HomeMy WebLinkAbout07/06/1970 Council MinutesIII n n
3096 William Waldooh
3097 William Waldooh
BILLS: June 22, 1970 (Continued)
(3095) Northway Hdwe & Auto
(3095)
1
1
JUNE 1970 PAYROLL:
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167,
1168
1169
1170
Supplies for Parks .$ 19.06
Supplies for Shop 2.58
1970 taxes paid.by Mr. Waldooh on 30 acre 157.94
parcel under contract by Village.
Purchase of 1 additional acre of land out- =550.00
right from remainder of 30 acre parcel.
Ralph M. L'Allier
William I. Bohjanen
Andrew J. Cardinal
Henry H. Rosengren
Ronald J. Jaworski
June L. Emerton
Edna L. Sarner
Marvin B. Myhre
Virgil F. Lundberg
Richard S. Hauer
William G. Anderson
Lena Billik
Chancy E. LeVesseur
Albert Dupre (2/3 fees)
Gunder B. Gunderson
Roy H. Baoklin
Robert A. Lundgren
John R. Juleen
Keith Beecher
Imogene Secretan
Minutes approved at the meeting, of July 13, 197
$ 50.00
50.00
50.00
50.00
50.00
.300.00
600.00
225.00
200.00
100.00
100.00
50.00
25.00
59.97
75.60
425.25
351.00
178.00
31.05
42.25
Clerk-Treasurer
The special meeting of the Lino Lakes Village Council held on July 6, 1970, to consider
the bids on the new municipal building was called to order at 8 ;07 p.m. by Mayor
L'Allier with all members present. Also in attendance were Engineer Gotwald as well
as Glenn Rehbein and John McLean of the Building Committee.
The bids had been opened on June 29th at 11 o'clock a.m. by Engineer Gotwald, Trustee
Rosengren and the Clerk. The affidavits of publication of the ad and the ad itself
were read. Mr. Gotwald opened the bids and read them as follows:
1. Nordling Construction Co.: bid bond 5 %; bid amount -- $97,731; time- 4 to 5 mo.
2. Gladstone Improvement Co.: bid bond 5 %; bid amount-- $159,000;time- 6 mo.
3. Krueger Construction Co.: bid bond 5 %; bid amount -- $83,807; time- 6 mo.
4. Mattson Building'& Supply Co.: bid bond 5 %; bid amount -- $89,795; time- 135 days.
5. Metro - Metals, Inc.: bid bond 5 %; bid amount -- $1012,668.00; time 90 days.
Mr. Gotwald had informed the company representatives present that he would tabulate
the bids and would report on them to the Council at a special meeting July 6th at
8 p.m. The low bidder would be notified.
152
There was discussion on refunding the bid deposits. 1r. Bohjanen moved to refund the
$25.00 deposit to all the firms which had taken bidding specs, except, that as noted
in the advertisement, the deposit of the two lowest bidders would be held for 30
days. Seconded by**. Rosengren. Carried unanimously.
Mr. Gotwald stated that the two lowest bidders were Krueger and Mattson; therefore
these would be the only two to consider. Krueger had the lowest lump sum bid on a
Butler building, but he had only submitted a bid proposal and no specs. There were
several deductions which Mr. Gotwald felt were not legitimate since all the items
were included in the specs. These included the use of 26 gauge metal rather than 24
gauge. Mr. Krueger had not mentioned the exact type of slab and footings, and had
not included sidewalks. There was discussion.
Mr. Gotwald discussed the use of the 24 gauge metal with Glenn Rehbein as well as
the roof load requirement of. 401# /sq. in. He also noted that the Mattson bid had
a more desirable completion time. Mr. Gotwald mentioned that none of the bidders
had brought a 20 year guarantee, but that Mattson had a 5 year guarantee. He
stressed that the building must be absolutely leakproof.
Mr. Gotwald especially noted, the following items from the.Mattson bid: the panelling
would be backed with sheetrock; a 1" layer of Styrofoam insulation between the floor
and the outside wall; vinyl interior moldings, Kohler fixtures, coatraek, Formica
countertops, boxed in exposed beams in the Clerk's office;,200 amp electric service
and air conditioning. Not included were ceramics in the restrooms; however, the
rooms would be finished up to that point; no trim that could not be made at the
factory; no pipe protector posts. Also, there was not enough ,. room for the coffee bar
in the furnace roam but a chunk of the Council chambers could be out out for it.
