HomeMy WebLinkAbout04/10/1989 Council Minutes1
COUNCIL WORK SESSION
APRIL 10, 1989
045
Councilman Reinert opened the Work Session of the Lino Lakes
City Council at 6:15 P.M. Monday, April 10, 1989. Council
Members present: Bohjanen, Bisel. Council. Members absent:
Neal. Mayor Benson arrived at 6:35 P.M. Public Works
Director, Don Vo1k;;Administrator, Randy Schumacher and
Clerk- Treasurer, Marilyn Anderson were also present.
The purpose of the work session was to review a Pavement
Management Program designed by SEH. Mr. Dan Boxrud and Mr.
Richard Moore representing SEH attended this meeting.
A letter dated March 15, 1989 from SEH outlines the study SEH
proposes to perform for Lino Lakes and explains what the
study will accomplish and how it will save money on road
maintenance. The program that SEH is proposing is similar to
the one performed for the City of Oakdale. The basic premise
of the program is "save the streets in the best condition
first and leave the worst streets until reconstruction is
required ". First seal coat the streets needing seal coating,
second overlay the streets needing overlay and leave the
streets requiring reconstruction. If citizens call and ask
why their streets are not being maintained, the Public Works
Director can consult his capital improvements program and let
the citizen know when his street will be either seal coated,
overlaid or reconstructed.
Mr. Reinert asked how this program would fit into the budget.
Mr. Boxrud explained that each street would be scheduled for
a particular year and the estimated cost would be provided so
that a capital improvements budget can be determined.
Mr. Moore presented a slide program further outlining the
program: 1) catalogue/ inventory each street on computer; 2)
Public Works Director would establish a maintenance history
of each street; 3) each street would be field rated; 4)
engineering review and structural analysis conducted on each
street; 5) recommendation for both maintenance and capital
improvements provided, and 6) a capital improvements program
designed.
There was discussion regarding the average life span of a
street. Street conditions such as "map tracking" and
"allegatoring" were also discussed. In addition, the need
for close inspection during construction was discussed. Mr.
Bisel noted that currently we have one street design standard
for new construction and suggested that design standards be
developed for different soil conditions. Mr. Stahlberg
explained that although there currently is only one design
standard he is requiring that streets be designed according
to conditions.
Mayor Benson asked that a written proposal be submitted to
the_CounciJ by SEH. It could than be followed by a contract.
046
COUNCIL WORK SESSION APRIL 10, 1989
Mayor Benson thanked Mr.
evening.
Boxrud and Mr. Moore for coming this
The work session adjourned at 7:05 P.M.
1
1
1
COUNCIL WORK SESSION
Mari
1
APRIL 10, 1989
047
These minutes were considered, corrected and approved at the Council
Meeting on April 24 , 1989.
F �