RESOLUTION AUTHORIZING PREPARATION OF REPORT ON IMPROVEMENT
CSAH 49 /CSAH 10
WHEREAS, certain development proposals have identified the need to improve
portions of CSAH 49 (Hodgson Road) and CSAH 10 (Birch Street) to accommodate
their additional traffic generation; and
WHEREAS, it is proposed to improve CSAH 49 (Hodgson Road) between the Rice
Creek Bridge and a point approximately 1500 feet south of CSAH 10 (Birch Street) and
to improve CSAH 10 (Birch Street) from its intersection with CSAH 49 to a point
approximately 600 feet east of Ware Road, in accordance with the Anoka County
Highway Department project review letter, dated November 20, 2002; and
WHEREAS, the City's Engineer, TKDA, has submitted a proposal to perform such
services; and
WHEREAS, Spirit Hills, Inc., and Bruggeman Properties, LLC have agreed to equally
split the costs of the report preparation
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
LINO LAKES, MINNESOTA:
1. That the proposed improvement be referred to TKDA for study and that they are
instructed to report to the council with all convenient speed advising the council in a
preliminary way as to whether the proposed improvement is necessary, cost -
effective, and feasible and as to whether it should best be made as proposed or in
connection with some other improvement, and the estimated cost of the
improvement as recommended.
2. That the City's Engineer shall not commence such activities until payment has been
received from Spirit Hills,. Inc., and Bruggeman Properties, LLC to equally split the
costs of the report preparation.
Adopted by the Lino Lakes City Council this 27th day of January, 2003.
Ann , City Clerk
J. Berge n, Mayor
• AGENDA ITEM 7H
•
STAFF ORIGINATOR:
COUNCIL MEETING DATE:
TOPIC:
ACTION REQUIRED:
BACKGROUND:
Michael Grochala
January 27, 2003
Resolution No. 03-13, Authorizing
Preparation of Feasibility Study, CSAH
49 /CSAH 10 Improvements
Simple Majority
In November of 2002, the City received a project review letter, from Anoka County,
identifying the minimum required improvements for CSAH 49 (Hodgson Road) and
CSAH 10 (Birch Street) to facilitate the development of Spirit Hills Commercial Center
as well as proposed future development on the Miller Farm, located immediately to the
south. The letter identified the need for the following improvements:
1. Construction of Eastbound and Westbound CSAH 10 left and right tum lanes at
Ware Road
2. Construction of Southbound CSAH 49 left turn lane at CSAH 10
3. Construction of Northbound CSAH 49 right tum lane and Southbound left tum
lane at Arrowhead Street (future access to Miller Farm)
4. Realignment of Ware Road, south of CSAH 10, to line up with Ware Road north
of CSAH 10.
5. Construction of Eastbound CSAH 10 right turn lane and raised pork chop median
to facilitate right -in /right -out access from the Miller Farm to CSAH 10.
6. Construction of Northbound CSAH 49 right tum lane and right -in /right -out access
(raised pork chop median) at the Ware Road extension.
7. Construction of Traffic Control Signals at the CSAH 49 /CSAH 10 intersection.
Since the responsibilities for the above referenced improvements are shared between
two developers it is staffs opinion that a City prepared report would be advantageous to
insure that a coordinated improvement plan is prepared. Both developers have
requested that the city prepare the report and have agreed to equally split the costs of
its preparation.
Therefore, at staffs request, TKDA, the City's Engineer, has submitted a proposal to
prepare a feasibility study for the above referenced improvements for a not to exceed
cost of $7,400. The feasibility study is intended to better delineate the extent of
improvements and associated costs.
• OPTIONS:
•
•
1. Return to staff for further review.
2. Adopt Resolution Number 03 -13, Authorizing Preparation of a Feasibility Study for
CSAH 49 and CSAH 10.
RECOMMENDATION:
Staff is recommending approval of the resolution.
ATTACHMENTS
1. Resolution 03 -13