COUNCIL WORK SESSION JULY 24, 1989
Mayor Benson called the Council Work Session to order at 6:08
P.M., Monday, July 24, 1989. Council Members present: Neal,
Bohjanen. Council Members absent: Reinert and Bisel. City
Engineer, Ron Stahlberg; Administrator, Randy Schumacher;
Public Works Director, Don Volk and Clerk- Treasurer Marilyn
Anderson were also present.
Mayor Benson explained that the purpose of the Work Shop was
to hear a summary of the West Central Trunk Sewer and Water
Improvement Project, Phase II.
Mr. Stahlberg used two overhead project maps to point out two
possible routes of Phase II. The first route started at the
intersection of Industrial Boulevard and 4th Avenue, north to
77th Street, east to the east side of Lake Drive, then south
approximately 300 feet to the Rehbein property. The second
route started at the intersection of Industrial Boulevard and
4th Avenue, east through the Feedrite Controls property and
Rehbein property south of Lilac then to Lilac Street, then
east to Lake Drive and then north to the Rehbein property.
Mr. Stahlbergs second map showed all the property north of
35W interested in receiving sewer service. The area extended
to the north boundary of Lino Lakes.
At this point it appears that the route for Phase II is north
to 77th Street and then east to Lake Drive. There is little
resistance from the landowners and from an engineering
standpoint this route is the most logical. Mr. Stahlberg
explained that Mr. Volk and other staff people have been
visiting with the landowners and obtaining petitions for
services.
Mayor Benson asked what problems are caused by the alternate
route. Mr. Stahlberg explained that this route would not
help to get the services north to the other areas requesting
services. It is also probably the highest point in Lino
Lakes and from an engineering stand point not a good
location.
Mr. Stahlberg discussed the time table for Phase II. The
improvement public hearing is scheduled for August 14, 1989
and since it will be a completely petitioned improvement,
fifty (50) of the sixty (60) day waiting period can be
waived. Mayor Benson asked what would happen if two
landowners did not sign a petition. Mr. Stahlberg said they
would not be included in the improvement, thereby leaving it
a 100% petitioned improvement.
Mayor Benson asked starting at the proposed Outlet Mall
(Rehbein property) and going west back over the first
proposed route, how many landowners will not petition for the
improvement. Mr. Stahlberg said two (2). Mayor Benson noted
that only 51% of the landowners are required for an
improvement project according to the Charter. This would
COUNCIL WORK SESSION
JULY 24, 1989
mean that everyone could be assessed. Also at this time,
these landowners could petition out of the improvement but
the City would pot have to accept their petitions.
Mr. Stahlberg continued his planned time schedule for the
improvement. The public hearing is scheduled for August
14, 1989. The improvement could be ordered and plans and
specifications ordered at the August 28th Council meeting.
Bids then could be let so that construction could begin yet
this fall. The Outlet Mall people want to have a least a
portion of the mall open by March, 1990. Mr. Stahlberg noted
that there is a lot of work to do; obtain all the right -of-
way, prepare the design and specifications, etc. A March,
1990 opening means a very tight schedule.
Mayor Benson referred to the second map presented by Mr.
Stahiberg showing the properties requesting utility services
to the north corporate limits. He asked if the only way to
get service to Main Street was through the Morehouse
property. Mr. Stahlberg said yes at this time. It was also
noted that the Morehouse property may be sold for
development.
Mr. Bohjanen asked about the property south of the proposed
Outlet Mall site and asked if the utility service could be
extended to this property. Mr. Stahlberg explained how this
area could be served. It was noted that the Outlet Mall
people are also interested in this property.
Mr. Schumacher explained that if Phase II is not treated as a
1009 petitioned improvement project with the ability to waive
fifty (50) of the sixty (60) waiting day period, it will mean
winter construction and the possibility that the deadline of
March 1st will not be met. He explained that he has met with
Jim Schilling, owner of the majority of lots in the
Industrial Park. Mr. Schilling has expressed a concern that
there could be large assessments on each of his lots because
of the long frontages and he may not get his money out of the
lots. Mr. Schilling also expressed concern that if he
petitions for the improvements and receives the assessment
the Council may not be too cooperative about what will
develop in the Industrial Park. Mr. Schilling has indicated
that if he accepts the assessments he would like the paving
and drainage to be constructed at the same time,
Mr. Schumacher pointed out three lots on the very south
portion of the Industrial Park and noted that these lots may
be a very good location for a water storage tower. He
suggested that this be considered by the Council. Mr.
Bohjanen asked about the condition of these lots. Mr.
Stahiberg explained that they do get the overflow from the
drainage area.
Mr. Neal referred to Phase I of this improvement and asked
1
1
1
1
1
COUNCIL WORK SESSION
JULY 24, 1989
Mr. Stahlberg to explain the problem with the location of the
utilities. Mr. Stahlberg explained that an error had been
made in surveyipg which has resulted in the current ditch
being in the wrong location. The error is being corrected
at no cost to the City.
Mr. Stahlberg told the Council that he has met with Mr. Uhde
who is developing the land on the north side of Reshanau Lake
owned by Mr. Robertson regarding the possible extension of an
easement between Black Duck Drive and West Shadow Lake Drive
on the west side of the lake. Mr. Uhde sees this as
something that he can live with. Mayor Benson asked what Mr.
Uhde's concern was. Mr. Stahlberg explained that the
preliminary plat shows Black Duck Drive ending in a cud -de-
sac and this would not allow extension of Black Duck Drive in
the future. Mr. Neal asked if the proposed extension of Black
Duck Drive runs through the Anoka County Open Space. It was
explained that it will and Mr. Neal suggested that Mr.
Torkildson would oppose the construction. Mr. Schumacher
explained that at this time the City only wants the necessary
easements.
Mr. Schumacher asked about the proposed boat ramp on Reshanau
Lake. Mr. Stahlberg explained that this is no long planned.
Mayor Benson asked if the City is still looking at putting an
additional cost on the golf course for the purpose of street
improvements. Mr. Schumacher said nothing has been done yet.
Mr. Bohjanen moved to adjourn at 6:37 P.M. Mr. Neal seconded
the motion. Aye.
These minutes were considered and approved at a regular Council meeting held
on August 14, 1989.
//I r
Marilyn G' Anderson, Clerk - Treasurer