Loading...
HomeMy WebLinkAbout07/08/1970 Council Minutesg Q) Mr. Bohjanen moved to have Mr. Gotwald contact Lyle Krueger on the above items and to have Mr. Krueger come for an interview at a special meeting on Wednesday, July 8, at 8:00 p.m.; notices of the meeting to be waived. Also that the Attorney be contacted to attend. Seconded by Mr. Jaworski. Carried unanimously. The Building Committee gave the following approximate figures for addition items for the building and area: 1. ,Well and sewer 2. Painting 3. Carpeting 4. Blacktopping 5. Sod and planting 6. Grading and filling hole 7. Air compressor,and welder 8. First interest payment Total $2000 750 1800 3000 :1000 1000 3000 6500 $19,050 This figure plus the bid would be nearly $100,000. It was felt that some items such as the blacktop and shop equipment could be cut somewhat for this year and put on the next budget. Mr. Gotwald felt that we bad gotten good bids. The payment schedule was checked and it was found that the interest paymeht in 1971 was due on March 1st; after that semi- annual interest payments would be on March 1 and September 1, with the bond payment due on March 1st of each year. The Clerk was asked to check on the net amount left of the $100,000 bond. Samples of paneling, brick and building color will be a+itted after the contract was awarded. Mr. Cardinal moved to adjourn.at 9:37 p.m. Seconde Mr. Rosenggrren. All voted aye. Minutes corrected at the meeting of July 13, 1970 Clerk- Treasurer The special meeting of the Lino Lakes Village Council held on July 8, 1970, to meet with Lyle Krueger, d/b /a Krueger Construction Co., concerning his bid on the new municipal building was called to order at 8:08 p.m. by Mayor L'Allier with all members present. Mr. Gotwald and Mr. Locher were also present. Mr..Cardinal moved to waive notice of this meeting as time was so short. Seconded by Mr. Bohjanen. ,Motion carried unanimously. Mr. L'Allier stated that the Council had gone over the bids on July 6th and had voted to return the deposits of all bidders except the two lowest which will be held for 30 days. Mr. Gotwald stated that Mr. Krueger had had the lowest lump sum,bid amount and that only one of the listed deductions was allowed, namely the $821 for the substitution of 26 gauge metal for 24 gauge. Mr. Bob Coyle of Balco Building Systems, which would supply the material for the Butter building, stated that the reason they suggested 26 gauge was that the only color Butler had in 24 gauge was parchment. He also stated that 99 -1/2% of their buildings are of 26 gauge material. The only reason the other company can supply 24 gauge is that they use a wider span on their beams, etc. Mr. Coyle felt that 26 gauge would be quite adequate for side wall deflection and durability. Mr. Gotwald noted that the net bid price using the one deduction would be $82,986. Mdr. Locher confirmed the fact that no new deductions could be allowed than those presented with the base bid based on our specifications. However, additions are allowed since we would be requesting them and they would not lower the bid amount. . Gotwald proceeded to.read the Krueger deductions which were not acceptable. W. Coyle proposed that the canopies be changed to 6' all around so that the extension beams needed for the wider canopies would not be necessary as they would show, not being covered like the ones for 6' canopies. He stated that over $2,000 could be deducted if they changed to 6'; also they had originally deducted some $4,000 for soft material because the Krueger people would do the work. W. L'Allier noted that the Council had decided on Monday night to leavy the canopy widths as originally planned rather than change the bidding specs. Mr. Coyle questioned whether we would get our money's worth out of the lined ceiling in the garage area. He stated that Butler's insulation had a hard aluminum finish which can be washed. Also the liner gives bad echo effects. He felt that the 8" insulation was cheaper material and gave some details on what Butler had in comparison. There was discussion on the virtues of 8" versus 3" insulation. W. Krueger was asked for his additional items. W. Ken Skoglund, representing Mr. Krueger, stated that the sidewalks, aprons and grade beam addition would be $2,200. W. Skoglund stated that they would install American Standard plumbing fixtures, a Troid heating system, with 2 units in the garage and a 160,000 BTU unit for the rest of the area. The air conditioning