HomeMy WebLinkAbout03/26/1990 Council MinutesCOUNCIL WORK SESSION
MARCH 26, 1990
Mayor Bisel called a work session of the Lino Lakes City
Council to order on Monday, March 26, 1990 at 5:40 P.M.
Council Members present: Neal, Kuether and Reinert. Council
Members absent: Bohjanen. City Attorney, Hawkins;
Engineers, Darrell Schneider, Ron Stahlberg and Dan Boxrud;
Administrator, Randy Schumacher and Clerk- Treasurer
Marilyn Anderson were also present.
ASSESSMENT REVIEW
Mr. Stahlberg gave a brief overview of the Sunrise Meadows
Improvement Project, the West Central Trunk Improvement
Project and the Comprehensive Storm Drainage Plan
Improvement. He explained that these improvements were
treated as two separate improvement projects and two separate
public hearings were held at two separate times. He noted
that during the period that these improvements were being
planned the Council approved an assessment policy for
existing landowners along a trunk line. Mr. Stahlberg read
the policy. He also noted that during this same period the
City Council commissioned a utility rate study and approved
rate increases that included a sufficient amount that would
be transferred to the Area and Connection Fund account
(revolving fund).
Mr. Stahlberg indicated that the initial feasibility study
for the West Central Trunk improvement indicated a rate of
$57.00 per front foot for sanitary sewer and municipal water.
He indicated the route of the trunk mains on the map. Mr.
Stahlberg then indicated that the final figures are going to
be very close at $56.00 per front foot.
Since the West Central Trunk Improvement began several
subdivisions have been approved and will be connecting to the
trunk mains. They are: Sunnygate, Sunrise Meadows, Parkview
Estates and several small subdivisions. Several more
subdivisions are in the planning stages.
Mr. Stahlberg noted that most of the lots in the Sunrise
Meadows subdivision are connected to the lateral lines.
However, there are several that are connected directly to the
trunk lines. There are nine (9) lots on Sunrise Drive that
have petitioned for water or sewer service. These lots are
on the lateral lines. Mr. Stahlberg noted that the lots
connected to the trunk main lines are assessed at a higher
rate than those connected to the lateral lines.
Mr. Stahlberg suggested that the Sunrise Meadows area and
surrounding lots be assessed as follows: the assessment for
lots on the lateral lines would be computed and then the
assessments for the lots on the trunk lines would be computed
separately. The total for the trunk line area and the total
for the lateral line area would then be added together and
COUNCIL WORK SESSION MARCH 26, 1990
divided by the total number of lots. This then would average
the total assessment over the entire area and each lot would
be assessed the same. Mr. Hawkins said this would be legal
providing the assessment was no larger than the increase in
the value of the lot.
Mayor Bisel asked what will happen to the lots on the west
side of Sunrise Drive and north of Fairmont Drive. Mr.
Stahlberg noted that Sunnygate, on the east side of Sunrise
Drive will be installing their lateral lines to serve the
future lots on the east side of Sunrise Drive, probably later
this year. At the time laterals are installed on Sunrise
Drive, residents on the west side of Sunrise Drive will be
offered the opportunity to connect to the utility lines. Mr.
Stahlberg noted that Sunnygate will probably be required to
install curb and gutter along the east side of Sunrise Drive.
He asked the Council if curb and gutter should also be
installed on the west side of Sunrise Drive? If curb and
gutter were to be installed, it would be necessary to install
the sewer and water connections on the west side at the same
time.
Mayor Bisel asked what will happen when the area between
Sunset Road and Sunrise Drive decide to connect to the
utility system? They too have the large lots and the costs
would appear to be prohibitive. Mr. Schneider explained that
this is not necessarily true. That area will have benefited
by the current improvement since the trunk facilities were
installed and paid for by those in the immediate area of the
trunk line. The landowners that Mayor Bisel is concerned
about will only pay for lateral lines which are generally
less expensive. This would be treated as a completely
separate improvement project and all Charter requirements
would have to be followed. If 51% of the landowners petition
for the improvement, all landowners will be assessed.
