HomeMy WebLinkAbout12/02/1976 Council MinutesDecember 2, 1976
IIIThe continuation of the special hearing for utilities in the Lexington Park Lakeview
area was called to order at 8:05 P.M. on December 2, 1976 by Mayor Bohjanen. Council
members present; Karth, McLean, Schneider, Zelinka. Mr. Locher, Mr. Carley and Mr.
Gotwald were also present.
Mayor Bohjanen outlined the procedures for this meeting. He asked Mr. Locher to read
the notice of publication and the notice that was mailed to all property owners in that
area. The continuation date was set at the first hearing that was held on November 16,
1976.
The Clerk was asked to read the petition presented by the residents of the area and the
names on that petition.
Mr. Carley then reviewed the discussions of the previous meeting. When a show of hands
of the people present at this meeting who were not present at the first meeting was
asked for, the majority of the people here had not been present at the first meeting.
Since this was the case, Mr. Carley went throught the explanations, basically present-
ing the same line of thoughts as the first time.
The draft of the proposed regulations for the installation of septic systems was discussed.
These regulations are being proposed by the PollutionControl Agency.
Mr. Zelinka asked if the Metropolitan Council will have the authority to enforce these
regulations and Mr. Carley said, Yes. Mr. McLean emphasized these are PCA regulations,
not Metropolitan Council regulations, and they are expected to be adopted by September.
IIIMr. Zelinka asked what the repercussions this document would have on the local commun-
ities? Mr. Carley said the Cities will be forced to employ an officer to be in charge
of the annual inspection of all on -site septic systems in the City. This officer will
also regulate where the systems are installed and the size of the system. This docum-
ent requires sealed tanks and if the existing systems do not conform, residents can be
forced to either rebuild or install an entirely new system.
Mr. Schneider asked if the MMTC was included in these projected costs, wculd this re-
duce the individual assessment and Mr. Gotwald felt that it would. Mr. Schneider asked
by how much? Mr. Gotwald said this had not been considered as yet.
Mr. Carley noted that institution has a two year extension to operate the current treat-
ment plant at that location. They will certainly connect, if lines are available, but
the City must order the system and be ready to construct before the State is approached.
Mr. Schneider asked about the total cost of the Park property and Mr. Carley said he
was coming to that.
Mr. Carley explained the City had applied for a federal Grant in conjunction with the
Cities of Blaine and Lexington for the construction of a water tower in East Blaine.
If this grant is approved, approximately $170,000.00 can be deducted from the overall
cost of this project. This is the estimated cost for installation of a well to serve
the area. But, Mr. Carley explained, this cost has been added in as of this date. He
felt it is better to inform the residents of the total possible cost.
IIIMr. Carley warned the people this system will have to be installed sooner or later.
If it is postponed, then they will have to deal with inflation and the new rules and reg-
ulations on the installation of septic systems and water systems.
The Park lands will be assessed as a part of the project. The toal cost being $86,000.00
l6
December 2, 1976
which is 42% of the total costs. Mr. Carley said the bids that are being received now
on other projects such as this are coming in 10% to 20% below the estimates. He felt
there is a good chance this cost could be included in the overall project and paid
for by the people in that area and the assessment would not be any more than these
estimates.
If the City is to pay the assessment, a 1.17 mill would be levied against all property
in the City.
Mr. Winger of Lakeview Avenue felt the project should not be ordered until more facts
are known on the exact costs. He felt these figures are too indefinite and the estimates
are clearly just estimates.
Mr. Gotwald said there are many steps to be taken before a project is ordered and this
hearing is just the first. Each step requires a Resolution to be passed by this Council.
The only way exact cost figures can be obtained is for this Council to pass a Resolution
ordering the plans and specifications to be prepared and bids advertised for. Even
when the bids are in, that does not indicate the project will proceed. If the bids come
in at 20% over the estimated costs, then another public hearing must be called. The
entire project can be abandoned even then.
There was discussion on the utility easements on the back lot lines. A gentleman asked
if the costs of securing a right -of -way on the rear lot lines had been put in these
figures. Mr. Carley said, No, it was assumed each owner would sign a quit claim deed
for the easement needed. If there is to be condemnation necessary, then thiswould not
be the most econ'mical way to install the lines.
Mr. Schneider said he and Mr. Karth had attended a Cirlce Pines Utility meeting and
discussed the possibility of obtaining water from that utility. The Engineers were
to have the figures to him before this meeting but they had not arrived.
Mr. Joe Davis, Sunrise Avenue, apoligized for not having the figures available.
felt this is a possibility that should be explored.
Mr. Munchou asked if bids cost the City any money. He felt that by getting bids a more
concise cost figure would be available. Mr. Gotwald said that bids cannot be obtained
until complete plans and specifications are prepared. This preparation cost approximately
6% of the total cost of the project.
Mr. Schneider said he had stopped in on a neighborhood meeting and these people had
offered to make up a survey form and canvas the area. He felt this might be a good
idea.
Mayor Bohjanen asked Mr. Locher how long can this hearing be continued? Mr. Locher said
six months from the date of the first hearing, otherwise the publication precedures
would have to be repeated.
Mr. Gruber, Lakeview Avenue, asked if there is likely to be any Federal Grants in the
near future to pay for this system? Mr. Carley said all the Federal Funds go through
the Metropolitan Council and are used to construct treatment plants and construct inter- -
ceptors. There are no funds available for communities located within a regional area.
Mrs. Wilson, Lakeview Avenue, asked about the assessment on two lots and on corner lots.
Mr. Carley said the assessment would be computed on each lot and would be the same
amount except for the unit charges. On corner lots, the first 150' would be credited
to the frontage, and the remainder would then be assessed, this is because a corner lot
i
December 2, 1976
can be divided.
Mrs. Diana LaRock, Lakeview Avenue, said she realizes this is a lot of money but the system
is needed because there are a lot of people in that area who pump their wash water out
on top of the ground. She said she took the petition and walked over this water. This
practice is against the law and she wondered what would happen to those persons septic
systems if this water was not pumped on top of the ground.
Mr. Beecher, Sunrise Avenue, wondered if anyone knew what the cost of installing a new
septic system is, particularly if it has to be installed according to the new regulations
coming out?
Mrs. Rector, Sunrise Avenue, wanted to know how this would affect her taxes, how much
would they go up? The Clerk said she didn't know.
There was more discussion on the survjy with Mr. Schneider suggesting this be done.
Mr. Regnier said they plan to formulate a questionaire. Mr. Davis said they would try
to get it completed by Monday Dec. 6, 1976. There was some discussion as to whether
people should sign or not. Most of the people felt the forms should be signed.
Mayor Bohjanen said the forms should be signed or the address noted and only one. form
to a household. He asked Mr. Davis how much time would they need to complete the sur-
vey? 30 days?
Mr. Davis felt it could be completed in that time.
Mrs. Johnson, Lakeview Avenue, felt the forms should be signed, Mr. Davis said it is
entirely up to the people - it made no difference to him; these questionaries are just
for informational purposes.
Mr. Schneider felt that in the meantime, the possibility of getting water from either
Circle Pines or Blaine should be checke and also MTG. sharing the costs. He moved the
Engineers be authorized to do this. Seconded by Mr. Zelinka. Motion carried unanimously.
Mr. Zelinka moved to adjourn this meeting until January 6, 1977 at 8:00 P.M. Seconded
by Mr. McLean. Motion carried unanimously.
Meeting ended at 10:15 P.M.