unit would use the same lines. A 4 -ton unit would be installed for the whole non - garage area plus a 1 -1/2 ton unit in the Council chambers. Mr. Skoglund said that they would back all the panelling; would provide 200 amp electric service, Formica counter tops in the Clerk's office, bathrooms, and coffee bar would be provided. They would also put in all bathroom accessories, all doors and necessary hardware, also the vanity, mirrors, etc. They would put in everything called for in the coffee bar; the overhead garage doors would be fibreglass, but the bottom panel in these doors probably would not be steel. There will be a 75 gallon gas water heater; water closets, sinks, eta. as called for will be provided. The restrooins will be finished to the sheetrock. They had put in a deduct for vanity, etc. since,they didn't feel we would put in these items until the ceramics were installed.. Mr. Skoglund mentioned that the plumbing would be done by Ron Grander of Hugo, the heating.by McGrath of Forest Lake and the electric by Rivard of Centerville. The duct work will be in the floor for both heating and air conditioning. , W. Coyle stated that a blanket of insulation would go around the building where it meets the floating slab; also the bottom panel overlaps the slab. W. Krueger stated that we could have any type of brick we want. The inside panelling would be 250sq. ft. as called for in the specs. There would be insulation on the division walls. W. Coyle showed pictures of the Butler,windows and panels, including their monopanel. Mr. Krueger stated that there would be no base trim until carpeting was installed; the.interior doors could be of oak, mahogany, or birch to match the interior paneling. The outside doors are plate glass, not insulated, having closers on them. 1 1 1 Mr. Gotwald emphasized that we still need a signed written set of complete plans from Krueger. Mr. L'Allier asked if the bid included the painting and was told "no ", that this would be an addition of $200 -$300. Mr. Krueger was told to put the baseshoe molding in the bid; this could be installed after the carpeting. Mr. Krueger stated that Rivard has an engineer who will put in all the requested fixtures for the whole job. There was more discussion on the liner in the garage as well as on the canopies and gutters, which the Council felt were unnecessary. Mr. Coyle stated that they would add $634 if they used the fibreglas insulating panel and would deduct $2,160 for not using the liner, which would save about. Mr. Coyle also showed the Council their various roof panels; the superior in colored or aluminum would cost $1,208 more than the standard roof. A charge of 1- 1 /2fi /sq. ft. would be charged for the 20 -year guarantee on the roof. However, they would only guarantee the regular roof for 1 year, feeling that a leak would show up in that time. Mr. Krueger stated that Midwest Erectors would put up the building, not Balco. Mr. Coyle stated that the contractor was then responsible for everything except material. On questioning by Mr. Bohjanen, Mr. Krueger stated that he himself has never put up a steel building. Mr. Gotwald felt it was not very attractive to be involved with so many peiple, because of responsibility and guarantee for things like roof leakage. There was discussion on the air conditioning which the Council wanted on the ground, using a double pipe system overhead. Mr. Gotwald pointed out that the Krueger bid did not net the specs in this case. Mr. Skoglund was told to check with their contractor to get the bid amount on the changes in air conditioning and report this to the Clerk, since they must conform with the specs; otherwise the whole thing would have to be rebid. Mr. Locher stated that there was nothing wrong with filling in where something was inadequate in the bid, but he questioned the guarantee between Midwest and Krueger. There was more discussion on this. Mr. Coyle stated that in the 900 -1000 buildings Balco has erected, they had had no structural failure yet. Mr. Gotwald countered that the taxpayers expect this building to last for 50 years. The Krueger lump sum bid of $83,807.00 minus the deduction of $821 for 26 gauge plus the addition of $2,200 for sidewalks, etc. gives a net bid of $85,436. Mr. Gotwald noted that the painting had not been included in the Mattson bid, so the $250 was deducted from Krueger's leaving $85,186. The difference in the two bids is $1,818 with Krueger higher than Mattson. However,' any