Loading...
HomeMy WebLinkAbout2004-182 Council ResolutionCity Council Lake/I -35W Interchange Preliminary Design • December 13, 2004 CITY OF LINO LAKES RESOLUTION NO. 04 -182 RESOLUTION AUTHORIZING PRELIMINARY DESIGN OF THE I -35W /LAKE DRIVE INTERCHANGE WHEREAS, improvements are proposed for Lake Drive (CSAH 23) and the I -35W ramps as part of the Legacy at Woods Edge project; and WHEREAS, it is in the best interests of the City to reconstruct the I -35W /Lake Drive Interchange in conjunction with these improvements; and WHEREAS, the City finds that preparing the preliminary design of the interchange improvements is the best way to increase the opportunities for state and federal funding to complete the interchange improvements; and WHEREAS, Anoka County will participate in funding the preliminary design of the interchange. • NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. That the City's Consulting Engineer, SEH, is hereby authorized to prepare the preliminary design of the Lake Drive/1-35W Interchange. Adopted by the Lino Lakes City Council this 13th day of December 2004. Ann Blair, C • Clerk Joh J. Ber' son, 'fvlayor • • STAFF ORIGINATOR: CITY COUNCIL MEETING DATE: TOPIC: AGENDA ITEM 6C Michael Grochala December 13, 2004 Consideration of Resolution No. 04 -182 Authorizing Preliminary Design, Lake /I -35W Interchange Improvements ACTION REQUIRED: Simple Majority BACKGROUND As part of the Legacy at Woods Edge project, improvements to Lake Drive are proposed that include signalization of the Lake Drive/Town Center Parkway intersection and both interstate ramp intersections, realignment of the northbound I -35W ramp and widening of Lake Drive. Because of the significant investment in these improvements the City has been working with Anoka County and the Minnesota Department of Transportation (Mn /DOT) to evaluate opportunities to include the interchange as part of the project. In April of 2004, the City Council authorized preparation of an Interchange Study to evaluate existing conditions and the proposed ultimate improvements for Lake Drive over I -35W. City staff and SEH, Inc., the city's consulting engineer, reviewed the report with Mn /DOT and Anoka County representatives in September of 2004. The total estimated cost of the interchange reconstruction, including the required improvements to Lake Drive, is estimated at $7.64 million. Both Mn /DOT and Anoka County agreed that the best way to increase the opportunities for state and federal funding is to move forward with the project development. As such, SEH, Inc. has prepared a proposal to complete the preliminary design of the interchange and Lake Drive improvements, obtain Mn /DOT and Anoka County approval, develop construction limits for right -of -way, complete the required environmental review documentation and prepare the State Transportation Program (STP) funding application. SEH has proposed to complete these services for a not to exceed fee of $148,004. City staff has discussed the proposal with Anoka County. They have concurred with the project scope and will fund 50% of the engineering design. The proposed project schedule is as follows: • City Authorizes Preliminary Design Complete Traffic Analysis Complete preliminary geometric layout December 13, 2004 December 2004 February 2005 City Council Lake/I -35W Interchange Preliminary Design December 13, 2004 Obtain staff approved geometric layout Finalize construction limits Complete project memorandum Finalize aesthetic recommendations Complete STP funding application RECOMMENDATION Staff is recommending approval of Resolution No. 04 -182. ATTACHMENTS 1. Resolution No. 04 -182 April 2005 April 2005 May 2005 May 2005 July 2005 •