Mr. Gotwald also read through the alternates and the deductions and additions.
There was some discussion on, the matter of underground heating as opposed to regis-
ters near the floor as well as on the matter of the canopy width. Glenn Rehbein
suggested that the wide canopies be left in the front but that a 2' overhang be
sufficient over the garage doors and in the back. Mr. Gotwald stated that the wider
canopies look better; that if the width overall was changed it would change the basic
design. There was some discussion on the two companies.
Mr. Cardinal moped that it be noted that the Council has reviewed the bidding specs
from Mattson Building & Supply Co. along with the Engineer and the Building Committee
and found the bid to conform to the requirements; that the original lump sum bid of
$89,795 minus the following deductions:
1. $2103 for using 26 gauge instead of 24 gauge metal
2. 1592 for using 8" insulation instead of 3"
3. 2732, for using a floating slab grade beam which meets building code
Total of $6427,
giving a net bid of $83,368 after deductions; also leaving the bid open to later
clarification if something should come up. Seconded by Mr. Bohjanen. Carried unanimously.
The Krueger bid with a lump sum amount of $83,807 minus a deduction of $821 for use
of 26 gauge metal instead of 24 gauge, leaves a net bid amount of $82,986. This is
$382.00 less than the Mattson bid. However, Mr. Gotwald noted that we needed a com-
plete set of specs in writing from Krueger for answers on several particular questions,
namely;
1. floating slab with 16" grade beam 6. type of doors
2. sidewalks and front aprons 7. any or all of painting
3. insulation 8. type of plumbing fixtures
4. paneling and backing 9. heating & air conditioning
5. necessary counter tops & coat rack 10. light fixtures
1
1
1
W. Bohjanen moved to have W. Gotwald contact Lyle Krueger on the above items and to
have W. Krueger come for an interview at a special meeting on Wednesday, July 8,
at 8:00 p.m.; notices of the meeting to be waived. Also that the Attorney be contacted
to attend. Seconded by Mr. Jeworski. Carried unanimously.
The Building Committee gave the following approximate figures for addition items for
the building and area:
1. .Well and sewer
2. Painting
3. Carpeting
4. Blacktopping
5. Sod and planting
6. Grading and filling hale
7. Air compressor,and welder
8. First interest payment
Total
$2000
750
1800
3000
.1000
1000
3000
6500
$19,050
This figure plus the bid would be nearly $100,000. It was felt that some items such
as the blacktop and shop equipment could be cut somewhat for this year and put on
the next budget. W. Gotwald felt that we had gotten good bids.
The payment schedule was checked and it was found that the interest paymeht in 1971
was due on March 1st; after that semi - annual interest payments would be on March 1
and September 1, with the bond payment due on March 1st of each year. The Clerk was
asked to check on the net amount left of the $100,000 bond.
Samples of paneling, brick and building color will be admaitted after the contract was
awarded.
W. Cardinal moved to adjourn. at 9:37 p.m. Seconded -by W. Rosengren. All voted aye.
Clerk- Treasurer
Minutes corrected at the meeting of July 13, 1970
The special meeting of the Lino Lakes Village Council held on July 8, 1970, to meet
with Lyle Krueger, d/b /a Krueger Construction Co., concerning his bid on the new
municipal building was called to order at 8:08 p.m. by Mayor L'A]lier with all
members present. W. Gotwald and W. Locher were also present.
Mr..Cardinal moved to waive notice of this meeting as time was so short. Seconded by
W. Bohjanen. ,Motion carried unanimously.
W. L'Allier stated that the Council had gone over the bids on July 6th and had voted
to return the deposits of all bidders except the two lowest which will be held for
30 days.
W. Gotwald stated that Mr. Krueger had had the lowest lump sum,bid amount and that
only one of the listed deductions was allowed, namely the $821 for the substitution
of 26 gauge metal for 24 gauge. W. Bob Coyle of Balco Building Systems, which
would supply the material for the Butler building, stated that the reason they
suggested 26 gauge was that the only color Butler had in 24 gauge was parchment.
He also stated that 99 -1/2% of their buildings are of 26 gauge material. The only
reason the other company can supply 24 gauge is that they use a wider span on
their beams, etc. W. Coyle felt that 26 gauge would be quite adequate for side
wall deflection and durability. W. Gotwald noted that the net bid price using
the one deduction would be $82,986.