P57 n = 8 ty = 60000 951 REINFORCEMENT PRESTRESSED CONCRETE: Fc = 8500 P57 n = 1 is = 270000 P57 STRANDS STRUCTURAL STEEL: 7y = 36000 951 SPEC. 3.306 DECK AREA = 6774 5.2. OPERATING RATING = H5 DESIGN SPEED = 30 MPH LIST OF SHEETS 610 TITLE TYPICAL SECTION & OU491717ES 2 1 GENERAL PLAN & ELEVATION \:I I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. NoT Fag LTC NO 22737 Cp145T3R o�iONN 2004 PLANS PREPARED BY: ERICKSON ENGINEERING 9330 JAMES AVENUE SOUTH BLOOMINGTON, MN 55437 RUFFED GROUSE ROAD ANOKA COUNTY PHEASANT HILLS PRESERVE BRIDGE LOCATED 0.3 MILES NORTH OF JET BIRCH 5T. ON RUFFED GROUSE ROAD OVER A WETLAND IN PHEASANT HILLS PRESERVE 12TH ADDITION. 6 -50' PRESTRESSED CONCRETE BEAM SPANS 20 FT, ROADWAY, 0' SKEW SPAN IDENTIFICATION NO. 507 TYPICAL SECTION & QUANTITIES SEC. 28 TWP, 31 N R 22 W CRY: LINO LAKES COUNTY: ANOKA DES.: TJW 1 ORN.1 NBB 7PR0,7. NO. CHK.: RAB 1 CHK.: RAB (SHEET 7 OF 2 SHEETS 1 w 305'-2" OUT TO OUT OF DECK 2' 7" 50' -0" 50' -0" 50 –O" 50' -0" J+' —¢ 887.. W. ABUT. w PT. F1c ^ .. a P _ i ¢ PIER I I I N PT. aB" r. a a v " w I —¢ PIER 2 %¢ PIER 3 /r o / a. PTT L "a w ., a w a _ (rrr W. PT. "O" a•� I/ a ¢� e I —¢ PIER 4 //� Wa PT. ..E" c w I� `. ld wlj_e_ I ¢ PIER 5 ¢ 887., E. ABUT.--, W. Pi. 'Y° a W.PT^ .G. A _ lI EXPANSION \ JOINT DEVICE, `GLUED LAMINATED RAIL (TYP.) ¢ RUFFED GOOSE ROAD TYPE 4 0 & WORKING LINE __ _ _ _ W. PT. "H' _ -- _ — _ — W. PT. ;1" W. PT. "K^ _ _ — – (j90 STA. 7 +85.95 �TA 2+ }5.95 �– STA. 2 +85.95 ).o EL. 893.73 1 EL. 893.30 EL. 892.86 J O 1 O] I \ W. PT. L o `STA. S +J5.95 i EL. 892.43 0 W" 3 'o I w N Z 5 U C'c' 1 Oti_ U 0p I I\ W. PT. M _ _ —' I `STA. 3 +8595 EL. 897.99 — t BRACKET 1 N'. PT. "N" W. PT. ^P" / STA. 4 +35.95 STA. 4+85.95 J EL. 891,59 EL 897.72 I , l BEG. STA EL. ..\_ W. PT. ••R^ ^ .. .\ .. :� OF DECK `TIM @ER 7 +83.36 & RAIL 893.75 MP.) �W.6 P7. `5^ " T " PTT ^.. I W. PT .U. 84118021 `TIMBER FASCIA ON SPACER DECK &BEAMS (TYP.) PLAN e W. PTF .�N,. .. n W. Pi. ^X^ I a W.4 PT. .V ENO OF DECK STA. 4 +86.53 EL. 891.10 : 00 I i^-'L I 2' -0" (TYP.) s I N�,p'.. v SCALE C� • . .. Z£1 F MT or; PROP. FINISHED LOW MEMBER PROFILE GRADE 3 -0 GLUED LAMINATED RAIL (TYR.) EL. 888.7 (TYP.) –0.87N � -- f-.E__. _ 1= "_'_I�1 —_ 1= = =.1= �f_.I_i_I�- 1=1=1= 1 _t =1=1= =I L... =� 1 —_f_=- t� =1= 1_L�M' .:s. SPAN 1 i;r PIER R SPAN 2 SPAN 3 :.ei: . _. �.,'i::: SPAN 4 i::+ SPAN 5 'rs SPAN 6 W. ABUT. - -- TIMBER RAIL8057 (778.) TIMBER FASCIA (TYP.) 1 PIER 100 YR. FLOOD EL. 867.6 2 PIER L APPROX. CHANNEL BOTTOM . 7 EL 893.7 3 PIER EXISTING GROIJNDLINE _ ®¢ PROP. ROADWAY 4 PIER — e+Ar�i i RANDOM WRAP CLASS III AVG. E. ABUT. 5 3' -0" THICK (TYP.) 6" GRANULAR FILTER RANDOM WRAP INCLUDED IN PRICE CLASS 51 AVG. BID FO RANDOM 7 ELEVATION RIPRAP• CLASS ID 6" THICK SCALE, — o' to' 20' CONSTRUCTION NOTES eETrrvrEO BY gtICT10N THE 2000 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. E Wow a La BENSON 'NOT LTC NO 22737 2004 THE FIRST TWO DIGITS OF EACH BAR MARK INDICATE THE BAR SIZE IN MILLIMETERS. BAPS MARKED WITH THE SUFFIX "E" SHALL BE EPDXY COATED. ENGINEER IN THE FIELD SHALL VERIFY PROPER POSITIONING OF THE BRIDGE PRIOR TO COMMENCEMENT OF CONSTRUCTION. IF THE BRIDGE POSITIONING 15 NOT COMPATIBLE WITH THE SITE WHEN STAKING 15 COMPLETED. THE SEALING ENGINEER SHALL BE NOTIFIED. IF STATIONING 75 CHANGED, THE REVISED PLANS SHALL BE SUBMITTED TO THE OWNER. RUFFED GROUSE ROAD ANOKA COUNTY PHEASANT HILLS PRESERVE BRIDGE GENERAL PLAN & ELEVATION I A. DES. TJW OR, N89 0.1. PR NO CIC1.18., RAB C1477., RAB SHEET 2 OF 2 SHEETS 1 • • • • IL` •