Loading...
HomeMy WebLinkAbout2003-074 Council ResolutionCITY OF LINO LAKES RESOLUTION NO. 03-74 RESOLUTION AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS, CENTURY FARM NORTH LIFT STATION. WHEREAS, pursuant to resolutions of the Council adopted May 12, 2003, a study has been prepared by the City Engineer, with reference to the lift station, and, WHEREAS, the report provides information regarding whether the proposed project is necessary, cost- effective, and feasible, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF LINO LAKES, MINNESOTA: 1. The City Engineer is designated as the engineer for this improvement and he is directed to prepare plans and specifications for the Century Farm North Lift Station. Adopted by the Lino Lakes City Council this 27th day of May, 2003. AGENDA ITEM 7Aiii STAFF ORIGINATOR: James E. Studenski, City Engineer COUNCIL MEETING DATE: May 27, 2003 TOPIC: Resolution No 03 - 74, Authorizing Preparation of Plans and Specifications, Century Farm North Lift Station Vote Required: Simple Majority BACKGROUND: As the City utility service areas expand, the City must install infrastructure to allow for future growth. The area of the Century Farm North subdivision will require a sanitary sewer lift station to service the development and the surrounding area. The City Council accepted a feasibility study for the construction of the lift station at the May 12, 2003 meeting. The Century Farm North Lift Station will be funded through the developer and through city trunk funds. It is staff's recommendation to authorize the preparation of plans and specifications for the Century Farm North Lift Station. OPTIONS: 1. Return to staff for further review. 2. Adopt Resolution Number 03 - 74, authorizing preparation of plans and specifications, Century Farm North Lift Station. 3. Not adopt Resolution Number 03 — 74. RECOMMENDATION: Option No. 2 - Staff recommends that Resolution Number 03 - 74 be adopted.