Mr. Stahlberg asked the Council if they were in agreement
with the assessment procedure he has outlined. It was agreed
that this would be the best assessment method for Sunrise
Meadows and adjoining areas. Mr. Schneider explained this
would keep the integrity of the rate for trunk lines in
place.
SECOND AVENUE
Mr. Stahlberg explained that the new Second Avenue will be
"stronger" and wider because it will be constructed to MSA
standards. He noted that there will be lots facing Second
Avenue from the Ulmer's Rice Lake Subdivision and some side
lots from Sunnygate will also be on Second Avenue. He
explained that the lots in Ulmer's Rice Lake Subdivision will
be receiving a street assessment equivalent to a residential
COUNCIL WORK SESSION MARCH 26, 1990
street assessment. However, there is a concern with the
Sunnygate lots. The assessment policy for Lino Lakes states
that only the front of a lot will be considered when the
assessments are calculated. This policy needs to be amended
to take into consideration such situations as Sunnygate. Mr.
Stahlberg noted that the developer has already been informed
that there will be some street assessments on those lots for
Second Avenue.
Council Member Kuether asked when sanitary sewer is
constructed on Rice Lake Drive, will the facing lots be
forced to split? Mr. Stahlberg said this would depend upon
where the existing house is located on the lot. The original
developer was required to place the home so that the lots
could be subdivided, however this did not always happen.
Council Member Kuether noted that forcing the lots to be
subdivided would force them to become even more non-
conforming.
Mr. Stahlberg asked if the Council was satisfied with the
manner in which he planned to handle the assessments for
Second Avenue. There was agreement.
Council Member Neal asked if Mr. Eibensteiner was installing
his own utilities and streets in Parkview Estates. Mr.
Stahlberg explained that he was and that there is a full time
inspector from TKDA at the site all the time during
construction. Council Member Reinert asked if it was common
to allow each developer to install his utilities rather than
require that the improvement be a municipal improvement. It
was noted that it certainly is not uncommon, however it is
very important that the City have full time inspectors on
each improvement and equally important that the City be in
full control of the development. In Lino Lakes this is
handled with a developers agreement. Mr. Schneider said he
would encourage the City to do all the improvements.
Council Member Neal asked if the information regarding how
the assessment rate was decided could be written in such a
manner that when citizens call him regarding their particular
assessment, he could explain it to them. It was decided that
whenever a citizen needed information about their assessment,
they should call staff. This would insure that all citizens
are getting the same information from the same source.
Mayor Bisel asked Mr. Schneider to revise the current street
assessment policy with regard to the situation of Second
Avenue and Sunnygate and bring the draft policy to the
Council for their review.
Mayor Bisel asked if the current lots backing up to Second
Avenue will be assessed for street improvement? Mr.
Stahlberg explained that they will receive both a street and
utility assessment at the time the lots are subdivided to be
COUNCIL WORK SESSION MARCH 26, 1990
sold. He also noted that there will be some lots in Parkview
Estates that will be subject to a Second Avenue assessment.
Mr. Stahlberg referred to several lots on the very south of
the Lino Lakes Industrial Park. He noted that the
configuration does not lend to good development. These lots
will be looked at very closely, to be sure that they are not
over assessed.
COMPREHENSIVE SEWER PLAN UPDATE
Mr. Schneider told the Council the Metropolitan Council has
formally approved the Lino Lakes Comprehensive Land Use plan
Amendment March 22, 1990.
STORM SEWER IMPROVEMENT UPDATE
Mr. Stahlberg explained that the improvement is progressing.
The land appraisals have been completed and legal proceedings
have commenced to acquire the needed easements. All of the
costs involved with the acquisition procedure will be added
to the improvement costs and spread out over the entire storm
sewer district.
Mr. Stahlberg explained that in some areas of the district,
the recovery of costs may be some time in the future. The
recovery of costs will come at the time development of the
land takes place and will be made part of the subdivision
costs. He noted both Sunnygate and Parkview Estates will pay
their fair share of the improvement.
The work session adjourned at 7:04 P.M.
These minutes were considered, corrected and approved at a regular
Council meeting held on April 9, 1990.
Marilyn G. Anderson, Harold L. Bisel,
Clerk - Treasurer Mayor