addition for the change in the air conditioning will increase the difference. Mr. L'Allier wondered if Krueger would have to proceed with the extra work to make the required written specs, but noted that the decision would not be made tonight but at Monday's meeting when it is on the agenda. There was more discussion on the guarantee; Mr. Coyle stated that Butler will match any other company's guarantee. Mr. L'Allier commented that there was really no difference in this then, although there was in the contractor's guarantee. Mr. L'Allier stated that one other thing had come up; namely, that the bond funds invested in 'Treasury bills had matured and should be reinvested. After discussion on how to pay the contractor, Mr. Bohjanen moved to reinvest the funds having the first third of the bid amount come to maturity on the last day of August, the second third on the last day of September and the balance of the bunds on the last day of October. Also, it should be arranged so that the bank notifies the Clerk immediately when the funds mature; if they are not needed at that date, then they should be put into a daily interest fund until required by the contractor. Seconded by W. Jaworski. Carried unanimously. Mr. Coyle again brought up the subject of the ceiling liner; W. Gotwald stated that originally the Building Committee had wanted 8" material but had changed the specs to 3" to make the bidding equal. He felt that if the contractors wanted to hire mechanical engineers to fight out the advantages of the types of insulation, they could. Mr. Gotwald had talked to independent insulation companies for information and had found that the 8" was quite satisfactory. W. Jaworski mentioned that Krueger had put no alternatives on the insulation in their bid. W. Locher noted that any substitutions had to be equal to or better than those required in the specs; we can't just go by the dollar value. There was Some further discussion on vapor barriers and the insulation. Mr. Gotwald felt this was not a big item; besides there would still be a difference of some $300 even if Krueger;s deductions were made. Mr. Krueger was told to have the information on the changes in air conditioning into the office by Monday. W. Jaworski moved to adjourn at 10:02 p.m. Secondecy by Mr. CCardinal. Aye. Minutes approved at the meeting of July 13, 197Q Clerk— Treasurer The regular meeting of the Lino Lakes Village Council held on July 13, 1970, was called to order by Mayor L'Allier at 8:05 p.m. with all members present. Mr. Bohjanen moved to accept the minutes of the Board of Review hearing on June 18th as written. Seconded by Mr. Jaworski. Carried unanimously. W. Cardinal moved to accept the minutes of the regular June 22nd meeting as corrected. Seconded by W. Bohjanen. Carried unanimously. W. Jaworski moved to accept the minutes of the special meeting held on July 6th as written. Seconded by W. Rosengren. Carried unanimously. W. Jaworski moved to accept the minutes of the special July 8th meeting as written. Seconded by Mi. Bohjanen. Carried unanimously. The Clerk stated that the affidavit of publication for the Smith hearing (Ord. 6U) had been received as well as the June settlement from the County in the amount of $28,475.88. Also, the money from the bond sale had been reinvested to conform with the Council's wishes. A letter written to W. Blaylock from North Central Public Service Co. stated that gas lines would be run in Baldwin Lake Road this month. Literature on office furniture for the new Council chambers, etc. had been received from General Office Products of Minneapolis. W. Cardinal reported that he had talked with W. William Waldoch who had received the bill for the taxes on the 30 acre parcel and which we were liable for. Also, when the 2 acre piece was staked out for the new bidding, the piece had excluded the road easements, so it should have been about 2 -1/2 acres total. Mr. Waldoch felt he should have more money than agreed on previously. Mr. Cardinal suggested that we authorize the payment of the approximately $157 in taxes and authorize the purchase of 1 additional acre of land from W. Waldoch at $550. W. Bohjanen moved to authorize the same. Seconded by W. Rosengren. Carried unanimously. Mr. Cardinal stated that he bad the bill for 84 yards of black dirt delivered by Marvin Rehbein to the parks, and that there was no charge. He felt that a letter thanking Mr. Rehbein would be in order; the Clerk was instructed to write same. 1 1